DISTRIBUTION:
ISY ?
in~
Docket Nos.- 50-329/330 0H, OL NRC PDR
^
Local PDR ABrauner, NRR NSIC BPCotter, ASLBP Docket !!cs: 50-329 OM, OL EAdensam ACRS (16) and 50-330 OM, OL DHood CMiles, OPA MDuncan m
fir. J. W. Cook RTedesco o
g Vice President DEisnehut/RPurple e
j Consumers Power Conpany JRutberg, OELD a,
eo 1945 West Parnall Road JSaltzman, AIG pq ij
,y Q
Jackson,flichigan 49201 I&E EC ]gp g
Attorney, OELD L
g
Dear if r. Cook:
yyg "i
{
Q iij Q "Ji AS dp 6
Subject:
Completion of Soils Remedial Activities Review N a /,d
/
In several neetings and discussions held during the months of April l'
c, you were infomed by the staff of the approach to be used for the review of the soils renedial activities at Midland Plant, Units 1 and 2.
This approach is intended to nake the review process core consistent with that followed by the staf f for license applications and improve the efficiency of the staff review.
Specifically, the previous staff practice of approving each individual construc-tion step for each reredial neasure as the review progresses will generally be discontinued by the staff. The staff intends to complete the entire review of the soils renedial activities and related natters as an integrated package and then proceed with ACRS r.eetings and hearing sessions in the normal fashion.
Although no activities directed to remedial actions for the soils deficiencies are expected to be approved prior to completion of the staff's integrated review, those for which staf f review was substantially completed as of April 1,1982, dre, however, approved. These are discussed below.
Un the basis of the staff technical review of documents listed in Enclosure 1, the staff concurs with your plan to proceed with Phase 2 underpinning activities (which involve excavation under the feedwater isolation valve pit and the turbine building) subject to the successful completion of conditions listed in Enclosure 2.
Accouplishment of these conditions should be docucented and Region III noti-fled. provides a definition of Phase 2 on which the staff's approval is based, and further discusses the staff's understanding of approved quality assurance plans for this and other soils work.
He are further responding to your letter of fiay 10, 1982, which addresses certain soils construction work you believe had staff approval prior to the Licensing Board's llenorandum and Order of April 30, 1982. Staff coments and conclusions on Paragraphs I and II are p ovided in Enclosure 4.
82C5280526 820525 PDri ADOCK 05000329 A
..... ~~
..~ ~ ~"~ "
~ ~
" " ~
~ " " " " " " "
omy OFFICIAL RECORD COPY uso m nSo-m a nac ronu ais oo-somacu oao
w Mr. J. W. Cook With respect to your Paragraph III, you note you are continuing with certain soils remedial work with full awareness and concurrence of the staff for which explicit written approval had not been obtained. You also noted that this work has been stopped in accordance with the Order and requested that the staff verify its con-currence so that the work can be reactivated. The three work itens you identified in this category are:
(1) installation of deep-seated benchmarks, (2) installation and operation of construction dewatering wells that were not previously operating, and (3) installation of monitoring system instrunents and nounting.
Itens (1) and (2) are conditionally approved as addressed by Enclosure 5 and 6, i
respectively. With respect to item (3), your letter notes that work on the moni-toring system instruments and nounting for the auxiliary building is presently stopped because Region III concurrence has not been obtained. We are advised that Region III will provide explicit written confirmation of HRC approval fol-lowing resolution of existing QA deficiencies.
Your letter of May 10, 1982, also forwarded Drawing 7220-C-45 for purposes of defining which soils at the Midland site are safety related (i.e., are considered to be under and around safety-related structures and systems). During a May 5, 1982, conference telephone call with the Licensing Board and hearing parties, Consumers proposed to use this drawing to define the bounds for the term "around" in Sections VI(1)(a), (b) and (c) of the Board's April 30, 1982, Memorandum and Order. The Board's subsequent Memorandum and Order of May 7,1982, requested the staff to advise the Board of the results of its review of Drawing 7220-C-45. The l
results of our review are presented in Enclosure 7; and, on the basis of your com-mitments to nodify the drawing, we find this drawbg to be acceptable for the pur-pose of defining areas around safety-related structtires and systems.
l In addition, Enclosure 8 lists the information required by the staff to conclude its review of the soils remedial work. This list is based upon staff review of information provided by your letter of March 31, 1982, and earlier subaittals.
Certain of the information needs may already have been transmitted by you. You are requested to provide your response schedule within seven (7) days of receipt l
of this letter. Once your schedule is received, the staff will develop the review corpletion schedule for this effort.
l omce>
su m me>
one>
NRC FORM 313 (10-80) NRCM 0240 0FFiCIAL RECORD COPY usc e m - m.,eo
=.
