ML20053C518
| ML20053C518 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 05/26/1982 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20053C519 | List: |
| References | |
| NUDOCS 8206020271 | |
| Download: ML20053C518 (2) | |
Text
%
D-h di
,~
cb c
Docket Hos: 50-329 9
and 50-330 MM 2 61982 g
Qg.
M4I y7%2' '-
Mr. J. W. Cook 2
- %u amu.47 Vice President S-Consumers Power Conpany
%
- War
/2 1945 West Parnall Road Jackson, Michigan 49201 f
l 4
ca l
Dear Mr. Cook:
Subject:
Issuance of Amendments No. 3 to Coastruction Pernits -
itidiand Plant, Units 1 and 2 I
The Nuclear Regulatory Commission has issued Amendment N'o. 3 to Construction Permit tio. CPPR-81 and Amendment No. 3 to Construction Permit No. CPPR-E2 which were issued to you for construction of the tiidland Plant, Units 1 and 2.
The amendments have been issued pursuant to a Memorandum and Order (Imposing Certain Interim Conditions Pending Issuance of Partial Initial Decision) by the Atomic Safety and Licensing Board dated April 30, 1982.
We have determined that these amendments do not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any signifi-cant environmental impact. Having made this determination, we have further conclud-ed that these amendrents involve an action which is insignificant from the stand-i point of environmental impact and, pursuant to 10 CFR 51.5(d)(4), that an environ-nental irpact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of the amendments.
We have concluded, based on the considerations discussed above, that:
(1)with respect to these amendments, the proposed facility can be constructed and operated l
without undue risk to the public health and safety, and (2) the issuance of these aDendments will not be inimical to the Comnon defense and security or to the health and safety of the public.
Copies of Amendment No. 3 to CPPR-81, Amendment No. 3 to CPPR-82, and a related notice which has been forwarded to the Of fice of the Federal Register for publica-tion are enclosed.
Sincerely, Elinor G. Adensam, Chief 8206020271 820526 Licensing Branch No. 4 PDR ADOCK 05000329 Division of Licensing A
Enclosures:
l 1.
Anendment No. 3 to CPPR-81 2.
Anendrent fl0. 3 to CPPR-82
- NOTE: SEE PREVIOUS _ WHITE FOR CONCURENCE J
Federal Re01 ster Not1Ce omen
.DL.;LB..RA1.W.. 0.L1.L6..RA....
sua c.)!/e n c.b...S.ee.ngt...n.a.S.e....
- Mounc.an/hmc.. *Dacod.......
am.......
.5/6J82........... 5lBJ82......... 5h,482.........
omy NGC FORM 318 (10-M) P4RCM 024o OFFICIAL RECORD COPY usom ini-muo
n
.~
pn s
Docket flos: 50-329 and 50-330 Mr. J. U. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear fir. Cook:
Subject:
Issuance of Amendments No. 3 to Construction Pemits -
Midland Plant, Units 1 and 2 The Nuclear Regalatory Comission has issued Amendment No. 3 to Construction Pemit No. CPPR-81 and Anendnent No. 3 to Construction Pemit No. CPPR-82 which were issued to you for construction of the Midland Plant, Units 1 and 2.
The amendments have been issued pursuant to a Menorandum and Order (Imposing Certain Interin Conditions Pending Issuance of Partial Initial Decision) by the Atomic Safety and Licensing Board dated April 30 1982.
t
- W =.A-o h kd Pg M Copies of Amendnent No. 3 to CPPR-81, Amendment No. 3 to CPPR-82, and a related notice which has been forwarded to the Of fice of the Federal Register for publica-tion are enclosed.
Sincerely, Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing
Enclosures:
1.
Amendment No. 3 to CPPR-81 2.
Amendment NO. 3 to CPPR-92 3.
Federal Renister Motice cc w/ enc 1:
See next page omcc>...ot:La%/ut. a t L a.. a
.0L:ts..u.....
sua m e>...t!DiannLhmg,p,(!p,9,d,,},}i...,,,EA,d,eg,s,ag,,,,,, om>...si.L.ja2........si.b.t.82....... 51....I82....... unc ronu sin o>eo> uacu ono OFFICIAL RECORD COPY us m i - m}}