Text
F
.
,
EPR O! e
'
Docket No. 50-293
m
g
Boston Edison Company M/C Nuclear
g
gs
ATTN:
Mr. William D. Harrington
ffEcggUU,
'
Senior Vice President, Nuclear
5"g4PR1570
-12
-
800 Boylston Street
~
Boston, Massachusetts
02199
Gentlemen:
5
Subject:
Inspection No. 50-293/82-11
&'
This refers to the routine safety inspection conducted by Dr. Jin W. Chung of
this office on February 25-28, 1982, at Pilgrim Nuclear Power Station, Unit 1,
Plymouth, Massachusetts of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Dr. Chung with Mr. W. Armstrong and
other members of your staff at the conclusion of the inspection, and to a
subsequent telephone discussion between our Dr. Chung and Mr. S. Wallman of your
staff on March 2, 1982.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix A.
The Item in the Notice of Violation enclosed with this letter was identified
during a previous inspection of ycur licensed activities on May 4-8, 1980, and
was documented in the enclosure to our letter dated June 4, 1980.
Your letter
to this office dated July 15, 1980 stated that procedure 8.7.1.4 would be revised
to provide more specific direction and to specify actions to be taken by the
test director upon discoveries of leakage.
From our February 25-28, 1982 inspec-
tion it appears that the stated corrective actions were not effective since this
item has recurred.
Recurrent and uncorrected items of noncompliance are given additional weight in
the consideration and selection of appropriate enforcement action.
Therefore,
in your response to this letter, you should give particular attention to those
actions taken or planned to ensure that identified items of noncompliance will
be completely corrpcted and will not recur.
(RI:DETP
RI:DETP
RI:DETP
RI:DPRP
Chung/pja
Bettenhausen
El
ser
v Ebneter
3/19/82
f*M
'
3i
l
- 5 6.auc
wgm
0FFI AL RECORD OPY
l
%!4
fMhb
0 I
I[h j
8204160361 820401
PDR ADOCK 05000293
G
.
F
.
.
Boston Edison Company M/C Nuclear
2
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written applica-
tion to withhold information contained therein within thirty days of the date of
this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at
(215) 337-5223.
The responses directed by this Notice are not subject to the clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
,bhwok
'b4/
orieinal st r >M 9:
tThomas T. Martin, Director
Division of Engineering and Technical
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-293/82-11
cc w/encis:
A. V. Morisi, Manager, Nuclear Operations Support
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
,
l
Commonwealth of Massachusetts (2)
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
T. C. Elsasser
0FFICIAL RECORD COPY
. .