=
m.
A
\\
"O 3
c.
+
Mr. J. W. Cook,
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, CMB clearance is not required under P.L.96-511.
Sincerely,
'Driginal signc${.7.
I)arrell G. Eisenhyf i
Darrell G. Eisenhut, Director j
Division of Licensing
Enclosures:
As stated cc: See next page i
4 i
1 I
\\P
' 6
<v'O.(,,4jjk o
0 l' 8 6./2......
..DD d.f.4....
.DL.:.LB..B.DL6:RLb:Lf4 o
0 L.......
... D.I
.-r -.!~O.......
omce >
...g.~..O.--
.DHood/.hcic.gt.MDdjcan........
s am.......
esco-....DE. _. h t..
ja i
suanac k
. -. ~...
.5/.l./.82..........5/M.k.82.........
.. 5&f/.82......
.. 5@.......:.y;hl.,,@
l 8.$ l.E....
.5 /..'d.8 2........
04re >
OFFiClAL RECORD COPY usom mi-assea Nnc ronu ais00-803 nacu 024a
'e MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamar' 1, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza
- Chicago, Illinois 60603 William J. Scanlon, Esq.
2034 Pauline Boulevard James E. Brunner, Esq.
Ann Arbce, Michigan 48103 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jacksort, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Ccnsumers Power Conpany 720 Law Building 212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
Mr. Roger W. Huston SIGMA IV Building Suite 220 Richland, Washington 99352 7910 Woodmont Avenue Bethesda, Maryland 20814 Mr. I. Charak, Manager NRC Assistance Project Mr. R. B. Borsum Argonne National Laboratory Nuclear Power Generation Division 9700 South Cass Avenue Babcock & Wilcox Argonne, Illinois 60439 7910 Woodmont Avenue, Suite 220 Beth ada, Maryland 20814 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Cherry & Flynn Region III i
Suite 3700 799 Roosevelt Road Three First National Plaza Glen Ellyn, Illinois 60137 Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108
j Mr. J. W. Cook,
i cc:
Commander, Naval Surface Weapons Center ATTN:
P. C. Huang j
White Oak Silver Spring, Maryland 20910 i
Mr. L. J. Auge, Manager Facility Design Engineering 2
Energy Technology Engineering Center P.O. Box 1449 Canoga Park, Cali fornia 91304 Mr. Neil Gehring U.S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 i
Charles Bechhoefer, Esq.
Atomic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 i
Mr. Ralph S. Decker Atomic Safety & Licensing Board U.S. Nuclear Pegulatory Commission l
Washington, D. C.
20555 Dr. Frederick P. Cowan Apt. B-125 i
6125 N. Verde Trail Boca Raton, Florida 33433 s
Jerry Harbour, Esq.
i Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 i
Geotechnical Engineers, Inc.
j ATTN: Dr. Steve J. Poulos 1017 Main Street l
Winchester, Massachusetts 01890
)
i
,-r-..,
-,.---,-..,~~,.,_-,my-__,.._._,.,_._-.--._,---.,.---.--,,----_m.c__,....-,,,_
,,._.-,,....,,.r-,
n m
4 1
LISTIfiG OF ENCLOSURES
" Basis for Staff Concurrence for Start of Phase 2"
" Conditions for Staff Acceptance of Phase 2"
)
" Definition of Phase 2 Underpinning Activities and Quality Assurance Plans for Soils Activities" i
1
" Staff Corpents on Continuing or Planned Soils Activities i
Previously Approved by the Staff"
" Installation of Deep Seated Benchmarks" i
" Construction Dewatering Wells" t
" Staff Evaluation of Drawing 7220-C-45"
" Additional Information Required to Corplete Staff Review of Soils Renedial Work" s
/
OFFICE)
.........~.naa.a.n
.... a a a a a
- aa **""
"."""a"""*."***
stcnme >
.. ~ ~.. ~.... ~. - ~
ocre p
-.. ~...... ~... - - -
inc ronu m 00-8o) uncu oua OFFIClAL RECORD COPY tem im--meno
Ef4 CLOSURE 1 BASIS FOR STAFF C0fiCURREt1CE FOR START OF PHASE 2 1.
Letter to R. Vollmer from R. T. Ilanilton, dated July 8,1975, transmitting Bechtel quality assurance topical BQ-TOP-1, Revision 1A 2.
Letter to H. R. Denton fron J. W. Cook, dated September 30, 1981, Submitting the Auxiliary Building Dynamic Model, Technical Report on Underpinning the Auxiliary Building and Feedwater Isolation Valve Pits 3.
