MAR 31 1982
,
e
N
S
%
Tennessee Valley Authority
ATTN:
Mr. H. G. Parris
&
RECEfMD
-9
Manager of Power
APR221993 L
-
- seame nsaum g,@
500A Chestnut Street Tower II
g.
Chattanooga, TN 37401
ammer,
g
Gentlemen:
4
'/
Subject:
Report No.6438/82'07)nd 50-439/82-07
This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of
this office on March 9-12, 1982, of activities authorized by NRC Construction
Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility and to the dis-
cussion of our findings held with Mr. W. R. Dahnke, Project Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information con uined therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. S. Cantrell, Acting Chief
Reactor Projects Branch 1
.#
'
Division of Project and
Resident Programs
l
Enclosure:
i
Inspection Report Nos. 50-438/82-07
and 50-439/82-07
cc w/ encl:
See Page 2
82 04 2 3 b y4 0
A
ZEo6(
.
.
.
o
Tennessee Valley Authority
2
,
cc w/ enc 1:
H. J. Green, Director of Nuclear Power
A. M. Qualls, Plant Superintendent
W. R. Dahnke, Project Manager
D. L. Terrill, Project Ergineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief, Nur'.aar Safety
Review Staff
bcc w/ encl:
NRC Resident Inspector
Document Management P. ranch
State of Alabama
l
RII ,,
RI
g
RII
R
RII
,,
'
T0dibbons:ht
TEConlon
ARHerdt
RiCrienjak
FSCantrell
3/fl/82
3/ /82
3/3 /82
33p'82
3/J6 /82
j