ML20054C989

From kanterella
Jump to navigation Jump to search
Ack Receipt of Advising of Full Compliance W/ Requirements of 10CFR50.54(s)(2) & Section IV.D.3 of App E to 10CFR50.No Further Action Will Be Taken Re 820212 Notice of Violation
ML20054C989
Person / Time
Site: Pilgrim
Issue date: 03/24/1982
From: Lieberman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harrington W
BOSTON EDISON CO.
References
EA-82-030, EA-82-30, NUDOCS 8204220217
Download: ML20054C989 (2)


Text

(

d s ~.

LPDR MAR 2 41982 c

p,R (D

gwusen Docket tio. 50-293 EA 82-30 Boston Edison Company 9'

RECElVED Attn: Mr. William D. Harrington ppp g h""m*aa*w"*I902h=-

Senior Vice President, Nuclear "Y" Tp 800 Boylston Street Boston, Massachusetts 02199 4

Gentlemen:

g This is in reference to Mr. Howard's letter of February 26, 1982, advising us that as of that date, you have achieved full compliance with the requirements of 10 CFR 50.54(s)(2) and of Section IV. D.3 of Appendix E to 10 CFR 50.

In view of that information and subject to future inspection, we propose no further action with respect to the Notice of Violation issued to you on February 12, 1982.

Sincerely, James Liebeman, Acting Director of Enforcement Office of Inspection and Enforcement

tgV ES
I :

SE vf" EP:IE JHenderson/jh JL1 beman 9

BGrimes 03/ti/82 03/pj/82 03/p /82 03//f,/82 8204220217 820324 PDR ADOCK 05000293 G-PDR

n.

MAR 2 41982 Boston Edison Company Distribution PDR LPDR NSIC ACRS SECY CA RCDeYoung, IE JSniezek, IE JLieberman, IE VStello, DED/ROGR RHaynes, RI HDenton, NRR JJCummings, OIA JPMurray, ELD FIngram, PA BGrimes, IE LCobb, IE JTaylor, IE EJordan, IE JCrooks, AE0D JHenderson, IE Resident Inspector, Pilgrim I Director, ES, RI, RII, RIII, RIV, RV George Smith, RI Central Files E00 Rdg File ES Files EA File Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health Room 770, 600 Washington Street Boston, MA 02111