Letter to H. R. Denton from J. W. Cook, dated tiovember 16, 1981, on Response to the flRC Staff Request for Additional Information Pertaining to the Proposed Under-pinning of the Auxiliary Building and Feedwater Isolation Valve Pits 4
Hearing testinony by CPC witnesses (Johnson, Burke, Gould, Corley and Sozen) on renedial underpinning work for the Midland Auxiliary Building, flovember 19, 1981 5.
Hearing testinony of D. Hood, J. Kane and H. Singh concerning the Remedial Under-pinning of the Auxiliary Building Area, dated 11/20/81 6
Hearing testinony of F. Rinaldi, dated 11/20/81 7.
Letter to H. R. Denton f rom J. W. Cook, dated 11/24/81 on Test Results, Auxiliary Building, Part 2, Soil Boring and Testing Program 8.
Letter to H. R. Denton fron J. W. Cook, dated December 3,1981, with Addendum to Technical Report On Underpinning the Auxiliary Building and Feedwater Isoloation Valve Pits 9.
Letter to H. R. Denton f rom J. W. Cook, dated January 6,1982, on Auxiliary Building Underpinning - Freezewall; Effects of Freezewall on Utilities and Struc-tures
- 10. Letter to H. Denton and J. Keppler from J. W. Cook, dated January 7,1982, trans-mitting general Quality Plan for underpinning activities and Quality Plans and Q-Listed activities for SWPS and Auxiliary Building Underpinning
- 11. Design audits of January 18-20,1982 (Sumary dated March 10,1982); Feburary 1-5, 1982; March 16-19,1982; and neeting of February 23-26,1982, (Sumary dated March 12,1982)
- 12. Letter to H. R. Denton from J. W. Cook, dated February 4,1982, on Auxiliary Building Access Shaf t - Augering Method for Soldier Pile Holes omcc>
i su naus) care y
"" $"" " U""#" " --
" " ~ * *
% EliCLOSURE 1
- 13. Letter to J. W. Cook from R. L. Tedesco, dated February 12, 1982, on Staff Concurrence for Activation of Freezewall
- 14. Letter to H. R. Denton f rom J. W. Cook, dated March 10, 1982, on Protection of Excavation Face - Auxiliary Building Underpinning Shaft
- 15. Sunnary of March 8,1982 Telephone Conversation Regarding 5011 Spring Stiff-nesses for Auxiliary Building Underpinning and Phase II Construction, dated March 11, 1982
- 16. Letter to H. R. Denton from J. W. Cook, dated March 31, 1982, on Response to the liRC Staff Request for Additional Information Required for Cocoletion of Staff review of Phases 2 and 3 of the Underpinning of the Auxiliary Building and Fee &teter Isolation Valve Pits
- 17. Letter to J. Keppler from J. W. Cook, dated April 5,1982, describing Quality Assurance for Reuedial Foundation Work
- 18. Letter to H. Denton frou J. W. Cook, dated April 26, 1982, transmitting quality assurance topical CPC-1-A, Revision 12 ornce>
. - -.. ~.. - - -
~ ~ ~. - ~ ~ ~.
9URNWE) oan p
................. ~..
nne renu m 0o-803 sncu o24o OFFiClAL RECORD COPY usc = = - m mo
74
(
s CONDITIONS FOR STAFF ACCEPTANCE OF PHASE 2 1.
Deep-seated bench marks DSB-AS1 and DSB-AS2. DSB-AS1 and DSB-AS2 shall be installed at a distance not to exceed b-teet from the wall of the main auxiliary l
building which is founded at Elevation 562. Actual locations of these installed bench marks and any nodifications in tolerance criteria required on Drawing C-1493(Q) due to changes from the original DSB-AS locations shall be documented.
2.
Monitoring instrumentation required to be installed. The following deep seated benchnarks and relative-absolute reasurenent devices identified on audited drawings shall be properly installed and operating for at least 7 days prior to drifting under the turbine building or Feedwater Isolation Valve Pit (FIVP):
^ Deep-Seated Benchmarks Relative-Absolute Measurement Devices DSB-1W DSB-AS1 DMD-1W DSB-1E DSB-AS2 DMD-1E DSB-2W DSB-AN DMD-11 DSB-2E DMD-12 DSB-3W DMD-13 1-DSB-3E 3.
Strain gauge installation. Revisions shall be made to the pro, td instrumenta-tion shown in drawing C-1495, " Instrumentation - Elevation 695 - 0 5/16" for Building Settlement Monitoring". On the sectional view at the wall at Column Lines 7.4 and 7.8, change the orientation of proposed lower strain gauges between Elevations 584 to 614 to be perpendicular to the orientation shown on Drawing C-1495, Figure 3 in the March 31, 1982 submittal. On this sane sectional view, add an additional strain gauge between Elevations 646 to 659 at an inclination similar to the above recorrended orientation. Also, correct the labeling of column lines H and G which is reversed on the copy of the sectional view sub-nitted to the staff.
