ML20054B864

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1982
ML20054B864
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20054B860 List:
References
NUDOCS 8204190264
Download: ML20054B864 (17)


Text

.

OPERATING DATA REPORT DOCKET NO. 50-269 DATE 4-15-82 CONIPLETED BY J. A. Reavis TELEPHONE 7n!_.171-R552 OPERATING STATUS Oconee #1 .No tes

1. Unit Name:
2. Reporting Period: March 1, 1982-March 31, 1982 Year-tO-date and CuHunulatiVe 2568 capacity factors are calcu-
3. Licensed Thermal Power QtWt): lated using a weighted
4. Nameplate Rating (Gross St%es: 934 g
5. Design Electrical Rating INet StWe): 886 dependable capacity.
6. Staximum Dependable Capacity (Gross StWe): 899
7. 31aximum Dependable Capacity (Net 5tWe): 860
3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

(

9. Power Level To Which Restricted. If Any (Net StWe): None
10. Reasons For Restrictions. If Any:

Ris 31onth Yr..to.Date Cumulative

11. Hours !n Reporting Period 744,0 2 160.0 76 345.0
12. Number Of Hours Reactor Was Critical 381.1 830.7 51 886.1
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line 308.6 644.1 48 887.3 l
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 734 229 1 363 480 114 821 252 17 Gross Electrical Energy Generated (SIWH) 264 800 , , ,

469 620 39 945 970

18. Net Electrical Energy Generated (5tWH) 246 692 417 925 37 762 101
19. Urur Service Factor 41.5 29.8 64.0
20. Urut Availability Factor 41.5 29,8 64.1
21. Unit Capacity Factor iUsing .\lDC Nett 38.6 22.5 57.3
22. Umt Capacity Factor IUsing DER Net) 37.4 21.8 55.8
23. Unit Forced Outage Rate 58.5 70.2 20.0
24. Shutdowns Scheduled Over Next o .\tonths iType. Date,and Duration of Each r None l

l 25. If Shut Down At End Of Report Penod. Estimated Date of Ltartup:

26. Units in Test Status IPnor to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COststERCIAL OPER A TION 8204190264 820415 PDR ADOCK 05000269 R PDR g.

DOCK ET NO. 50-269 UNIT SiluTDOWNS AND POWER REDUCTIONS UNil NA%IE Oconee 1 DATE 4-15-82 CO\lPLETED fly J. A. Reavis RI: PORT MONTil March, 1982 TELEPl!ONE 704-373-8552

= r. Si 3 - 4

.5*L

, .2 _e  : , 5 ~4 Licensee c -r, r C.iuse & Corrective No. D.n e g 3g j is5 Event aT $1 Action to

$5 $ j5g Report e NL~ y' -

Prevent Reentrence 6

3-p 82-03-04 F --

A --

HA TURBIN Power was reduced per tech. spec. due tc a turbine control (EHC) oil leak. The leak was repaired and the unit returned to near rated power.

10 82-03-06 F 432.25 A 1 CB HTEXCH 1B steam generator tube leak repair.

11 82-03-24 F 3.15 A 3 CB INSTRU. Reactor tripped on high reactor

, coolant system pressure due to a feedwater control problem causing a swing in flow.

i i

1 2 3 4 F: Foiced Reason: Method: Exhibit G-Instructions S: Stheduled A Equipment Failure (Lxplain) 1-Manual for Picparation of Data II. Maintenance or Test 2-Manual Scram. linery Sheeis for Licensee C. Refueling 1-Automatic Scram. Event Repor (I.ER) File INUREG.

i D Regulatory Restriction 4-Other ( Explain ) 0101)

I: Ope.ator Training & Liecuse Examination F.Admimst rative 5 .

G Opaational Error (lisplain) Exhibit I . Same Source

] (9/77) Il Other (Explain)

y , .

