ML20054D844

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-438/82-07 & 50-439/82-07 on 820309-12.No Noncompliance Noted
ML20054D844
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/31/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20054D845 List:
References
NUDOCS 8204230440
Download: ML20054D844 (2)


See also: IR 05000438/1982007

Text

/.

.

.

{

MAR 31 1982

,

e

N

S

%

Tennessee Valley Authority

ATTN:

Mr. H. G. Parris

&

RECEfMD

-9

Manager of Power

APR221993 L

-

  1. seame nsaum g,@

500A Chestnut Street Tower II

g.

Chattanooga, TN 37401

ammer,

g

Gentlemen:

4

'/

Subject:

Report No.6438/82'07)nd 50-439/82-07

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of

this office on March 9-12, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility and to the dis-

cussion of our findings held with Mr. W. R. Dahnke, Project Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information con uined therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

.#

'

Division of Project and

Resident Programs

l

Enclosure:

i

Inspection Report Nos. 50-438/82-07

and 50-439/82-07

cc w/ encl:

See Page 2

82 04 2 3 b y4 0

A

ZEo6(

.

.

.

o

Tennessee Valley Authority

2

,

cc w/ enc 1:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Ergineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nur'.aar Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management P. ranch

State of Alabama

l

RII ,,

RI

g

RII

R

RII

,,

'

T0dibbons:ht

TEConlon

ARHerdt

RiCrienjak

FSCantrell

3/fl/82

3/ /82

3/3 /82

33p'82

3/J6 /82

j