Forwards IE Insp Repts 50-348/82-04 & 50-364/82-03 on 820208-12 & Notice of Violation
ML20054D799
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/04/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20054D789 List:
References
NUDOCS 8204230394
Download: ML20054D799 (2)


See also: IR 05000348/1982004

Text

.--

.

YELLOW

.

,

.

..

,

4

MAR - 41982

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

Subject: Report Nos. 50-348/82-04 and 50-364/82-03

This refers to the routine inspection conducted by Mr. C. D. Evans of this office

on February 8-12, 1982, of activities authorized by NRC License Nos. NPF-2 and

NPF-8 for the Farley facility. Our preliminary findings were discussed with

Mr. W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector. The Region II Mobile Laboratory

was also brought to your site and used by the inspector to make certain

independent measurements. The basic purpose of these independent measurements is

to verify your capability for analyzing radioactive effluents, and to achieve and

maintain comparable methods of analyses between your facility and the NRC. The

complete data from these neasurements will be reported in a subsequent Inspection

Report.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

,

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of lianagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

82042so3 W

.-

.

. _ _

'

-

.

.

,

Alabana Power Company

2

MAR - 41982

Should you have any questions concerning this letter, we will be glad to discuss

-

them with you.

Sincerely,

4/

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Inspection Report Nos. 50-348/82-04

50-364/82-03

2.

Appendix A, Notice of Violation

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, General Manager-Nuclear Generation

0. D. Kingsley, Jr., fianager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

RII

RII

RII

RII lY

k

k

k<

JFR gge

'-

[gCDEvans:ejw kDt1 Montgomery

JPStbhr

F Lo 9

2/2 /82

//J/82

,2/Q/82

,2/ /82

,21 /82

$

'

3

3

.

.