7 __

AVER.\GE D A1).Y L* NIT POWER LEVEL OCC KET .No. 50-269 (3IT Oconec #1 0 4TE 4-15-82 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 March, 1982 310NT11 DAY AVERAGE DAILY POWER LEVEL oAY AVER Ab.. r. D ALLY ?OSER LEVEL g ,q w , 3,, , t .\lb e.Ne t 3 863 g

I7 -

865 13 3 9AA y9 4 664 ,0

g. 863 -

21

. 496 -

22 U

24

~

9 25 702 860 10 5 11

.. 862

, 857 12 .3 855 12 .9

. 859 14 30 15 ji 865 Io

!NSTRL'CTIC.NS C n t?.:s fe r: st . list he c.er:ge ni!y . .,ig

.. .;w e. ,, ,, ;, .,p,y, .3,,

, ,, m,n ,,,, , ,,,, "

- - _ cl_a ,. ?.:.ie ,

": nearest Aneie .-.e;2w::-

o-3

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 1 .

i 2 ., Scheduled next refueling shutdown: March, 1983 .

3. Scheduled restart following refueling: May, 1983 ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be?

i Technical Specification Revision I

If no, has reload design and core configuration been reviewed by Safety l" Review Committee regarding unreviewed safety questions? N/A -

If no, when is review scheduled? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: Submitted February, 1983 ,
6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1 i

7. Number of fuel assemblies (a) in the core: 177 ,

(b) in the spent fuel pool: 617* .

8. Present licensed fuel pool capacity
1312* -

Size of requested or planned increase: .

i

9. Projected date of last refueling which can be accommodated by present

! licensed capacity: .

DUKE POWER COMPANY Date: April 15, 1982 ,

Name of

Contact:

J. A. Reavis 4

  • Represents the total for the combined Units 1 & 2.
)

DOCKET NO: 50-269 UNIT: Oconee 3 5

DATE: April 15, 1982 Y

NARRATIVE

SUMMARY

Month: March, 1982 Oconee I began the month of March at near rated power.

On March 4 the reactor power was reduced due to an oil leak on the turbine

, control oil (EHC) system. The leak was brought under control and the unit was returned to near rated power.

An outage was required on March 6 to repair a tube leak in the "B" steam generator. The unit was returned to service on March 24 at 1705.

The reactor and generator tripped on March 24 at 1928 when a feedwater control problem resulted in a high reactor coolant system (RCS) pressure.

It was returned to service the same day and increased in power, reaching near rated power on March 25 and continued the remainder of the month, 2

4 i

f i

1 A

OPERATING DATA REPORT DOCKET NO. 50-270 DATE 4-15-82 CONIPLETED BY J. A. Reavis TELEPHONE 7m/1 17 %R552 OPERATING STATUS Oconee #2 Note 5

1. Urut Name:
2. Reporting Period: March 1, 1982-March 31, 1982 Year-to-date and cummulative capacity factors are calcu-
3. Licensed Thermaj Power (}lWt): 2568 lat d using a weighted
4. Nameplate Rating (Gross atWe s: 934 average for maximum
5. Design Electrical Rating INet StWe): 886 dependable capacity.
6. Sta.timum Dependable Capacity (Gross atWe). 899
7. Staximum Dependable Capacity (Net StWe): 860
3. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted if Any (Net klWe): None
10. Reasons For Restrictions,if Any:

This ktonth Yr. to.Date Cumulative

11. Hours in Reportmg Period 744.0 2 160.0 66 265.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 46 208.4
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0.0 0.0 45 228.4
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 0 0 106 034 812 17 Gross Electrical Energy Generated (5tWH) 0 , _ ,

0 36 076 786

18. Net Electrical Energy Generated (5tWH) -1 470 -5 609 34 227 239
19. Urut Service Factor 0.0 0.0 68.3
20. Unic Availability Factor 0.0 0.0 68.3
21. Unit Capacity Factor iUsing alDC Nett 0.0 0.0 59.8
22. Unit Capacity Factor (U>ing DER Net) 0.0 0.0 58.3
23. Unit Forced Outage Rate 0.0 0.0 17.6
24. Shutdowns Scheduled Over Next 6.\lonths IType. Date and Duration of Each t None Ap 24, M82
25. If Shut Down At End Of Report Period. Estimated Date of L:artup:
26. Units In Test Status (Pnor to Commercial Operations: Forecast Achieved INITIA L CRITIC.\ LITY INITIAL ELECTRICITY l COstStERCIA L OPER A TlON l

pu- ;

l

~

DOC K ET NO.