4.
Pier load test procedures. The following nodifications and additions shall be nade to the pier load test procedures provided by the April 22, 1982 submittal from J. Cook to 11. Denton, " Response to the NRC Staff Request for Additional Infornation Required for Completion of Staff Review of the Borated Water Storage Tank and Underpinning of the Service Water Pump Structure."
(Consumers Power Corpany (CPCo) stated that, although the procedures were submitted for under-pinning work for the service water pump structure, the procedures are applicable to the pier load test to be conducted during Phase 2 underpinning work for the auxiliary building. )
4 omcc) sunswe) om>
anc ronu :na oo so sacu om OFFICIAL RECORD COPY usom nu-m m i
. EHCLOSURE 2 l
a.
The maxiron required test load should be equal to 1.3 times the maximum anticipated design load. As an alternative, should there be structural difficulties in developing the required reaction load for the prior test, the staff would accept a procedure where the maxir.om test load for the pier Inad test was equal to 90 percent the maxinun anticipated design load and a plate load test (ASTil D1194) was performed to a maxinum test load equal to 130 percent of the maxicon anticipated design load.
(See l
Page 12 of submittal).
i b.
Significant modifications to the specified ASTri D1143-81 test procedures, as may be appropriate, require advanced notification and approval of the Region III Office.
(See Page 12 of submittal.)
c.
The rate of settlement shall not exceed 0.005 inch per hour when control-ling the length of time that the 907. test load increment is to be main-tained.
(See Page 12 of submittal).
d.
In order to provide a more positive reduction of skin f riction, plywood
]
sheeting coated with 1/8-inch thick bitucen (or equivalent) shall be Installed on all test pier sides prior to performing the pier load test as a replacement for the plastic sheeting proposed by CPCo.
(Seepage 12 of submittal).
e.
To permit correlation with the previously approved r:easures proposed by CPCo to demonstrate the adequate foundation capacity of the other installed piers, a minimon of two in situ density tests and five cone penetroneter tests shall be performed on the soil at the bottom of the l
pier selected for test loading.
S.
Construction dewatering. During underpinning of the auxiliary building area, i
the upper phreatic surface shall be maintained a miniron of 2 feet in depth below the botton of any underpinning excavation at any given tine. The final plan for the dewatering system shall be established and implemented in advance of drif ting under the turbine building or FIVP. The dewatering plan should include the locations and depths of the dewatering wells and piezoneters l
(observation welis). Criteria for monitoring loss of soil particles due to
]
punping shall be the sar.e as those previously approved by the staff for the construction dewatering of the service water pump structure (R. Tedesco letter of April 2,1982) or for the permanent dewatering wells (R. Tedesco letters of June 18, September 2, and October 22,1981).
6.
Monitnring movement of FIVPs. Jacking of the FIVP back to its original position shall be required if the relative settlement between the reactor containment and the FIVP reaches a total settlenent of 3/8-inches since the time piping connec-tions were made.
orncc>
sununur >
2 ocrc >
OFFIClAL RECORD COPY usam mi-mm mc ronu sia <io-so) sncu o24o
EfeCLOSURE 3 DEFINITI0ft OF PHASE 2 UllDERPINNING ACTIVITIES Afl0 QUALITY ASSURANCE PLAN FOR SOILS ACTIVITIES Phase 2 construction activities for the Midland auxiliary building underpinning are defined by Bechtel drawing C-1418-1(Q) Revision A. " Auxiliary Building - Underpinning Construction Sequence", and associated plan and logic drawing C-1418(Q), Revision A, both issued for information 3/19/82 and provided to the staff during an audit meeting on that date.
With respect to quality assurance requirements for Phase 2 work, CPCo's letter to H. Denton/J. Keppler dated January 7,1982, transmitted a general Quality Plan for underpinning activities along with quality plans for the service water pump struc-ture underpinning system and for the auxiliary building underpinning system and FIVPs.
These plans describe the basic QA progran controls to be applied to items and activities associated with the soils remedial work. We find these plans, including the QA prograns described in Revision 12 of Consumer's QA Topical Report CPC-IA and Bechtel's QA Topical Report BQ-TOP-1, Rev. lA, acceptable for the soils renedial work. However, a condition for this finding is that these quality assur-ance plans and programs are to apply to 1) all items and activities identified in the ASLB Memorandua and Order of April 30, 1932, and 2) all of the to-go under-pinning Q-listed and non Q-listed work described in your April 5,1982 letter to J. Keppler, except that work stated in attachment 1 of that letter. We interpret these plans and program to nean that the liidland Project Quality Assurance Depart-nent will be actively involved in reviewing contractor's, sub-contractor's, and consultant's quality assurance capabilities and assuring thorough review of pro-l cedures and verifications that hardware is built and work is performed in accord-ance with design, specification, and procedural requirements. Accordingly, we conclude that the above referenced Quality Plan is acceptable for implementation i
as described above.
