Proposed Tech Spec Table 3.2.C Re Instrumentation That Initiates Control Rod Blocks
ML20053C742
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/20/1982
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20053C732 List:
References
NUDOCS 8206020522
Download: ML20053C742 (3)


Text

.___ _ _-_ ___- ________ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ -

TABLE 3.2.C .

INSTRUMENTATION THAT INITIATES CONTROL ROD BLOCKS Minimum No. Instrument Trip Level Setting Number of Instrument of Operable Action Channels Provided Instrument by Design Channels Per Trip System 4 APRM Upscale (Flow d(0.66W+42-0.664W) x Biased) FRP 6 Inst. Channels (9) l MFLPD (2) 4 APFM Upscale (Startup 112% 6 Inst. Channels Mode) (9) l 4 APRM Downscale 12.5 indicated on 6 Inst. Channels (9) l scale 1 (7) Rod Block Monitor 1(0.66W+41-0.66AW)x 2 Inst. Channels (1)

(Flow Biased) FRP MFLPD (2) 1 (7) Rod Block Monitor 12.5 indicated on 2 Inst. Channels (1)

Downscale scale 6 IBM Downscale (3) 12.5 indicated on 8 Inst. Channels (9) l scale 6 IBM Detector not in (8)

Startup Position 8 Inst. Channels (9) l 1108 indicated on 6 IRM Upscale 8 Inst. Chant .el s scale (9) l 2 (5) SRM Detector not in (4) 4 Inst. Channels (1)

Startup Position 2 (5) (6) SEM Upscale 110 counts /sec. 4 Inst. Channels (1) 8206020522 820526 PDR ADOCK 05000277 P PDR t

PBAPS

9. For the Startup (for IRM rod block) and the Run (for APRM rod block) positions of the Reactor Mode Selector Switch and with the number of OPERABLE channels :
a. One less than required by the Minimum OPERABLE Channels per Trip Function requirement, restore the inoperable channel to OPERABLE status within 7 days or place the inoperable channel in the tripped condition within the next hour.
b. Two or more less than required by the Minimum OPERABLE Channels per Trip Function requirement, place at least one inoperable channel in the tripped condition within one hour.

l l

r

- 74a -

I

Philadelphia Electric Company  :

Peach Bottom Atomic Power Station ROD WITHDRAWAL BLOCK SIMPLIFIED SCHEMATIC (APRM and IRM circuits only) 120 V.

INSTRUMENT POWER p_ ____________ ____

l

, I  ::CHAN A  ::CHAN Cl:

I I kcaciOR l ::CHAN E  ::CHAN Gl REACTOF MODE  : l lRM I:: MODE SWITCH l  ::CHAN B  ::CHAN DI SWITCH.

I i :CHAN F bCHAN gHl l

I L__ _ _ _ _ _ _ _ _ _ _ _ - _ _____s r-I .

I I  ::CHAN A :CHAN C I I i .

I  ! :CHAN E APRM  : CHAN B l 1 I

l l  ::CHAN D :CHAN F I I

L__ __

l

/ 3AKl* / 3AK2' 120 V.

INSTRUMENT POWER ROD WITHDRAWAL ROD WITHDRAWAL BLOCK NO.1 BLOCK NO. 2 (DE-ENERGlZED TO BLOCK) (DE-ENERGlZED TO BLOCK)

  • DE-.ENERGlZE EITHER 3AK1 OR 3AK2 TO BLOCK EXHIBIT A