ML20054D994

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/82-09 & 50-364/82-08 on 820216-0315.No Noncompliance Noted
ML20054D994
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/25/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
DUKE POWER CO.
Shared Package
ML20054D995 List:
References
NUDOCS 8204230576
Download: ML20054D994 (2)


See also: IR 05000348/1982009

Text

)

'ljllW

  • ,

MAR 2 51982

to

A

%

ECeryEO

&

Alabama Power Company

9

Apg g N2h- O

ATTN: Mr. R. P. Mcdonald

-

-

Vice President-Nuclear Generation

{.

s

P. O. Box 2641

Birmingham, AL 35291

%

ss

Gentlemen:

%

Subject: Report Hos.CEd-348/82-691and 50-364/82-08

This refers to the routine inspection conducted by Mr. W. H. Bradford of this

office on February 16 - March 15,1982, of activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our

findings held with Mr. W. G. Hairston, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2,

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-348/82-09

and 50-364/82-08

l

cc w/ encl:

W. O. Whitt, Executive Vice President

820423o 576

s, o

.

. .

- -

.

--

-.

.

.

.

. .

.

MAR 2 51961

'

Alabama Power Company

2

.

1

I

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

. 0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

i

.and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

l'

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

'

State of Alabama

l

1

4

l

1

i

I

!

.

!

i

,.

.

!

RII

RI

RIL.

R

WBradford:dt

JRogge

VBrpnlee

FJ qpg

3/f/82

3/ /82

3/)\\/82

3//4/82

7

, - _.

- _ _ . . ,

. . . .

. .

.

-

.

.

--

.

..

..