Since the foregoing conforms to the April 30, 1982, Board Order, any deviations must be reported to the staff.
l l
l l
CFFiCE )
SURNQME)
.. u n..
a u..
om)
...~.~.
Nnc ronu 3ia no-soi nscu o24a OFFICIAL RECORD COPY usoea mi--mseo
~.-
'~
3 3
s l
ENCLOSURE 4 STAFF COMMENTS ON CONTIfiUING OR PLANNED SOILS ACTIVITIES PREVIOUSLY APPROVED BY THE STAFF 4
The following coments are provided to clarify the staff's prior approvals of renedial soils activities at the Midland Plant. Each ~ 11sted item injaragraphs i
I and II of CPCo's Hay 10, 1982, letter is presented and addressed.
"I. s.
Phase I Work (Auxiliary Building Underpinning)",
s u-The specific activities for Phase I work referred to in our letter of concurrence (Reference 5) for installation of the vertical access shafts were those defined by Consumer's Drawing " Underpinning Auxiliary Building Construction Sequency Logic" dated January 20, 1982.
"I.b.
Access Shaf t ( Auxiliary Building Underpinning)"
5 This iteo is included in the staff's definition of " Phase I work" and is discussed under paragraph I.a. above. m "I.c.
Freezewall Installation, Underground Utility Pretection, Soil Renoval Cribbing and Helated Work in Support of the Freezewall Installation, 1
Freezewall penitoring and Freezewall activation" References 6 and 7 provided staff concurrences for freezewall installation and ' activation, respectively. These approvals were based upon CPCo's plan to elininate the inducer.cnt of stresses to the conduits and piping because of heaving by excavating the soil directly beneath affected utilities within i
the projected area of influence of the freezewall before ground freezing begins. The approvals also recognized your comitments (1) to demonstrate i
to the staff's satisfaction that recompression of the foundation soils beneath the piping or ducts has been completed before backfilling the excavation, and (2) to notify Region III personnel prior to drilling near l
seismic Category I underground utilities and structures. The approval was further contingent upon the successful audit by the NRC Regional Office III of the implementation procedures for excavation and monitoring.
The information which provided the basis for staff review and approval was provided by CPCo's letters of November 16 and 24,1981, and January 6,1982, and by hearing testinony of your consultant, J. P. Gould.
Consequently, the staff agrees that prior explicit concurrence for the i
activities listed by paragraph I.c. of CPCo's letter, May 10,1982 had been obtainert f rom the staff prior to the April 30, 1982 Order, except for the ad>iguous phase you included "and. elated work in support of...".
Therefore, the staff did not approve "related work" in its letters of l
concurrence or other records, ornce>
............. ~.
~. ~... ~.. ~..
~ ~ ~. ~..~ ~
i
$URNAME) ocTE )
OFFIClAL RECORD COPY usamou-mm enc ronu m ooaomacu ono
4 A EHCLOSURE 4 "I.d.
Installation and Operation of the Pernanent Site Dewatering System" The identity and location of the 65 permanent dewetering wells approved by the staff are given in References (1), (2) dod (4).
Installation and nonitoring aspects of the permanent site dewatering system, exculding seismic aspects, was to be performed as Q-listed activities following staff review and approval of associated quality assurance and quality control documents.
"I.e.
Operation of Existina Construction Dewatering Hells" The only construction dewatering wells approved by the staff are those identified by References (6) and (10). This item is further discussed in Enclosure 6.
As noted therein, however, construction wells installed and monitored to procedures equivalent to those fcr permanent wells nay be considered acceptable.
"I. f.
FIVP Proof Load Test" The staff has no record or recollection of concurrence for a FIVP proof load test. Therefore, this test is not approved.
"II.a.
Installation and Activation of Dewatering Systen for the Service Water Pump Structure" Staff approval was indicated by Reference (10), subject to certain coa-uitted charges specified therein.
2 "II.b.
The Repair of Cracks in the Bcrated Water Storage Tank Ring Wall" i
Staff approval was indicated by Reference (9), which noted your com-l nitrent to pressure grout at least all cracks with widths in excess of 10 mils. This activity follows the completion of the valve pit sur-charge programs which were also the subjects of prior staff approvals l
(References (3) and (8)).
l In suumary, ambiguity associated with CPCo's use of the terns " Phase I work" and l
"related [ freeze wall] work" preclude confirmation of specific prior approval of I
these activities. Similarly, failure by CPCo to identify the particular existing j
construction dewatering wells precludes us f rom deternining whether previous staff concurrence had been indicated. No description or discussion is provided for a l
"FIVP proof load test" and no record of prior staff approval can be located. Con-sequently, continuation of these activities in cnnformance with the fore' going staff comments will be in accordance with the Board Memorandum and Order of i
i April 30,1982. Any deviations nust be reported and approved by the staff.
oFFtCE >
SURNAME) oney NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY w o i,u - m.e.
