Text
\\
L
s
6
,
g
.
w
.
x-
1
l
'
,
s
MAY : 91982
'
,1
}
'
s
2
s
Dacket No. 50-454-
i
Docket No. 50-455
,
\\
,
Commonwet'th Eo' son Company
- '
,
ATI'N :
Mr. Cordel5 Reed
>
,
Vice President
i
Post Office Bcx 761
.
Chicago, IL 6CJ"3
'
,
s
'
i '
Gentlemen:
'
This refer.y to'the routine safety inspection conducted by Mr. W. L. Forney
of this errice on March 22 through April 30, 1982, of activities at Byron
Station, /nius 1 and 2,. authorized by VRC Construction Permits
J4o . CPTR-130 and No. 'CPPR-131, and to the discussion of our findings with
Mr. V. I. Schlosser and athers of your siaff at the conclusion of the
-
-inspection. $
.
,
The enclosed tofj'of our inspection report identifies areas examined during
,
the inspection. With n these. areas, the inspection consisted of a selective
3
examination of procedures an6 representative records, observations, and la-
terviews with personnol.
During this inspeqtion, certain of your activities, appeared to be in non-
compliance with NRC requirements, as specLfied in'the enclosed Appendix.
,
A written response is required. We are concerned about the lack of effec- s
tiveness of your quality assurance prograo that allowed these conditions
,
to occur.
Preoperational testing is a vital part,of demonstrating that
plant components and systems werr. designed, fabricated and installed to"
,
requirements.
In addition to your respanse to the item of noncom;.11ance '
.
please outline the steps you plan to take to improvb and increase your
quality assurance activities in this area to assure preoperational tests
are controlled and conducted;to requirements.
,
In accordance with 10 CFR L.'790 of the Commission'5 regul'ations, a copy of
this letter, the enclosures, and your response to this/ letter will be placed
in the NRC's Public Document Room.
If this report contrinn;any information
that you (or your contra'.: tors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary What you (a) notify this 'of fice by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the dato Sf this letter a written applicat:on t2 this office to
'
withhold such information.
If your " receipt of this letter'has been delayed
such that less than seven (7) days. tere available for your review, please
'
$
.
,
i
.
t
'
%
i
'
8206070340 02051o
-
PDR ADOCK 05700434
-
"""
5
7 0l',/
-
,
,
1
,
~
Commonwealth Edison Compeny
2
notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), at:y such application must be accom-
panied by an affidavit executed by the owner of the information which
identifies the documere or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure
This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter, the enclosures, and your response to this
letter will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by F.L. Spessaid"
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-454/82-07(DPRP) and
No. 50-455/82-05(DPRP)
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspectcr, RIII
Braidwood
Mary Jo Murray, Office of
Assistant Attorney General
Myron M. Cherry
R I
RII'/
(/ oQN
,
,
5/18/82 th
Sp"ssar b
rney
/
3