g Northern States Power Company 414 Nicollet Mall Minneapohs, Minnesota 55401 Telephone (612) 330 5500 April 16, 1982
,n,f,
. s 7 vf,
NQ
.. s g[p Director
,c f [,,i,
Of fice of Nuclear Reactor Regulation
_4 c
U S Nuclear Regulatory Commission h,
<D 3
Washington, DC 20555 Q Q.? 'gg, p
Q PRAIRIE ISLAND NUCLEAR GENERATING PLANT f
Docket Nos. 50-282 License Nos. DPR-42 DT 50-306 DPR-60 Information Related to Post-TMI Requirements In a letter dated March 17, 1982 from Mr Darrell G Eisenhut, Director, Division of Licensing, USNRC (Generic Letter 82-05) we were requested to provide information related to the status of certain NUREG-0737 require-ments with implementation dates between July 1, 1981 and March 1, 1962.
We were requested to reply in accordance with 10 CFR Part 50, Section 50.54(f) within 30 days.
The requested information is provided on the attached sheets for each of the NUREG-0737 items listed in Enclosure (1) of Mr Eisenhut's letter.
Please contact us if you have any questions related to the information we have provided.
L 0 Mayer, PE Manager of Nuclear Support Services LOM/DMM/bd cc: Regional Administrator-III, USNRC
/
NRR Project Manager, USNRC Resident Inspector, USNRC d/
G Charnoff 07e s
Attachments
//
g@g 0
UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT
"'cket No. 50-282 50-306 LETTER DATED APRIL 16, 1982 INF0DIATION RELATED TO POST-TMI REQUIREMENTS Northern States Power Company, a Minnesota corporation, by this letter dated April 16, 1982 hereby submits information related to post-TMI requirements in response to a letter dated March 17, 1982 from Mr Darrel G Eisenhut, Director, Division of Licensing, USNRC (Generic Letter 82-05).
This letter contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY By L 0 MayGr Manager of Nuclear Support Services On this
/[
day of
'[
/f[# before me a notary public in and for said County, persona 11/ appeared L 0 Mayer, Manager of Nuclear Support Services, and being first duly sworn acknowledged that he is authorized to execute this l
document on behalf of Northern States Power Company, that he knows the contents l
thereof and that to the best of his knowledge, information and belief, the statements i
made in it are true and that it is not interposed for delay.
<P.
ArCru ea
^^
l;'". __
BETTY J. DEAN etany Pueuc wesesEsofA j RAMSEY COUNTY
- j:
w, conwn.se.on Eam ec 96 '#7 {;
o
.~-.
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
I.A.3.1 All Applicability 10/1/81 NUREG-0737 Schedule Requirement Include simulator exams in licensing examinations Implementation Status Completed 10/1/81 Remarks In our letter dated December 30, 1980 exception was taken to portions of Item I.A.3.1.
These areas have now been clarified by the Commission and we now believe we are in compliance with this item.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule l
l Description of Compensatory Measures Beinst Taken in the Interim
{
_ _ _ ~
i PRAIRIE ISIAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.B.2 l
Applicability All NUREG-0737 Schedule 1/1/82 i
Requirement Modify facility to provide access to vital l
areas under accident conditions
(
I Implementation Status Schedule relief requested 4
Remarks i
This item is considered complete with the following exceptions:
- a. Accessibility of equipment needed for the letdown and degassing function
- b. Qualification of loop B sample valves in post accident a
sampling system i
Schedule relief was requested in our letter dated December 31, 1979 for Unit 2 until the next refueling outage. Schedule relief will also be required for Unit 1 in the case of equipment required for the letdown and degassing function.
Justification for Proposed Schedule As noted in our December 30, 1980 letter our plant shielding study did not include the chemical and volume control system. Use of the reactor l
coolant vent system (NUREG-0737 Item II.B.1) was assumed. Control board wiring for the Unit 2 vent system is incomplete. The Unit 1 vent system is complete, however manual isolation valves inside containment were left closed to minimize the p.otential for inadvertent actuation. We now believe that locking out power to the power opercted valves in the system is I
sufficient to provide this assurance and the manual valves will be reopened l
during the next Unit I refueling outage.
Replacement of the loop B sample valves with fully qualified valves in Unit 2 was not completed as scheduled during the 1981 refueling outage because of equipment delivery problems.
Demonstration of Need for Proposed Schedule This work should be completed with the affected unit in a cold shutdown condition and is therefore scheduled for the next refueling outage.
Description of Compensatory Measures Beinn Taken in the Interim Alternative methods exist to direct letdown flow to the reactor coolant drain tank, pressurizer relief tank, or containac tt using air operated valves.