50-270 UNIT SilUTDOWNS AND POWER REDUCTIONS Oconee c, UNIT NAME j I) ATE 4-15-82 March' 1982 COMPLETED ilY J. A. Reavis Rl: PORT MONTil TELEPilONE (704)373-8552 w.

~,

-, SE 'E Ek Licensee E r,  !% c.iuse A Corrective N .. D.n e g 3g y jy Egent Iteport r p 53 (2 0 Q Action to

$5 553g 5'

L Prevent fleentrente C

lA 82-03-01 S 336.00 B CA VESSEL Core support assembly bolt replacement /

10 yr. ISI/NRC NSM's in progress.

1B 82-03-15 S 408.00 C RC FdELXX Scheduled refueling /10 yr. ISI/NRC NSM's in progress.

Other maintenance continues.

I 2 3 4 in Forced Reason: Method: Eshibit C-Instrinctams S Sched uled A.I tiuipment Failure (Expla:n)  ! -Man ual for Pieparation of Data ll Maintenance oi Test 2-Manual Scram. lintry Sheets for lxen>ee C-Refacting 1-Autumatic Scram. Event Report (LElt) Fife t NtillEG-0 Ilegulatory llest nietion 4-Ot her ( thplain) 0101)

I'-Ope.ator Training 1 Ucense Eumination F-Adminnt ra tive 5 ,

G Opeiational la ror (Esplain) Esinbit I -Same Souice P7/77) Il-Ot her ( E splain )

.WER.\GE D Al).Y L' NIT POWER LEVEL DCCKET SO. 50-270 t,3IT Oconee #2 0 4TE 4-15-82 e

CO\tPLETED BY J. A. Reavis TELEPHONE (704)373-8552 March, 1982 St0 NTH DAY AVERAGE DAILY POWER LEVEL DAY AVER. AGE DMLY ?OwER LEVEL 13the-Neri i3lwe.Necs

! 17

~

13 3 -

19 4 -

l0 S

==

7 ,3 24 9

S 10 -

I! _

l ~3 23 l-'

29 14 -

30 15 3; lo .

!NSTRL'CTIONS Cn t.".:s fer : st. list :..e r.er ge hily 2..it .;* e 't. e 3 ,i.sm . y m.3 ,

- * ' " ' ! ' ' # 8,'

'5:238 ' .

' .: nt2rtst .*nete . .e;2w: :

.4

  • g l

i l

MONTHLY REFUELING INFORMATION RE00EST

1. Facility name: oconee Unit 2 .
2. Scheduled next refueling shutdcwn: Unknown .
3. Scheduled restart following refueling: .
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes .

~

If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? --~

N/A ,

If no, when is review scheduled? N/A ,

5. Scheduled date(s) for submitting proposed licensing action and supporr.ing informa tion: Unknown ,
6. I=portant licensing considerations (new or dif ferent design or supplier, unreviewed design or performance analysis octhods, significant changes in design or new operating procedures).
7. Nu=ber of fuel assemblies (a) in the core: 177 ,

(b) in the spent fuel pool: 617* ,

d. Present licensed fuel pool capacity: 1312*

l ,

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

April 15, 1982 DUKI POWER CCMPANY Dr.c e : ,

N.ime of

Contact:

J. A. Reavis .

DOCKET NO: 50-270 UNIT: Oconee 2 DATE: April 15, 1982 NARRATIVE

SUMMARY

Month: March, 1982 Oconce 2 continues in an outage for refueling / core support assembly bolt replacement; which has been completed /10 yr. ISI/NRC required NSM's and other maintenance.

i

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 4-15-82 COhlPLETED BY J. A. Reavis TELEPHONE 7M 171-R552 OPERATING STATUS Oconee #3 Notes

