m-
'
'
,(g 44 h{
NUCLEAR REGULAIORY COMMISSION
YELLOW
9
UNITED STATES
.
g.
REGION ll
5
- [E
101 MARIE TT A ST., N.W., SUIT E 3100
$
AT LANT A, GEORGI A 30303
T ..... /
DEC 11 1881
Docket No. 50-335
Florida Power and Light Company
Attn:
R. E. Uhrig, Vice President
Advanced Systems and Technology
P. O. Box 529100-
Miami, Florida
33152
,
Gentlemen:
SUBJECT: EMERGENCY PREPAREDNESS APPRAISAL
To verify that licensees have attained an adequate state of onsite emergency
preparedness, the Office of Inspection and Enforcement is conducting special
appraisals at each power reactor site. These appraisals are being performed in
~
lieu of certain routine inspections normally conducted in the area of emergency
preparedness .
The objectives of the appraisal at each facility are to evalcate
the overall adequacy and effectiveness of energency preparedness and to identify
areas of weakness that need to be strengthened. We will use the findings from
these appraisals as a basis not only for requesting individual applicant and
licensee action to correct deficiencies and effect improvements, but also for
effecting improvenents in NRC requirements and guidance.
During the period of June 8-19, 1981, the NRC conducted an appraisal of the
energency preparedness program at the St. Lucie Nuclear Stati n
Are3Wamined
during this appraisal are described in the enclosed repor
50-335/81-13)
Within these areas, the appraisal team reviewed selected procedures and represen-
tative records, inspected emergency facilities and equipment, observed work
practices, and interviewed personnel .
Emergency preparedness deficiencies identified during this appraisal, for which
you have made acceptable commitments to resolve, were documented in our confirma-
tory letter (Appendix A) dated June 30, 1981.
Discussions with your staff on
hovember 9,1981 indicated that the conunitments have been completed on schedule.
Further review of the findings of this emergency preparedness appraisal indicate
that certain other deficiencies also exist in your emergency preparedness program.
These are discussed in Appendix B, " Emergency Preparedness Deficiencies."
With regard to deficiency 1 of Appendix B, the NRC is in receipt of your proposal
of November 24, 1981, relative to tinely augmentation of emergency response person-
nel. This matter is being reviewed by the NRC Office of Nuclear Reactor Regulation
in connection with the St. Lucie 2 operating license proceeding and will be the
subject of separate correspondence from that office.
8204280 T6L
-
'
,
'
.
'
2
DEC 11 M
Florida Power and Light Company
With respect to i.he deficiencies 2 and 3 identified in Appendix B, and in
reference
to
a
telephone
conversation
on
December 8,
1981,
between
Mr. J. W. Williams, Jr. of your staff and Mr. R. C. Lewis of this office,
,
it is our understanding that the corrective actions for deficiencies 2 and 3
'
will be completed no later than February 1,1982.
You are requested to inform this office upon the actual completion of each of
these deficiencies.
If the above dates are not met, you are reminded that
enforcement action will be considered.
In addition, the findings of this appraisal ir " ate that there are other areas
that should be evaluated and considered for improvement in your emergency
preparedness program.
These areas are summarized in Appendix C, " Preparedness
Improvement Areas."
In conjunction with the aforementioned appraisal, emergency plans for your
facility (including Rev. 9, September 1,1981) were reviewed by the Emergency
Preparedness Licensing Branch (EPLB).
The results of this review, discussed in
the attachment to the enclosed report, indicate that certain deficiencies exist
in your emergency plan.
As further indicated in the attachment to the enclosed
report you have committed to submit a revised emergency plan by January 15, 1982.
Copies of these changes are to - be submitted in accordance with the procedure
delineated in Section 50.54(q) Part 50 Title 10, Code of Federal Regulations.
You will be contacted by EPLB to discuss any further changes to the plan that
may be required.
Your corrective actions are to be incorporated into the Site
Emergency Plan and Procedures as appropriate.
The plan changes for correcting
each deficiency are to De provided to this office and EPLB upon issuance or, at
the latest, within 120 days of the date of this letter.
We recognize that an explicit regulatcry requirement pertaining to each item
identified in Appendices B and C may not currently exist.
Notwithstanding this,
you are requested to submit a written statement within thirty (30) days of the
date of this letter, describing your planned actions for correcting each of the
items identified in Appendix B and the results of your considerations of each of
the items in Appendix C.
This description is to include, (1)
steps which have
been taken, (2)
steps which will be taken, and (3)
a schedule for completion of
actions for each item.
This request is made pursuant to Section
50.54(f) of
'
Part 50, Title 10, Code of Federal Regulations.
,
You are also requested to report to the Region II office, in writing, when all
corrective actions identified in the Appendices B and C have been completed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
<
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submi: written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of fianagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
__
_
'
- - -
DEC 111981
Florida Power and Light Company
3
Should you have any questions concerning this appraisal, we will be pleased to
discuss them with you.
Sincerely,
gf. &
'
James P. O'Reilly
egional Administrator
Enclosures:
1.
Appendix A, Confirmation of Action Letter,
June 30,1981
2.
Appendix B, Emergency Preparedness Deficiencies
'3.
Appendix C, Preparedness Improvement Areas
4.
Office of Inspection and Enforcement
Inspection Report No. 50-335/81-13)
cc w/ encl:
C. M. Wethy, Plant Manager
Nat Weems, QA Construction
Manager
,
bec w/ encl:
Senior Resident Inspector
Document Management B:anch
'
State of Florida
Division of Emergency Preparedness, IE:HQ
,.
,
.s
1
-
l