'% ENCLOSURE 4
References:
(1)
R. Tedesco letter of June 18,1981, " Staff Concurrence on Installation of Twelve Backup Dewatering Wells" (2)
R. Tedesco letter of September 2,1981, " Staff Concurrence
- on Installation of Eight Backup Dewatering Wells" (3) i?. Tedesco letter of September 25,1981, "Staf f Concurrence on Surcharging of Valve Pits for Borated Water Storage Tank Foundations" (4)
R. Tedesco letter on October 22, 1981, " Staff Concurrence on Installation of Permanent Dewatering Wells and Request for Additional Infornation" (5)
- k. Tedesco letter of November 24,1981, " Staff Concurrence for Construction of Access Shafts and Freezewall in Pre-paration for Underpinning the Auxiliary Building and Feed-water Isolation Valve Pits" (6)
R. Tedesco letter of December 28,1981, " Staff Concurrence for Five Temporary Dewatering Wells" (7)
R. Tedesco letter of February 12,1982, " Staff Concurrence for Activation of Freezewall" (8)
R. Tedesco letter of February 26,1982, " Staff Concurrence on Renoval of Surcharge from Borated Water Storage Tank i
Valve Pits" (9)
R. Tedesco letter of March 26, 1982, " Staff Concurrence for Grouting of Cracks in Concrete Foundations of Borated Water Storage Tanks" (10)
R. Tedesco letter of April 2,1982, " Staff Concurrence for Installation and Operation of Construction Dewatering and Observation Wells for the Service Water Pump Structure" r
l OFFICE) tuRNAME )
., = = ~ - ~ ~. * *. *. * *.
- o4rE )
................. ~...
. - -.. ~. - ~ ~ "
-. ~. ~. - ~ ~ ~
> NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY uscro:isn-=wa
4 m
g g
ENCLOSURE 5 STAFF CONCURRENCE ON IN5TALLATION OF DEEP SEATED BENCHMARKS CPCo's letter of Hay 10, 1982 states that installation of deep-seated benchmarks is being carried out by Woodward Clyde Consultants, which is subject to its own quality assurance program and procedures approved by Consumers and previously subject to staff inspections. We are advised that these NRC inspectiens have resulted in a finding that these activities are being conducted to an acceptable quality assurance prograre.
CPCo has also provided the staff with information on the installation of deep-seated benchmarks and relative-absolute instrumentation beginning with the design audit of January 18-19, 1982 and continuing through the submittal of March 31,1982 (Letter from J. Cook to H. Denton, Response to the NRC Staff Request for Additional Information Required for Completion of Staff Review of Phases 2 and 3 of the Underpinning of the Auxiliary Building and Feedwater Isolation Valve Pits). The information for the auxiliary building underpinning work which has been provided includes locations, depths, elevations, instru-mentation accuracy and typical installation details of the proposed instru-ments. This information is contained in the following documentation:
a.
Technical Specification for Monitoring Instrumentation for Underpinning Construction, Specification 7220-C-198(Q), January 18, 1982 Rev. 0 (Provided at the February 3,1982 Design Audit) b.
Drawings C-1490(Q) and C-1491(Q), Auxiliary Building, Instrumentation Location for Underpinning, January 20, 1982; Revision 1 (Provided at the february 3,1982 Design Audit) c.
Drawing C-1493(Q), Auxiliary Building and F.I.V.P., Instrumentation System and Honitoring Hatrix, May 29, 1982, Rev. A (Provided by applicant's letter of March 31,1982) d.
Sketches of Carlson Stress Meter and Telltale Installations, Midland Plant Instruments for Pier Measurements, January 15, 1982 On the basis of the technical review by the Staff and its consultants of the infor-nation in the above documents, including the quality assurance program, the staff concurs with Consumer's ' proceeding with the installation of the deep-seated bench-marks and relative-absolute instrumentation for nonitoring the auxiliary building underpinning work.
omer >
....... ~.
SUINA%E)
..... ~................
....a..
....... a..
............. a
....... ~
~aa ~~~~~
DATE )
a"~a"
"
- a
. an "a
a. ~.a a- ~ ~ a a *
==~..-=~.aaaa
. a a aa a.... = ~.
