UNITED STATES
.
8
%
NUCLEAR REGULATORY COMMISSION
$
E
REGION 11
o,
[
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 303o3
s
MAR 0 4 1992
Virginia Electric and Power Company
ATTri:
Mr. R. H. Leasburg, Vice President
fluclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
Subject:
Report tios. (0:28(T/82!01,and 50-281/82-01
This refers to the routine safety inspection conducted by ifr. D. J. Burke of this
office on December 14, 1981 - January 22, 1982, of activities authorized by fiRC
Operating License tios. DPR-32 and DPR-37 for the Surry facility.
Our preliminary
findings were discussed with Mr. J. L. Wilson, Station flanager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate liRC requirements.
This item and references to pertinent
requirements are listed in the tiotice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the fiRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
c -
~%\\
!
% ~3
%/
F. J. Long, Acting Chief
l
Projects Branch 2, Division of
Enclosure:
See page 2
Project and Resident Programs
l
p0423D N
.- .
-
-
._.
s
.
,
.
Virginia Electric & Power Company
2
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/82-01
and 50-281/82-01
,
'
' cc w/ encl:
J. H. Ferguson, Executive
Vice President-Power
1
J. L. Wilson, Station Manager
P. G. Godwin, Director, Nuclear Security
- .