9 APR 011982 APPENDIX A NOTICE OF VIOLATION Carolina Power & Light Company Docket No. 50-261 H. B. Robinson 2 License No. DPR-23 As a result of the inspection conducted on February 11 - March 10,1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),
the following violations were identified.
A.
Technical Specification 4.5.2.6 requires that the refueling water storage tank (RWST) outlet valves shall be tested at each cold shutdown which extends more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> but not more often than once each quarter.
These valves were last tested llay 19, 1981.
Contrary to the above, the plant was placed in the cold shutdown mode for greater than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during August and November,1981, but the RWST outlet valves were not tested.
This is a Severity Level V Violation (Supplement I.E.).
B.
Technical Specification 6.8.1 requires that written procedures be estab-lished and implemented that meet or exceed the requirements and recommenda-tions of Appendix A of USNRC Regulatory Guide 1.33 dated November 3,1972.
This Regulatory Guide requires implimenting adequate procedures for Containment Leak Rate Tests.
Special Procedure-361 was written and approved to conduct the Containment Integrated Leak Rate Test (CILRT), including valve lineups to meet 10 CFR 50 Appendix J test requirements.
Contrary to the above, as of flarch 4,1982, adequate procedures had not been established or implemented for the CILRT, resulting in the nitrogen supply to l
accumulators, regulator (PCV-846), not being shut, the nitrogen supply to accumulators pressure indicator not being removed and the accumulator sample isolation valve (PS-989E) not being open.
These items resulted in about 1080 psig pressure being applied to the nitrogen supply to accumulators containment isolation valve (SI-855), which is contrary to Special Procedure-361, Prerequisite 5.27.
This is a Severity Level V Violation (Supplement I.E.).
t Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will 820 5 28 0N>
L
l Carolina Power & Light Company 2
Docket No. 5!1-261 Notice of Violation License No. DPR-23 be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to exten<!!ng your response time for good cause shown.
Date: APR 011992