ML20053B467
| ML20053B467 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 04/01/1982 |
| From: | Cantrell F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20053B449 | List: |
| References | |
| NUDOCS 8205280429 | |
| Download: ML20053B467 (2) | |
See also: IR 05000438/1982006
Text
-
-
-
-
42H04
APR 011982
Tennessee Valley Authority
ATTN: fir.11. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject:
Report Hos(Q82461nd 50-439/82-06
This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.
of this office on February 1 - liarch 5,1982, of activities authorized by NRC
Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our
preliminary findings were discussed with Mr. R. Dahnke, Project lianager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
'
cation to withhold infonnation contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
htoM
F. S. Cantrell, Acting Chief
Projects Branch 1
Division of Project and
Resident Programs
Enclosures (See Page 2)
8205280 %
-
.
.
'
.
APR 011!M2
Tennessee Valley Authority
2
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-438/82-06
and 50-439/82-06
cc w/ encl:
11. J. Green, Director of fluclear Power
A. M. Qualls, Plant Superintendent
11. R. Dahnke, Project fianager
D. L. Terrill, Project Engineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief Nuclear Safety
Review Staff
bec w/ encl:
NRC Resident Inspector
Document flanagement Branch
State of Alabama
FF, I
R
RII
R
t
c
ejw
DQuick
FCantrel(
JCrlenjak
f//l/82
p//82
y
/82
ff/[/82
.