OPERATING DATA REPORT DOCKET NO. 50-334

[

DATE 5-12-82 COMPLETED BY

_L. W. Weaver TELEPHONE, 417-643-9303 OPERATING STATUS

l. Unit Name: Beaver Valley Power Station, Unit #1 Notes
2. Reporting Period:

Apri1, 1982

3. Licensed Thermal Power (MWt):

WO

4. Nameplate Rating (Gross MWe):

923 I

5. Design Electrical Rating (Net MWe):

852 i

6. Maximum Dependable Capacity (Gams MWe):

860

7. Maximum Dependable Capacity (Net MWe):

810

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since last Report, Give Reasons:

i

9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions. If Any:.

N/A This Month Yr.to.Date Cumulative

11. Hours In Reporting Period 720 2,880 52,584 *
12. Number Of Hours Reactor was Critical 0

0 21,059.29*

13. Reactor Reserve Shutdown Hours 0

0 4,482.8

14. Hours Generator On-Line 0

0 20,154.06

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 0

43,628,940.48

17. Gross Electrical Energy Generated (MWH) 0 0

13.650,440

18. Net Electrical Energy Generated (MWH)

-2,505

-14,169

_t2,509,785

19. Unit Service Factor 0

0 39.9

20. Unit Asailability Factor 0

0 39.9

21. Unit Capacity Factor (Using MDC Net) 0 32.5 0
22. Unit Capacity Factor (Using DER Net) 0 0

30.9 i

23. Unit Forced Outage Rate 0

0 40.2

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

i Refueline Outace 12/28/81, 20 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

May 21. 1982

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A Data was erroneous for the months of February and March.

Corrected copies of the February and March Operating Data Reports are attached.

820 6 010 A66

.