1. Unit Name:
2. Reporting Period: March 1. 1982-March 31. 1982 Year-to-date and cummulative capacity factors are calcu-
3. Licensed Thermal Power QtWe): 2568 lated using a weighted
4. Nameplate Rating (Grou .\tWei: 934 average for maximum 5., Design Electrical Rating INet atWe): 886 dependable capacity.
6. Sta.timum Dependable Capacity (Gross 31We): 899

~. Staximum Dependable Capacity (Net StWe): 860

3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. !f Any (Net 5twel: None
10. Reasons For Restrictions. If Any:

This 31onth Yr.to.Date Cumulative i1. Hours in Reportmg Period 744.0 2 160.0 63 912.0

12. Number Of Hours Reactor Was Critical 45.1 1 153.4 46 467.3
13. Reactor Reserve Shutdown Hours - - -
14. Hours Generator On.Line 39.1 1 147.0 45 463.1
15. Unit Reserve Shutdown Hours - - -
16. Gross Thermal Energy Generated (AtWH) 74 750 2 909 972 110 428 711 17 Gross Electrical Energy Generated (31WH) 22 780 _,

1 004 560 38 151 374

18. .Ner Electncal Energy Generated (StWH) 15 478 955 750 36 307 226
19. Umt Service Factor 5.3 53.1 71.1
20. Umt Availability Factor 5.3 53.1 71.1
21. Umt Capacity Factor IUsing .\tDC Nett 2.4 51.5 65.8
22. Umt Capacity Factor IUsing DER Net) 2.4 49.9 64.1
23. Unit Forced Outage Rate 94.8 46.9 16.3
24. Shutdowns Scheduled Over Next o atonths tType. Date.and Duration of Each t:

Refueling /10 yr. inspection-June 6 14 weeks

25. If Shut Down At End Of Report Period. Estimated Date of L:artup:
26. Units in Test Status iPnor to Commercial Operation): Forecast Achieved INITIA L CRITICA LITY INITIAL ELECTRICITY COststERCIAL OPER ATION pu- ;

DOCKET NO. 50-287 UNIT SIIUTDOWNS AND POWEll REDUCTIONS UNil N,0!E Oconee 3 DATE 4-15-82 March, 1982 CO\1PLETED fly J. A. Reavis Iti:POR T MONTil TELEPl!ONE (704)373-8552

=_ ~3 u,5 k ri Es.censee E^ cause & Cor rective

"- Dde 3 - 3,e

?

73f 2 ;e twent

=%

ay c-g ,! Auion to

$5 $ jsg itepori = E0

]L '

Prevent Iteentrence 6

1 82-03-01 F 704.95 A SF PIPEXX 3A steam generator tube leak outage extended for maintenance to the high pressure injection (HPI) nozzles.

~

I 2 3 4 F: Forced Itcason: Method: Exhibit G -lostructmns S: Schednied A li uipment t Failure (Explain) 141anual for Preparation of Data ll Maintensnee or Test 241anual Scram. 1:ntry Sheets for l_icensee C-11efueling 3. Automatic Serain. Esent Iteport ( LER) File (Null!:G-D. Regulatory itestriction 4 Oiher (Explain) 01bl)

E. Ope.ator Training & License Examination F Adininistrative 5 .

G.Opeiational lii ror (lisplain) Eshibit I - S.une Somee (9/77) Il-Ot her ( E xplain)

AVERAGE D AiLY L* NIT ?OWER LEVEL DCCKET NO. 50-287 LNIT Oconee #3 0 4TE 4-15-82 C0%fPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310 NTH March, 1982 DAY AVERAGE dally POWER LEVEL DAY AVERAGE D ALLY ?OWER :.EVEL L3the. Net t e ,stw e.Nen 3 i .,

2 is J [9 4 -

20 5 -

21 6 22 7 -

23

~

3 24 9 25 10  :$

t il ;7

~

12 23 l'

9 t

I4 229 30 I$ 31 651 t

!NSTRL'CTIONS j Cn c.'.:s (crr 2t, hs :,3e 3. er ge sily.;,it .. e.

a

,,a ,.,;,,.

