Forwards IE Enforcement Conference Rept 50-409/82-03 on 820211.No Noncompliance Noted
ML20054D092
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/08/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20054D093 List:
References
NUDOCS 8204220332
Download: ML20054D092 (2)


See also: IR 05000409/1982003

Text

~

.

'APR 8

1982

m>

q

9

V.9)

\\

Docket No. 50-409(DPRP)

4

.p@dy ,B

$p' 1 bv,[ ~1

Dairyland Power Cooperative

]

o

Y'g* , d

A'ITN :

Mr. F. W. Linder

c-

oV

~

[

$

General Manager

2615 East Avenue - South

47

N

La Crosse, WI 54601

N

(/

'G3 \\&

Gentlemen:

This refers to the enforcement conference conducted on February 11, 1982,

in our Glen Ellyn, Illinois office which was attended by Mr. J. Taylor

and other members of your staff and me and members of my staff. The

purpose of the enforcement conference was to discuss the March 16,1981,

event involving operation on the main steam bypass valve at power and

the December 23-24, 1981, event involving loss of offsite power and

unintentional cooldown of a recirculation loop.

The enclosed report of the enforcement conference summarizes our under-

standing of the items discussed.

-

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed enforcement conference report will be

placed in the NRC's Public Document Room.

If this report contains any

information that you (or your contractors) believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify

this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b)

reasons which are the bases for the claim that the information should

be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods

noted above, a copy of this letter and the enclosed enforcement confer-

ence report will be placed in the Public Document Room.

B204220332 9g9499

f

DR ADOCK 05000409

y5

!

PDR

,

-

L

. . _ _

,

Dairyland Power Cooperative

2

April 8, 1982

We will gladly discuss any questions you have concerning this enforcement

conference.

Sincerely,

'

.

Orfgtnaf signed by

'

James G. Keppler

James G. Keppler

'

Regional Administrator

Enclosure: Enforcement

Conference Report

50-409/82-03(DPRP)

cc w/ enc 1:

4

R. E. Shimshak, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief