APPENDIX A NOTICE OF VIOLATION Virginia Electric & Power Company Docket No. 50-281 Surry 2 License No. DPR-37 Ac a result of the inspection conducted on December 14, 1981 - January 22, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified.
Criterion XVI of Appendix B to 10 CFR 50, and Section 16 of the VEPC0 NPS QA Manual, " Corrective Action", establish measures to assure that conditions adverse to quality, such as failures, deficiencies, deviations, defective material and equipment, are promptly identified, and corrected.
TS 4.4.C require that the leakage rate of all penetrations and valves subject to Type B & C tests shall be less than 0.6 of the maximum allowable containment leakage.
Electrical containment penetration A-18 is subject to Type B leakage tests.
Contrary tE the above, prompt corrective action was not taken when Unit 2 electrical containment penetration A-18 was found leaking in excess of its acceptance criteria during the performance of Periodic Test 34, " Electrical Penetration Leakage Test", on October 15, 1981.
The identified leakage was not determined to be within the permissible maximum allowable leakage.
Subsequently, a containment intergrated leak rate test performed on December 15, 1981, failed due to excessive leakage through the A-18 pene tra tion.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Date:
O D' g 2 0 4 '2 3