.an a una.
piRC FORM 318 (10-80) NRCM 024o OFFIClAL RECORD COPY uscroa.u-m.w
\\
h h
ENCLOSURE 6 CONSTRUCTION DEWATERING WELLS In the past Consumer's position with respect to temporary or construction dewatering has been that this work was not permanent, it was being conducted to enable perform-ance of construction activities and, therefore, the work did not require staf f approval. Consumers did not provide tne details of the construction dewatering design and installation and did not seek staff approval for these activities.
More recently the staff has concluded that certain aspects of construction dewater-ing activities related to underpinning the service water pump structure (SWPS) and auxiliary building could potentially affect the foundation stability of these nearly corpleted structures. The staff has actively reviewed the temporary construction dewatering plan for the SWPS and has reached agreement with CPCo on an acceptable plan (April 2,1982 letter with enclosures from R. Todesco to J. Cook, Staff Con-currence for Installation and Operation of Construction Dewatering and Observation Wells for the Service Water Pump Structure). The staff has not presently obtained or evaluated the final plan for construction dewatering during auxiliary building underpinning but has specified conditions for Phase 2 concurrence (Enclosure 3).
It is the staff's position, with respect to the remaining construction dewatering wells that are already installed and operating, that these wells be monitored for the loss of soil particles due to pumping similar to the requirements agreed upon and -
recorded in Enclosure 3 to the April 2,1982 letter.
The specifications for a construction dewatering well are dependent upon the specific application. Consequently, approval for typical field practices, on other than a case-by-case basis is not meaningful. Therefore, for the future, the design and installation details of construction dewatering wells that have not yet been operated or installed should be addressed on a case-by-case basis following appropriate notifi-cation of the staff by the CPCo. This procedure will permit an assessment of the safety significance of the proposed well. However, any construction well for which the procedures for installing and monitoring the loss of soil particles are equivalent to those previously approved for pernanent dewatering wells (which was in accord with a staff approved quality assurance plan) may be considered acceptable, provided also that the upper phreatic surface is maintained two feet below the botton of any exca-vation or as otherwise approved in advance by Region III.
OFFICE )
suRuauE)
Da?E )
NRC FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usaro. i,i_33,e4
~~
((
r--
g s
ENCLOSURE 7 l
l STAFF EVALUATION OF DRAWING 7220-C-45 Staff requirements for this drawing were provided by the staff on May 7,1982, i
t.o Messrs J. liooney, J. Schaub and others of CPCo. These were:
(1) The seismic Category I retaining wall to the east of tne service water pump structure is shown to be located in the non-Q zone.
CPCo should revise the drawing to provide for Q-listed control in the vicinity of this wall.
(2) The drawing should be revised to provide for Q control of soils activities for the erergency cooling water reservoir (ECWR), the-concrate service water discharge lines, and the perimeter and baffle dikes adjacent to the ECWR.
(3) CPCo should implement Q controls for certain aspects of work out-side the Q zone of Drawing 7220-C-45 which could impact safety related structures and systems. Examples include potential removal of fines by dewatering wells, improper location of borings near the Q boundary, and soil excavations at the boundary involving bnth Q and non-Q areas.
(4) CPCo should re-confirm that no seismic Category I underground utilities extend beyond the Q area bounds of the drawing.
CPCo's letter of May 10, 1982 notes the intent to revise the drawing to address the LCWR cogonents and other appropriate areas.
CPCo has also identified during the Itay 7 telephone discussion additional acasures being inplemented to assure propea location for drillings.
On the basis of CPCo's coamitnent to extend the controls of soils activities to 4
incorporate these staff requirements, the staff approves the use of Drawing 7220-C-45 for defining the areas around safety-related structures and systems within which the restrictions and requirements of the April 30, 1982, itemorandum and Order shall apply.
I omer) sunuauc >
DATE )
unc ronu aia no.aoi nacu oao OFFICIAL RECORD COPY umme
(g ENCLOSURE 8 ADDITION INFORMATION REQUIRED TO COMPLETE STAFF REVIEW OF S0ILS REMEDIAL WORK 1.
Provide the following information regarding the Auxiliary Building and Feedwater Isolation Valve Pits:
1.1 redesign of stiffened bulkhead against earth pressures during drift excavation to install needle beam assembly 1.2 revise report en crack evaluation to include consideration of the effects of multiple cracks 1.3 anaiysis of the construction condition using a subgrade modulus of 70 KCF and provide results 1.4 allowable differential settlements for Phase 3 (based on 1.3 above),
1.5 horizontal movement acceptance criteria for Phase 3 for instruments at top of EPAs and control tower 1.6 as-built report with confirmatory detail on underpinning in FSAR upon completion of construction 1.7 acceptance criteria for strain monitors for Phase 3 1.8 acceptability of 1.5 FSAR SSE versus SSRS as Munding design 1.9 method to be followed for transfer of Jacking load into permanent wall 1.10 complete design analyses of permanent underpinning wall 1.11 updated construction sequence for Phases 3 and 4 1.12 settlement monitoring program to be required during plant operation with action levels and remedial measures identified (Tech. Spec.).
