ML20053C647

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-362/82-06 on 820331-0405.No Noncompliance Noted
ML20053C647
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/11/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20053C648 List:
References
NUDOCS 8206020424
Download: ML20053C647 (2)


See also: IR 05000362/1982006

Text

_ _ _ _ _ _ _ _ _ _

_ _ _

v4

g

w

4*

.

pg 11 N

Docket No. 50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice Prasident

Advanced Engineering

Gentlemen:

Subject: NRC Inspection of Containment Integrated teak Rate Test,

San Onofre Unit 3

This refers to the inspection conducted by Messrs. A. D'Angelo and H. Canter

of this office on March 31 to April 5, 1982 of activities authorized by

NRC License No. CPPR-98, and to the discussion of our findings held with

Mr. C. R. Horton and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed

inspectics report. tiithin these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold infomation contained therein within thir v days

of the date of this letter. Such application must be consistent with the

requirementsof2.790(b)(1).

Should you have any questions concerning this inspection we will be glad

to discuss then with you.

Sincerely,

8206020424 820511

hf

DR ADOCK 05000

.

. gg

T u nichnn. chief

3p i

.

'

omc5 >

.RVf ik

Reactor Construction Projects Branch

su = <>

ECKHA DT

UE '

'

' '

~

om>

5-/.f./82

' 5/[.../82' * 177/B2"

"5WO/82"

'

'

...

.

.

.

.. .

.. .

.

.

.

. .

.

.

.

.

Nac resu aie no so,wucu eno

_ OFFICIAL RECORD COPY

'U M h 329 m

VM L . O'S

,

Sourthern California Edison Company

-2-

.

Enclosure:

Inspection Report

flo. 50-362/82-06

cc w/o enclosure:

fir. R. Dietch, Vice President

fluclear Engineering & Operations

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA ( W / Johnson)

Resident Inspector (5)

RHE (w/o encl)

.