ML20053E370

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-369/82-09 on 820308-12 & Notice of Violation
ML20053E370
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/06/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20053E350 List:
References
NUDOCS 8206070837
Download: ML20053E370 (2)


See also: IR 05000369/1982009

Text

G

o

-

.

APR 0 6 1982

Duke Power Company

ATTN:

Mr. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject:

Report No. 50-369/82-09

This refers to the routine safety inspection conducted by Mr. P. T.

Burnett

of this office on March S-12, 1982, of activities authorized by NRC License

No. NPF-9 for the McGuire 1 facility.

Our preliminary findings were discussed

with Mr. M. D. McIntosh, Station Manager at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examiritions of procedures and representative records, interviews with

personnel, and caservations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosuces:

See Page 2

8206070837 020528

PDR ADOCK 05000369

G

PDR

.

.

.

'APR 0 6 1982

Duke Power Company

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report 50-369/82-09

cc w/ encl:

M. D. McIntosh, Plant Ma. ager

J. T. Moore, Project Manager

bcc w/ encl:

Document Management Branch

State of North Carolina

NRC Resident Inspector

RII

RII

RII

"'I

RII

R

WY

Y

A cf

PTBurnett:es

F

rdt

A01shinski

AJIg atonis

ewis

-f/ / /82

f/l/82

' . l /82

3

-3/ 182--

f/ff82

'

1/s/Fs