ML20053E010
| ML20053E010 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/15/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20053D990 | List: |
| References | |
| NUDOCS 8206070526 | |
| Download: ML20053E010 (2) | |
See also: IR 05000259/1982012
Text
-
_
,
. ' .
.
,
l6Il0LD
'
'
APR 151982
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
flanager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
59/82D,j -260/82-12 and 50-296/82-12
Subject:
Report No
50
This refers to the routine safety inspection conducted by Mr. R. F. Sullivan of
this office on February 26 to March 25, 1982, of activities authorized by NRC
Operating License Nos. DPR-33, DPR-52 and DPR-68 for the Browns Ferry facilitv-
Our preliminary findings are discussed with fir. G. T. Jones, Plant
Superintendent, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selN tive examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
During the inspection it was found that certain activities under your licente
appeared to deviate from commitments to the Commission and have safety signifi-
cance.
This item identified in the Notice of Deviation enclosed herewith as
Appendix B.
Please provide us in writing within 30 days of your receipt of this
letter your conuents including a description of corrective actions that have been
or will be taken, corrective actions which will be taken to avoid further
deviations, and the date your corrective actions were or will be completed.
We have examined actions you have taken with regard to previously reported
unresolved items.
Thc status of these items is discussed in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of lianagement and Budget as required by the
,
Paperwork Reduction Act of 1980, PL 96-511.
s206070526 820526
PDR ADOCK 05000259
Q
L
-
-
-
.
-
-
.
,
.
.
.
.
.
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
4
them with you.
i
Sincerely,
.
R. C. Lewis, Director
Division of Project and
Resident Programs
!
Enclosures:
1.
Appendix A, Notice of Violation
i
2.
Appendix B. Notice of Deviation
3.
Inspection Report Hos. 50-259/82-12,
,
50-260/82-12 and 50-296/82-12
,
cc w/encls:
H. J. Green, Director of Nuclear Power
,
G. T. Jones, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
.
Review Staff
bec w/encls:
NRC Resident Inspector
State of Alabama
Document Management Branch
,
f
I
II
RIT
R
({
-
f
ivan:ejw
JWChase
GPi
Ik
FCantrell
.
RC
is
-
'
4/p /82
4/to /82
4
/82
47//82
y/
.
3
-
w.. v.s.
c. A llet s * *
i
.
v
m
e--u--ur
a-
,m,
a
~ ~
~,-r
.- -
,-w,
m
--r,
,,
- , , - , - ,
m--
- , - , -
- - -
- - - -
m--
n---
--