In the event of failure of the loop B sample valves, samples may be obtained from the RHR sample line..--
PRAIRIE ISIAND NUCLEAR GENERATIN3 PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BEIWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II. B. 3 All Applicability UUREG-0737 Schedule 1/1/82 Requirement Install upgraded post accident sampling capability Implementation Status Schedule relief requested Remarks The Unit 1 post accident sampling system is completed. The loop B sample valves for -Unit 2, however, must still be replaced with fully qualified valves. Schedule relief was requested in our letter dated December 31, 1981. Completion is scheduled for the end of the 1982 refueling outage (summer,1982).
Justification for Proposed Schedule These valves must be replaced with the unit in a cold shutdown condition. Replacement could not be done during the last Unit 2 refueling outage becasue of delivery problems.
Demonstration of Need for Proposed Schedule Valve replacement should be done with the plant in a cold or refueling shutdown condition.
Description of Compensatory Measures Beine Taken in the Interim 4
In the event of f ailure of the loop B sample valves, samples may be obtained from the IGUt sample line.
1 PRAIRIE ISLAND NUGLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II. B.4 Applicability All NUREG-0737 Schedule 10/1/81 Requirement Training for mitigating core damage a
i Implementation Status Initial Training Completed 11/15/81 Final Training Completed 3/1/82 Remarks This training was described in our letter dated August 1, 1980.
Schedule relief until December 1,1981 was requested in our letter dated August 21, 1981.
Justification for Proposed Schedule Delays were experienced in manning for a sixth shift of operators.
This resulted in a delay in achieving the flexibility to conduct the necessary training. In addition, the summer
)
vacation schedule makes training difficut during the summer
~
months.
Demonstration of Need for Proposed Schedule Initial training was completed on 11/15/81. Training for all required personnel was completed on 3/1/82. The schedule for initial training lapsed 45 days due to delays in manning our sixth shift and the summer vacation period.
Description of Compensatory Measures Beine Taken in the Interim 1
Training was completed for all non-shift personnel (e.g. supervisors, engineers, and shif t technical advisors) by 10/1/81. These individuals possessed the required knowledge and would be available to shift personnel for consultation.
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.E.1.2 Applicability PWR NUREG-0737 Schedule 7/1/81 Requirement Auxiliary feedwater initiation and flow indicator Implementation Status Completed - nn acH an vaquired Remarks Implementation of this item was described in NSP letter dated December 30, 1980.
Completion of required modifications to satisfy related item II.E.1.1 is scheduled for the next refueling outage of each unit. These modifications are described in the Connission's Safety Evaluation report dated March 22, 1982.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule u
Description of Compensatory Measures Being Taken in the Interim 1
i
( _. -.
~
- PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BEIWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.E.4.2(5)
Applicability All NUREG-0737 Schedule 7/1/81 Requirement Part 5 - lower containment pressure setpoint to level compatible with normal operation Implementation Status Completed - no action required Remarks Existing setpoint was found adequate. Refer to NSP letters dated December 19, 1980, December 30, 1980, and August 26, 1981.
NRC review of this issue is contained in a letter dated December 2, 1981.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Beine Taken in the Interim.
~
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 -
NUREG-0737 Item No.
II.E.4.2(7)
All Applicability NUREG-0737 Schedule 7/1/81 Requirement Part 7 - isolate purge and vent valves on radiation signal Implementation Status Completed - no action required Remarks A high radiation level in the containment or ventilation system ducting is used as a diverse parameter for automatic containment ventilation isolation. This feature was included in the original plant design.
Refer to Enclosure (1) of our letter dated November 20, 1979.
1 i
Justification for Proposed Schedule i
Demonstration of Need for Proposed Schedule i
i Description of Compensatory Measures Beine Taken in the Interim l
i _ - - -
~
PRAIRIE IS1AND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F.1(1)
Applicability All NUREG-0737 Schedule 1/1/82 Requirement Install noble gas effluent monitors l
Implementation Status Schedule relief requested Remarks 1
High range noble gas monitors have been installed on Unit 1 and Unit 2 shield building ventilation stacks. A description is contained in NSP letter dated December 30, 1980.
Completion of the steam relief monitors is now scheduled for April 30, 1982. Schedule relief was requested in our letters dated December 31, 1981 and Nhrch 1, 1982.
Justification for Proposed Schedule Flow sensor and amplifier problems have developed and spare parts have been difficult to obtain.
Computer problems have also been experienced.
1 Demonstration of Need for Proposed Schedule l
Due to the unavailability of parts and unforeseen installation problems an additional four months are needed to fully implement this design change.
[
Description of Compensatory Measures Beine Taken in the Interim Interim procedures have been written for determining the amount of activity being released in an accident situation.
This is accomplished with portable survey meters which view the steam line from a shielded collimator. -
l-PRAIRIE ISLAND NUCLEAR GENERATING PIANT l
STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE i
WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F.1(2)
Applicability All f
NUREG-0737 Schedule 1/1/82 Requirement Provide capability for effluent monitoring of iodine.