, ,, g ,' ,,

- ,,,2,-

"- ,,M . . , ; .; ; , . ,

'-:," q .. t.n

~~.
r*.estest 4 n ete .7,e ;;.,:g:

..i-,

MONTHLY REFUELING INFOIO!ATION RE00EST

1. Facility name: Oconce Unit 3 ,
2. Scheduled next refueling shutdown: June, 1982 .
3. Scheduled restart following refueling: September, 1982 .
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes ,

If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

1 If no, when is review scheduled? N/A .

1 l

S. Scheduled date(s) for submitting proposed licensing action and supporting

information
March, 1982
6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating precedures).
7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 303 ,

8. Present licensed fuel pool capacity: 500 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accoccodated by present licensed capacity:

DUF2 POWER COMPANY Date: April 15, 1982 .

Name of

Contact:

J. A. Reavis

DOCKET NO: 50-287 UNIT: Oconee 3 DATE: April 15, 1982 NARRATIVE

SUMMARY

Month: March, 1982 Oconee 3 began the month in an outage for 3A steam generator tube leak repair. The outage was extended for maintenance to the HPI nozzles which was completed and the unit returned to service on March 30. Power had been increased to 85% by the month's end.

A

l OCONEE NUCLEAR STATION l

Operating Status Report

1. Personnel Exposure For the month of February, 17 individual (s) exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 2.470 rem, which represents approximately 20.6% of that person's allowable annual limit.
2. The total station liquid release for February has been compared with the Technical Specifications annual value of 15 curies; the total release for February was less than 10 percent of this limit.

The total station gaseous release f or February has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for February was less than 10 percent of this limit.

1 i

1 l

I 1

. CORRECTED COPY OPERATING DATA REPORT DOCYlTNO. 50-269 DATE 3/ h COMPLETED BY J. A. Reavis TELEPHONE inA 171 A552 OPERATING STATUS Oconee #1 Notes

1. Unit Name:
2. Reporting Period: Februarv, 1982 Year-to-date and cummulative capacity factors are calcu-
3. Licensed Thermal Power (>tWr): 2568 lated using a weighted
4. Nsmeplate Rating (Gross StWep: 934 average for maximum 5.,Desi %n Electrical Rating iNec 31WeI: 886 dependable capacity.
6. Stsaimum Dependable Capacity (Gross StWen 890
7. Staximum Dependable Capacity (Nec StWe): 860

$. If Changes Occur in Capacity Racings iltems Number 3 Through 7) Since last Report. Give Ressons:

9. Power Level To which Restricted. !f Any (Net MWe):
10. Reasons For Restrictions. If Any:

His Month Yr..to.Dste Cumulative

11. Hours In Reportmg Penod 672.0 1 4'16.0 75 601.0
12. Number Of Hours Resctor Wss Criticsi 276.6 449.7 51 505.0
13. Res.: tor Reserve Shutdown Hours -
14. Hours Generstor On.Line 222.6 335.5 48 578.7

!5. Unit Reserve Shutdown Hours - - -

16. Gross Thermal Energy Genersted (MWH) 496 209 629 251 114 087 023 17 Gross Electrical Energy Generated (StWH) 165 060 _,

204 820 39 681 170 t 13. Net Electricsi Energy Genersted (StWH) 147 840 171 '11 17 51 ; ano 19 Umr Service Factor 33.1 23.7 64.3

20. Unic Availability Factor 33.1 23.7 64.3
21. Unit Capscity Factor iUsing stDC Nett 25.6 14.1 57.5
22. Unit Capacity Factor tU>ing DER Net) 24.8 11.7 56.n
23. Unic Forced Outage Rate 66.9 76.3 19.6
4. Shutdowns Seneuuled Over Next o .\tonths tType. Date and Durstion of Eschi:

None

25. If Shut Down At End Of Report Penod. Estimated Date'of ",:artup:
26. Units in Test Status 1Pnor to Commere:sl Operations: Forecast Achieseo INITIA L CRITICA LITY INITIA L ELECTRICITY C05151ERCIA L OPER A TION

- 1