Forwards IE Insp Rept 50-528/82-15 on 820426-28.No Noncompliance Noted
ML20054F160
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/27/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Andognini G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20054F161 List:
References
NUDOCS 8206150270
Download: ML20054F160 (4)


See also: IR 05000528/1982015

Text

n we x

dg y ~% ,% ,.  % 4 ,. w e

,- I

gg '4 7 1981

N )1

Docket No. 50-528

Arizona Public Service Company

P. O. Box 21666

Phoenix, Arizona 85036

Attention: Mr. G. C. Andognini

Vice President, Electric Operations

Gentlemen:

Subject: NRC Inspection - Palo Verde Unit 1 (Preoperational Test Phase)

This refers to the inspection conducted by Messrs. P. H. Johnson and

D. J. Willett of this office on April 26-28, 1982, 07 activities authorized

by NRC Construction Permit No. CPPR-141 and to the discussion of our findings

held by the inspectors with Mr. Andognini and other members of the Arizona

Public Service Company staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

No items of noncompliance with NRC regulations were identified within the

scope of this inspection.

1

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1),

d- ,

B206150270 820527 6-

PDR ADOCK 05000528

C PDR

"'"> . . . . .R.V /j k . . . . d., .,b...., ,. . , ,,, , , ,

W LLETT l RG....

sun m e) P. JOHNSON

,, , ,

jdZWETZIG

,

S

om> 5/ /82 5/27/82 Sb//82 Sp

. . .

. . . ./. ./ 82

.. . .. . .. ..

nec resu aie no compeu ono

OFFICIAL RECORD COPY ** ' *8 - 32"24

_ __ . _ _ _ _ _ _ _ ..

_

.

- -

_

,

,

,

,. . .

' -

~ Arizona Public Service Company -2 : MAY 2 7 1982

.

'

- Should you have any questions concerning this finspection, we will be

glad to discuss them with you.

Sincerely,

,

D. M. Sternberg, Chief

Reactor Operations Projects Branch

- Enclosure:

Inspection Report

flo. 50-528/82-15

bec: Df18/ Document Control Desk (RIDS)

Distributed by RV:

State of AZ (Gehr) 7

Resident Inspector (1) (f,TenaAd /

Engelken (1tr)

P. Johnson

.

.~

, .

-

,

  1. 8f0 0g

. jog UNITED STATES

8 g NUCLEAR REGULATORY COMMISSION

g .j REGloN V

. O, 1450 MARIA LANE, SUITE 260

% ,o'g WALNUT CREEK, CAUFORMA 94596

MAY 2 71982

Docket No. 50-528

.

Arizona Public Service Company

P. O. Box 21666

Phoenix, Arizona 85036

Attention: Mr. G. C. Andognini

Vice President, Electric Operations

Gentlemen:

Subject: NRC Inspection - Palo Verde Unit 1 (Preoperational Test Phase)

This refers to the-inspection conducted by Messrs. P. H. Johnson and

D. J. Willett of this office on April 26-28, 1982, of activities authorized

by NRC Construction Permit No. CPPR-141 and to the discussion of our findings

held by the inspectors with Mr. Andognini and other members of the Arizona

Public Service Company staff at the conclusion of the inspection.

.

,,

. .

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

No items of noncompliance with NRC regulations were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the

requirements of 2.790(b)(1).

.

r

-- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . . _

- . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,

Arizona Public Service Company -2- MAY 2 71982

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

I _ )

D. M. Sternberg, Chief

Reactor Operations-Projects Branch

Enclosure:

Inspection Report

No. 50-528/82-15

i.

- _ - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ _

j