See also: IR 05000348/1982004
Text
.--
.
YELLOW
.
,
.
..
,
4
MAR - 41982
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject: Report Nos. 50-348/82-04 and 50-364/82-03
This refers to the routine inspection conducted by Mr. C. D. Evans of this office
on February 8-12, 1982, of activities authorized by NRC License Nos. NPF-2 and
NPF-8 for the Farley facility. Our preliminary findings were discussed with
Mr. W. G. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector. The Region II Mobile Laboratory
was also brought to your site and used by the inspector to make certain
independent measurements. The basic purpose of these independent measurements is
to verify your capability for analyzing radioactive effluents, and to achieve and
maintain comparable methods of analyses between your facility and the NRC. The
complete data from these neasurements will be reported in a subsequent Inspection
Report.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
,
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of lianagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
82042so3 W
.-
.
. _ _
'
-
.
.
,
Alabana Power Company
2
MAR - 41982
Should you have any questions concerning this letter, we will be glad to discuss
-
them with you.
Sincerely,
4/
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Inspection Report Nos. 50-348/82-04
50-364/82-03
2.
Appendix A, Notice of Violation
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr., fianager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Alabama
RII
RII
RII
RII lY
k
k
k<
JFR gge
'-
[gCDEvans:ejw kDt1 Montgomery
JPStbhr
F Lo 9
2/2 /82
//J/82
,2/Q/82
,2/ /82
,21 /82
$
'
3
3
.
.