ML20053E355
| ML20053E355 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/14/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20053E356 | List: |
| References | |
| NUDOCS 8206070823 | |
| Download: ML20053E355 (2) | |
See also: IR 05000348/1982012
Text
_ _ _ _ _ _ _
_
_ _ _ _ _
. _ .
_
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
' '
OFFICIAL RECORD COPY
-
c
MAY l 41982
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject: Report No[
[85-}21hd 50-364/82-11
This refers to the routine safety inspection conducted by Mr. P. A. Taylor of
this office on April 22, 1982, of activities authorized by NRC Operating License
Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our
findings held with Mr. W. G. Hairston III, Plant Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.79C(a), a copy of this letter and the enclosure will
be placed in the NE 's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
R. C. Lewis, Director
Division of Project and
Resident Programs
Enclosure:
Inspection Report Nos. 50-348/82-12
and 50-364/82-11
l
cc w/ encl: (See Page 2)
l
8206070823 820514
PDR ADOCK 05000348
a
fgoj
-
o
.
Wir2(;q
.
.
Alabama Power Company
2
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General Manager-Nuclear Generation
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Safety Audit
and Engineering Review
W. G. Ware, Supervisor-Safety Audit
and Engineering Review
W. G. Hairston, III, .Dlant Manager
bec w/ encl:
NRC Residerit Inspector
Document Management Branch
State of Alabama
RIl
RII
RII
RIIf(
Wt~
P)i1I[
()v
PIaylor:ejw
GJenkins
JRogge
Ftong /2me
r
, //t/82
- ,A// t/S2
4/p /82
4
/82
( /2 C%