MAY l 91982
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the special inspection conducted by Mr. K. D. Ward of this
office on April 19 and 20, 1982, and a meeting at the NRC Headquarters
in Bethesda, MD on April 23, 1982, concerning the once through steam
generator auxiliary feedwater header assembly damage at the Davis-Besse
Nuclear Power Station, Unit 1, authorized by NRC Operating License
No. NPF-3 and to the discussion of our findings with Mr. C. Daft at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
,
NRC's Public Document Room.
If this report contains any information
'
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary ti.at you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (?5)
days from the Jtte of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
9206020035 820519
DRADOCK05000g
Q@l
//
.
l
Toledo Edison Company
2
gg
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
i
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
i
to be withheld shall be inco.porated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
b
b
'
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-346/82-14(DETP)
cc w/ enc 1:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
.
'
Harold W. Kohn, Power Siting
Commissian
Helen W. Evans, State of Ohio
i
Rekert M. Quillin, Ohio
Department of Health
1
.
l
RIII
RIII
RIII r
RIII
I
)W
/)]ff
W
b
~
j
Wrd/jp
Danielson
etwr
Little
Stre[c/P
4/29/82