Include RBA EPA and Control Tower 1.13 plans and details for permanently backfilling underpinning excava-tions including compaction specifications for granular fill under FIVP 1.14 prncedure to be required for detecting extent of planar openings uncovered in drift excavations and controls.to minimize their effects.
2.
Provide the following information regarding the Service Water Punp Structure:
2.1 acceptability of 1.5 FSAR SSE versus SSRS as bounding design 2.2 sliding calculation using site-specific response spectra (SSRS) selsnic loads and provide results with basis for assumed soil input parameters 2.3 stress condition for existing parts of structure:
(a) Maximum stresses (b
Critical combinations (c
Identify true critical elements based on actual rebar OFFICE)
~**
suRnme>
..... ~........
. ~ ~ -. - ~ ~ ~
- - ~
omy
.............. ~..
.... ~.. ~.. ~ ~
~ ~ ~ - -. " "
~ ~ ~ " * * " ' ' '
NRC FORM 318 (10-80) NRCMONO OFF1CIAL RECORD COPY um m sai- =
j i
i J
l ENCt.050RE 8 2.4 calculation for determining lateral earth pressures under dynamic loading 2.5 settlenent ronitoring program to be required during plant operation 4
with action levels and remedial measures identified (Tech. Spec.)
l 2.6 as-built report with confirmatory data on underpinning in FSAR upon completion of construction i
2.7 report on crack evaluation to include consideration of the effects of nultiple cracks.
3.
Provide the following information regarding the Borated Water Storage Tanks:
i 3.1 adequacy of governing load combination used in design 3.2 acceptability of 1.5 FSAR SSE versus SSRS as bounding <!esign 3.3 settlement monitoring program to be required during plant operation with action levels and remeaial measures identified (Tech. Spec.)
3.4 as-built report with confirmatory data in FSAR on completed con-struction 4.
Provide the following information regarding underground pipes:
i 4.1 basis for modeling of the piping inside the bt.ilding in the terminal end analyses l
4.2 controls to be required during plant operation to pervent placenent of heavy loads over buried piping and conduits 4.3 as-built report with confirmatory data in FSAR on completed construc-tion 4.4 justification why the BWST lines are not to be rebedded from the tank farm dike to the auxiliary building j
4.5 a list of all penetrations for underground seisaic Category I piping.
Revise and submit your pipe monitoring program to include periodic measurements of rattelspace for plant operating life. Provide justifi-cation for all exceptions.
i 4.7 justification for the high (beyond limits) reported settlement stesses 5.
Provide the following information regarding the Diesel Generator Building:
S.1 astructural reanalysis considering:
(a) Presurcharge conditions (b) Conditions during the surcharge j
(c) 40-year settleoent effects (d) The combined effects of (a) through (c) above 5.2 a structual reanalysis assuming reduction in soil spring stiffnesses between bays 3 and 4 on the south side and beneath adjacent cross wall l
5.3 a statistical evaluation of settlements to evaluate impact of survey inaccuracies versus actual differential settlements which have been i
experienced i
i OF FICE )
i sumur )
DOTE)
.t
] unc ronu ais cio eoi nncu o24o OFFICIAL RECORD COPY u wo.mi-m m
J
_ EfiCLOSURE 8 4
5.4 acceptability of 1.5 X SSE (FSAR) versus SSRS for bounding design 5.5 criteria relating crack width and spacing to reinforcing steel stress 5.6 settlement monitoring program to be required during plant operation with action levels and remedial measures identified (Tech. Spec.)
5.7 evaluation of effect of past and future differential settlements to diesel lines f rom the day tank to the diesels.
1 6.
Provide a settlerent monitoring progran to be required during plant operation with action levels and remedial measures identified (Tech. Spec.) for the underground Diesel Fuel Oil Storage Tanks.
7.
Provide the following information regarding the permanent dewatering systeu:
7.1 results of the dewatering recharge tests 7.2 technical specification requirements on the permanent dewatering system.
7.3 a sumnary dicussion of your contingency plans which would be impleoented in the event groundwater levels at critical locations exceed limits in the technical specifications.
8.
Provide a settlement nonitoring progran to be required for structures founded on natural soils and plant fill which have not been identified above with action levels and remedial neasures identified..(Tech. Spec.)
N l
l 3
orrice >
suaame>
..... ~. ~... - ~.
our>
. -... ~......
-... - ~ ~.. - -
~.-~~~~~