DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE - MAY, 1982 May 1 Station is in Cold Shutdown mode 5 with Reactor Coolant through System pressure and Tavg. at ambient conditions.
May 8 May 9 Reactor Coolant System pressure and Tavg. at ambient through conditions. Type A Integrated Leak Rate Test is in progress.
May 22 May 23 On May 23rd at 0125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> began to pressurize the Reactor through Coolant System to approximately 65 psig. to support the May 27 performance of Type C testing. At 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> on the 23rd had condenser vacuum for condensate clean-up. At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> broke condenser vacuum due to problems with the Auxiliary Boilers. Condenser vacuum was re-established at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on the 27th and at 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> began to vent the Reactor Coolant System pressure to atmosphere.
May 28 Station in Cold Shutdown mode 5 with Reactor Coolant System through pressure and Tavg. at ambient conditions. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> May 31 on the 31st scarted Charging Pump [CH-P-1A] to begin fill and vent of the Reactor Coolant System.
f DUQUESNE LIGliT COMPANY -
Beaver Valley Power Station MAJOR SAFETY-RELATED MAINTENANCE - MAY 1982 1.
The Pressurizer Power Operated Relief Block Valves'[MOV-RC-535,."36]
have been replaced due to cracked seats.
2.
The Pressurizer Power Operated Relief Valves [PCV-RC-455C, 455D, and 456] actuator springs have been replaced because necessary preloading was no longer achievable.
3.
Work on 3-inch and 6-inch Velan check valves, to change discs, has been completed. A total of ten 3-inch valves and fourteen 6-inch valves have had their discs changed.
4.
Modification work to install a second Personnel Airlock on the Equipment Hatch has been completed.
5.
Motor bearings on Component Cooling Pump [CCR-P-1C] have been replaced.
6.
Modifications to the Emergency Diesel Generator's [EE-EG-2] Turbo Charger and Lube Oil system have been completed.
i 7.
Overhaul work on the Main Feedwater Pumps [FW-P-1A and 1B]
is in progress.
l I
1 OPERATING DATA REPORT i
DOCKET NO. 50-334 DATE 6/2/82 COMPLETED BY L. W. Weaver TELEPHONE. 417-641-9301 OPERATING STATUS I. Unit Name: Beaver Valley Power Station, Unit #1 Notes
- 2. Reporting Period: Hay, 1982
- 3. Licensed Thermal Power (MWt):
7'#0
- 4. Nameplate Rating (Gross MWe):
923
- 5. Design Electrical Rating (Net MWe):
852
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
NCn*
- 10. Reasons For Restrictions. If Any:
N/A "this Month Yr. to-Date
' Cumulative
- 11. Hours In Reporting Period 7&&
1610' 51 177
- 12. Number Of Hours Resctor Was Critical 0
0 21.059.29
- 13. Reactor Reserve Shutdown Hours 0
0 4,482.8
- 14. Hours Generator On Line n
0 20,154.06
- 15. Unit Reserve Shutdown Hours 0
0 o
- 16. Cross Thermal Energy Generated (MWH) 0 0
43,628,940.48
- 17. Gross Electrical Energy Genersted (MWH) n 0
13,650,440
- 18. Net Electrical Energy Generated (MWH)
~70'1
$eno, 12,505,785
- 19. Unit Serice Factor n
0 39.2
- 20. Unit Asailability Factor 0
0 39.2
- 21. Unit Capacity Factor (Using MDC Net) 0 0
31.9
- 22. Unit Capacity Factor IUsing DER Net) 0 0
30.4
- 23. Unit Forced Outage Rate 0
0 40.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
T" a iA
'oao
- 26. Units in Test Stat MPrior to Commercial Operation):
Forecast Achieved INITIA L CRITICA LITY N/A N/A INITIA L ELECTRICITY N/A N/A COststERCIAL OPER ATION N/A N/A (9/77)
UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKE T NO.
50-334
}
UNIT NAME liVI S linit #1 DA1E 6-10-82 REPORT klON(ll May COMPLEll D HY LJ.__Wemn.r lElf PilONE (412) 641-5301 I it :mee h
h4 Came & C..isettne
.5 E
'h h Ek Dec i
3g i
2s&
r.ent 7
H As t e.
i..
fE 2
35=
Rep.nl =
EU E'
Psevent itetnerent e u
6 019 12-25-81 S
3768.3 C
4 N/A zz zzzzzz 1
2 3
4 f: l'.u t eil Reason-tiethod:
thlnbil G - linions ti.wis S Silied u'cil A 1.quipment Failure (I.splain) 1-Hanuat l'or Pseparate.no ol Data It Mainstenance a.: Test 2-Manual Scram l'nts) Sheets los I.scemcc C Refueling 3-Automatic Scram 3 sent Repos t Il I HlI sic INIIRI G D Regulatus) Restrictient 4-Continued From Previons Month Ole.Il i Ope:Jtot Itaining d litenW l'xaminatiott 5-Reduction l'. Ad munst e.iiive 9-Other 5
(, Operation.nl I in : 11 mplain)
I sinhit I Same %uese l')/ 77 )
11 Olhes II'spl.ein i
.