MAR 2 31982
Mississippi Power and light Company
ATTH: Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson,ils 39205
Gentlemen:
Subject:
Report No. 50-416/82-18
This refers to the routine safety inspection conducted by Mr. A. G. Wagner of
this office on February 16 - March 10,1982, of activities authorized by MRC
Construction Permit No. CPPR-118 for the Grand Gulf facility. Our preliminary
findings were discussed with fir. C. K. ficCoy, Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found .that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
,
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
One new unresolved item is identified in the enclosed inspection report.
This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
,
j
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
i
cation to withhold information contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of flanagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
y
i
'
l
i
l
.
'
!
8206070841 820527
PDR ADOCK 05000416
G
l
l
, ._
__
_
_
_.
__
_ _ _ . .
.
<-
'.
~
.
Mississippi Power and Light Company
2
.,,4
Should you have any questions concerning this letter, we will be glad to discuss
them with you,
t
l
Sincerely,
I
M
q
F. S. Cantrell, Acting Chief
Reactor Project Branch 1
Division of Project and
Resident Programs
j
Enclosures:
!
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-416/82-18
cc w/ encl:
D. C. Gibbs, Vice President
'
111ddle South Energy, Inc.
C. K. ficCoy, Plant Manager
bcc w/ encl:
l
NRC Resident Inspector
Document fianagement Branch
State of liississippi
I
i
f
l
l
!
RII
RII
RII
RII
Idin
FSCantrell
fA
ner:dt
er
3/}/82
3/ /'t/82
3//1/82
3/1)/82
7