Text
hHP 2030-'DC'-001-2 I
gg
>i Date Initials:
g0 10707 I'1ay 326, 1982 DOCUMENT ISSUE RECORD INDIANA& MICHIGANELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT COLOR CODED DISTRIBUTION DOCUMENT CONTROLOriginal MASTER FILEPurple LIBRARYGold "R",IVII.T-,PS;t,I,B TGIUAI.Ipj AAB)UIIegg T iLed T
~Lea OPERATIONS Green B eapgidIISTRplVE OrAnge Op. Super,SOE,Unit 1-2, Unit 2-2,TSO-2 en PLANNINGBlack MAINTENANCEBlue RLD ELOW JE)HIlICAL.
BPItik
~~ CONSTRUCTION YELLOW 8E-7,8F-1,8G-1,8H-1 DOCUMENTSUBJECT OR TITLE DOCUMENT ORIGINATOR:
DOCUMENT NO.
AND/OR REVISION NO. OF COPIES ISSUED EiKRGENCY PLAN PROCEDURE PERSONNEL EVACUATION ACTIVATION AND OPERATION OF THE OPERATIONS STAGING AREA (OBA)
AND PERSONNEL ACCOUNTABILITY Paul Carteauz Paul Carteaux PilP 2081 EPP.005 Rev. 1 73 issued PNP 2081 EPP.021 Rev.l 73 issued L" C'j
~ ) (
eJ n
si nature 82061 40P75 820608 PDR ADOCK 0500031 5,
DR Oate Document Issue Record Receipt Acknowledgement:
Documents affiliated with this D.I.R. 8 have been filed in file. Superseded documents have been destroyed or modified as applicable.
es 1ng ouse-J.J.
Campbell xoc $
'OMMENTS AND/OR NOTATIONS:
- DISTRIBUTION AEPSC-NY
'"'Visitor Center-1 J.J.
Warnoc5.-2 NRC Site-1 Information-1 NRC Control 1 ed-1 S.J. Hilioti-1 R.F. Kroeger-1
r I
f.
'I
> ~
J
DISTRIBUTION Docket Fi.le..j RSB R/F RSB Plant File:
DC Cooi TSpeis BSheron JGuttmann R/F JGuttmann.
cgN o p
)gap HEIIORANDUtt FOR:
Thomas H. Novak, Assistant Director for Operat rs, DL FROM:
SUBJECT Themis P. Speis, Assistant Director for Reactor Safety, DSI SER TO THI ACTION ITEM II.K.3.25 FOR D.C.
COOK UNITS 1 AND 2
REFERENCE:
Letter to H. R. Denton from R. S. Hunter, "Status of NUREG-0737'tems,"
dated December 29, 1981.
Docket ttumber:
TAC Number:
Plant Project Manager:
II.K.3.25 Project thanager:
Review Branch:
Review Status:
50-315/316 40648 N. Grotenhuis J.
Hegner Reactor Systems Branch Complete The reference letter is Indiana and Michigan Electr ic Company's response to TMI Action Item II.K.3.25 for the Cook Nuclear Power Stations.
This Action Item requires licensees to demonstrate that the integrity of their reactor coolant pump (RCP) seals is maintained (e.g., adequately cooled) during a loss of offsite power event.
The applicant's response stated that the reactor coolant pump seals are cooled by two independent methods:
(1) The chemical and volume control system, and (2) The component cooling water system.
During a loss of offsite power event, the RCP motor is de-energized and both cooling systems to the seals are terminated.
However, the diesel generators are automatically initiated and within seconds, both the component cooling water and seal injection flow (part of the CVCS) are auto-matically and sequentially loaded onto the diese'Is.
Either of these cooling supplies is adequate to provide seal cooling and prevent seal fai,lure during a loss of offsite power event.
We find the licensee's submittal acceptable and request that you close-out Action Plan Item II.K.3.25 for D.C. Cook Units 1 and 2.
Should you have question regarding our review, please contact Jack Guttmann of my staff (X29442).
Orlgnal Signed By themis P. Syria Themis-P. Speis, Assistant Director for Reactor Safety Division of Systems Integration CC:
Ro Capla J. Hegner (PE% for II.K.3.25) t'!. Grotenhuis (D.C. Cook Pt4)
OFFICE SURNAME
~g~DIiTE mann CON
~"""8 "Gut"
..'......XZ944P...
DSI'RS Guttmann.gd 06/p /82, DSI:RSB S