ML20053B814
| ML20053B814 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 05/18/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8206010253 | |
| Download: ML20053B814 (3) | |
Text
__ _
y TENNESSEE VALLEY AUTHORITY
'/,RC p g,,
'I d/
400 Chestnut Street Tower II fig % Y 20 May 18, 1982 g 5,. g g S D - V.3 2 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgic 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - QA BREAKDOWN - DEFICIENT FILLET WELDS - NCR'S 1188, 1203, AND 1563 - NINTH INTERIM REPORT On May 7,1980, R. W. Wright, NRC-0IE Region II, was informed that nonconformance report (NCR) 1188 was determined to be reportable in accordance with 10 CFR 50.55(e). Since that time, related NCR 1203 has been determined to be reportable in accordance with 10 CFR 50.55(e). This was followed by our interim reports dated June 6, September 19, and December 15, 1980 and March 6 and June 10, 1981. So:=c of the affected welds are inaccessible for inspection; therefore, NCR 1563 has been written to disposition these welds. This was followed by our interim reports dated August 27 and December 11, 1981 and March 5, 1982. Enclosed is our ninth interim report. We expect to submit our next report by November 16, 1982.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Ma ger Nuclear Licensing Enclosure oc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
()FFICIAL CO%
82060 10 A53 16 zvj 5
I* If A An Equai opportunity Empioyer
1 i'
o l
e ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 QA BREAKDOWN - DEFICIENT FILLET WELDS NCR'S 1188, 1203, AND 1563 10 CFR 50.55(e)
NINTH INTERIM REPORT Description of Deficiency Numerous fillet welds located in various safety-related systems do not meet ASME Code and/or TVA Construction Specification G-29 requirements because of inadequate fillet leg size or theoretical throat dimensions. Deficient welds have been found in socket weld fittings and socket weld flanges (NCR 1188), and in component support welds (NCR 1203). This quality assurance problem is attributable in part to the procedure for fillet weld inspection because it did not accurately reflect the applicable ASME Code requirements. Additional problems with socket weld flanges arose because, at the time the procedures were written, G-29M requirements did not specify socket weld flange requirements. G-29M was revised on March 2i, 1979, to include socket weld flange requirements.
However, TVA failed to incorporate this change into its site quality control procedure. Fillet weld gauges not being available to assist the inspectors in determining the adequacy of welds also contributed to the problem.
Interim Progress NCR 1188 A total of 10,140 socket welds in 43 plant systems under the scope of NCR 1188 were identified. Of this amount, 9,451 were reinspected, 673 were embedded, and 16 more are inaccessible for inspection. NCR 1563 was written to disposition these embedded and inaccessible welds.
The total rejectable of those inspected was 668 welds equating to a total reject rate of 7.1 percent. Only 66 welds (0.7 percent) were undersized by more than 1/16". A breakdown on those welds found rejectable follows:
Undersized Throat Undersized Leg Undersized Leg & Throat Together 318 271 79 All rework on accessible welds has been completed. To prevent recurrence, guidelines for accepting various welds have been added to quality control procedures mad inspectors have incorporated use of weld gauges. TVA has inspected 540 socket welds that were made sometime after completion of inspector training and implementation of the use of fillet weld gauges, and no rejectable welds were found.
i l
e
/
d Page 2 NCR 1203 Two hundred randomly selected supports of the approximately 8,500 supports identified under the scope of this NCR were reinspected and data submitted for evaluation. TVA has determined all welds under the scope of this NCR should be reinspected. All rejected welds are being reworked or evaluated on a case-by-case basis to qualify existing welds. A total of 5,654 hangers have been reinspected as of April 19, 1982. This constitutes a total of 19,381 Welds. Of the 19,381 welds reinspected, 7,196 have been rejec ted.
This indicates a rejection rate of approximately 37 pecent.
Further progress will be noted in our next report.
NCR 1563 Nonconformance report 1563, resulting from NCR 1188, addresses a total of 689 socket welds categorized as " inaccessible." TVA is gathering the available information on these welds and will evaluate this information to determine a possible course of action. A final report on NCR 1563 will be supplied pending completion of the evaluation.