Implementation Status Completed 9/30/81 Remarks This requirement has been implemented. Refer to NSP letter dated December 30, 1980 for a description of the sampling and analysis system.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Beine Taken in the Interim PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F.1(3)
Applicability All NUREG-0737 Schedule 1/1/82 Requirement Install in-containment radiation i
level monitors l
Implementation Status Completed 2/28/82 Remarks This modification was described in NSP letter dated December 30, 1980.
Schedule relief until March 1, 1982 was requested in our letter dated December 31, 1982.
Justification for Proposed Schedule 4
4 Delivery of environmentally qualified cable lias been a problem.
Coax cable originally purchased did not pass qualification tests.
Delivery of qualified cable required an additional two months.
Demonstration of Need for Proposed Schedule Delivery of qualified cable required an additional two months beyond the NUREG-0737 implementation date.
Description of Compensatory Measures Being Taken in the Interim 4
The installation is now complete.
4 l,
_,.,_.,,,yn,.
~
~
PRAIRIE ISIAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BENEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F.1(4)
Applicability All NUREG-0737 Schedule 1/1/82 Requirement Provide continuous indication of containment pressure Implementation Status Completed 1/15/82 Remarks This modification was described in NSP letter dated December 31, 1981.
Schedule relief until February 1, 1982 was requested in separate correspondence dated December 31, 1981.
Justification for Proposed Schedule The modification was completed on schedule in both units with the exception of control board wiring and installation of qualified recorders. Recorders could not be delivered and wired in time to meet the NUREG-0737 implementation date.
Demonstration of Need for Proposed Schedule An additionel thirty days were necessary following receipt of the recorders to complete this work.
i Description of Compensatory Measures Beine Taken in the Interim The installation is now complete.
l l
l._
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F. l(5)
Applicability All i
NUREG-0737 Schedule 1/1/82 Requirement Provide continuous indication of containment water level Implementation Status Completed 12/30/81 Remarks This modification was described in NSP letter dated December 31, 1981.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Being Taken in the Interim _ _ _ _.
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.F.1(6)
Applicability All NUREG-0737 Schedule 1/1/82 Requirement Provide continuous indication of hydronen corcentration in containment Implementation Status ce=nnieted 12/30/81 Remarks This modification was described in our letter deted December 31, 1981.
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule
{
Description of Compensatory Measures Beine Taken in the Interim...-
. PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BEIVEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.K.2.10 Applicability B&W NUREG-0737 Schedule 7/1/dl Requirement Install anticipatory reactor trips Implementation Status Not Applicable Remarks Justification for Proposed Schedule i
Demonstration of Need for Proposed Schedule l
l Description of Compensatory Measures Beinst Taken in the Interim
(. _ _,, _ -.
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCll 1,1982 NUREG-0737 Item No.
II.K.3.15 Applicability NR NUREG-0737 Schedule 7/1/81 Requirement Modify pipe break detection logic to prevent inadvertent isolation Implementation Status.
Not Applicable Remarks Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Beinst Taken in the Interim l
~
- PRAIRIE ISIAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BEIWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.K.3.19 Applicability WR (non iet pump)
NUREG-0737 Schedule 7/1/81 Requirement Install interlocks on recirculation pump loops Implementation Status Not Applicable Remarks Justification for Proposed Schedule Demonstiation of Need for Preposed Schedule Description of Compensatory Measures Being Taken in the Interim I
l i
. ~,
~~
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.K.3.22 M
Applicability NUREG-0737 Schedule 1/1/82 Requirement Modify design of RCIC suction to provide automatic transfer to torus Implementation Status Not Applicable Remarks Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Beine Taken in the Interim.
' ~
PRAIRIE ISLAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BETWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.K.3.24 Applicability WR NUREG-0737 Schedule 1/1/82 Requirement Confinn the adequacy of space cooling for HPCI and RCIC Implementation Status Not Applicable Remarks Justification for Proposed Schedule Demonstration of Need for Proposed Schedule Description of Compensatory Measures Beine Taken in the Interim -
PRAIRIE ISIAND NUCLEAR GENERATING PIANT STATUS OF NUREG-0737 ITEMS REQUIRING LICENSEE RESPONSE WITH IMPLEMENTATION DATES BEIWEEN JULY 1,1981 AND MARCH 1,1982 NUREG-0737 Item No.
II.K.3.27 Applicability NR NUREG-0737 Schedule 7/1/81 Requirement Provide common reference level for vessel level instrumentation Implementation Status Not Applicable Remarks i
Justification for Proposed Schedule Demonstration of Need for Proposed Schedule l
Description of Compensatory Measures Beine Taken in the Interim i
. l
-,.