Forwards IE Insp Repts 50-438/82-06 & 50-439/82-06 on 820201-0305 & Notice of Violation
ML20053B467
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/01/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20053B449 List:
References
NUDOCS 8205280429
Download: ML20053B467 (2)


See also: IR 05000438/1982006

Text

-

-

-

-

42H04

APR 011982

Tennessee Valley Authority

ATTN: fir.11. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject:

Report Hos(Q82461nd 50-439/82-06

This refers to the routine safety inspection conducted by Mr. J. D. Wilcox, Jr.

of this office on February 1 - liarch 5,1982, of activities authorized by NRC

Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our

preliminary findings were discussed with Mr. R. Dahnke, Project lianager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

'

cation to withhold infonnation contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

htoM

F. S. Cantrell, Acting Chief

Projects Branch 1

Division of Project and

Resident Programs

Enclosures (See Page 2)

8205280 %

-

.

.

'

.

APR 011!M2

Tennessee Valley Authority

2

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-438/82-06

and 50-439/82-06

cc w/ encl:

11. J. Green, Director of fluclear Power

A. M. Qualls, Plant Superintendent

11. R. Dahnke, Project fianager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief Nuclear Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

Document flanagement Branch

State of Alabama

FF, I

R

RII

R

t

c

ejw

DQuick

FCantrel(

JCrlenjak

f//l/82

p//82

y

/82

ff/[/82

.