ML20054D004
| ML20054D004 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/08/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20054D005 | List: |
| References | |
| NUDOCS 8204220232 | |
| Download: ML20054D004 (2) | |
See also: IR 05000373/1982014
Text
_ _ _ _ _ - _ _ _ _ _ _
_ _ .
_
.
_
,.
.O
1
OPR
$id
>
e
\\
/[
<
,'o
Jis
&
Docket No. 50-373(DETP)
,gh ,
g
,
y,
\\
<y
Commonwealth Edison Company
dsy,
-~
y
NITN:
Mr. Cordell Reed
g
h'
'
J
>
Vice President
1
Post Office Box 767
V
4
Chicago, IL 60690
to
g
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R. Lanksbury, I. Jackiw, S. Roessler, and R. Anderson of this office on
March 16-19 and 22-26, 1982, of activities at LaSalle Count y Station,
Unit 1, authorized by NRC Construction Permit No. CPPR-99 and to the
discussion of our findings with Messrs. B. Stephenson and R. Holyoak at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of thin inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
11shed.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
[,
8204220232 820408
/
PDR ADOCK 05000373
-
G
._
_____-_-_
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
(
.
.
APR
8 1992
Commonwealth Edison Company
2
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
I6l w w W.;) $ tit / d
'
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-373/82-14(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
RUI
R I'[)
R I
)p1.
Qf
S &((
$
La
ufy/so
5atkiw
Walker
Li
j'
relius
4/1/82
y. Ipf
Avr
,