ML20053D819
| ML20053D819 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/15/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20053D813 | List: |
| References | |
| NUDOCS 8206070352 | |
| Download: ML20053D819 (2) | |
See also: IR 05000348/1981031
Text
-
.
..
APR 151982
Alabama Power Company
ATTit: fir. R. P. licDonald
Vice President-Nuclear Generation
P. 0. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject:
Report llos. [348/81-3Dnd 50-364/81-34
This refers to the special site inspection conducted by fir. T. A. Peebles of this
office on December 26 - January 4,1982 and to the management meeting held at the
Region II office on Janaury 26, 1982 regarding the Unit 2 spray additive system
not being operable. The scope of the inspection related to activities authorized
by llRC Operating license NPF-2 and NPF-8 for the Farley 1 and 2 facility.
Our
preliminary findings were discussed with f1r. W. G. hairston, Plant fianager, at
the conclusion of the site irispection and with Mr. R. P. licDonald and staff at
the January 26, 1982 management meeting.
Areas examined during this inspection included control of valve lineups. Within
these areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by the
inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the flotice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In addition to the need for corrective action regarding this specific violation,
we are concerned about the implementation of your management control systems that
pennitted this occurrence.
Consequently, in your reply, you should describe in
particular those actions taken or planned to improve the effectiveness of your
management control systems, specifically in the area of valve verification.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the flRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of fianagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8206070352 920527
PDR ADOCK 05000348
G
l
"
.
.
.
Alabama Power Company
2
APR 151982
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
f
R. C. Lewis, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/81-31
and 50-364/81-34
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, General flanager-Nuclear Generation
0. D. Kingsley, Jr., flanager, Nuclear Engineering
and Technical Services
J. W. ItcGowan, !!anager-Safety Audit
and Engineering Review
W. C. Carr, Supervisor-Sa fety Audit
and Engineering Review
W. G. Hairston, III, Plant ftanager
bcc w/ encl:
NRC Resident Inspector
Document flanagement Branch
State of Alabama
-
-,,
RII.t/[
gr(,
VL
,
- [
RII
p
RI
RII
v
v
ws
TPeebles:dt
J ogge
VBrownlee
PJKeHegg
Q
([40i5
6/
3/ /82
$/f/E2
f82
g
'\\(V/82
f/ gr
A
\\
4fl u
9hzjtt
p\\,
! .
u