ML20053D988
| ML20053D988 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/01/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML20053D975 | List: |
| References | |
| NUDOCS 8206070504 | |
| Download: ML20053D988 (2) | |
See also: IR 05000302/1982003
Text
.
_
_
.
-
V
h
G
O
APR - 11982
Florida Power Corporation
ATTN:
Mr. J. A. Hancock
Vice President Nuclear Operations
P. 0. Box 14042, Mail Stop C-4
St.' Petersburg, FL 33733
Gentlemen:
.
Subject: Report No. 50-302/82-03
This refers to the special safety inspection conducted by Mr. N. Economos of
this office on February 2-18, 1982, of activities authorized by NRC Operating
License No. DPR-72 for the Crystal River facility.
Our preliminary findings
were discussed with Mr. T. C. Lutkehaus, Nuclear Plant Manager, at the conclu-
sion of the inspection.
Areas examined during this inspection included makeup line thermal sleeve pipe
crack. Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observa-
-
tions by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent-
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this-letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appl 1-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject-to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
[
psMl8aN8887gg
G
-
_-
,-- - -,- -
.. . -. ,..
... -.. .
- -..,_-_. _.-
.
....-
-.-
._ -
Florida Power Corporation
2
Apg .1 1982
,-
i, )
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-302/82-03
cc w/ encl:
D. G. Mardis, Acting Manager
Nuclear Licensing
T. Lutkehaus, Nuclear Plant Manager
bcc w/ encl:
/~~x
NRC Resident Inspector
\\J
Document Management Branch
~
State of Florida
i
j
l
l
,
l
' RI
/
RI
RII
RII
l
-
h
r
p
l
N c n .. s:ht
AR rdt
JRogge
FJLong
l
3p/82
3/ g/82
3/ s/82
3/f//82
3
3
m
%./
!
t