ML20053B419

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-302/82-02.Corrective Actions:Personnel Counseled, Computerized Maint Control Instituted & Daily Printout of Planned Maint Given to Supervisor
ML20053B419
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/30/1982
From: Lutkehaus T, Mardis D
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20053B408 List:
References
3F-0482-43, 3F-482-43, CS-82-096, CS-82-96, NUDOCS 8205280387
Download: ML20053B419 (3)


Text

e 0

0 ry

  • b,

, {U;,

O

' /.i g,

... c,d' ?L k.

r 9

Of ]y

y

' %;,. i

~

Ni

-!~

^

3 g

  • f Aff,

a

  • //

Power

""ApH1'30,1982 CS-82-096

  1. 3F-0482-43 File: 3-0-3-a-2 Mr. J. P. O'Pai!!;, Rt.gtoaal Administrator Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, Ga. 30303

SUBJECT:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 IE Inspection Report 82-02

Dear Mr. O'Reilly:

We offer the following response to the violation listed in the subject inspection report.

NOTICE OF VIOLATION Technical Specification 6.8.1 requires adherence to procedures covering applicable activities recommended in Appendix "A" of Regulatory Guide 1.33, November,1972.

Regulatory Guide 1.33, Section 1.5 requires procedures for the control of maintenance which includes a method of obtaining permission for work to be accomplished and a method for logging such work.

Compliance Procedure CP-ll3, Procedure for Handling and Controlling Work Requests, Revision 29, Section 5, requires Parts I, II, and the Nuclear Shift Supervisor's work authorization signature of Part III to be completed prior to commencing work.

Contrary to the above, review of records on February 1,1982, indicates that work conducted during the period of November 16-26, 1981 in accordance with work request #24403 and modification 81-5-20, was conducted without prior Nuclear Shift Supervisor authorization.

Also, contrary to the above, on February 4, 1982, maintenance was conducted on the Reactor Building pressure transmitter (BS-16-PT) prior to Part II and the Nuclear Shif t Supervisor's authorization in Part III being completed.

This is a Severity Level IV Violation (Supplement D.3.).

8205280 %

General Office 3201 Th6rty-fourth Street South e P O Box 14042. St Petersburg. Fionda 33733 813-866-5151

O 9

Notice of Violation Response 50-302/82-02 USNRC Page Response:

Florida Power Corporation concurs with the stated violation, and offers this response:

- Responsible personnel have been individually counseled as to seriousness of this violation, and a letter has been forwarded to all concerned personnel re-emphasizing the importance of adhering to procedures, and notifying disciplinary action will be taken should a like event recur.

Florida Power Corporation is concerned over the management control systems that permitted this violation to occur, and the following additional actions have been taken to improve the effectiveness of our management control systems:

A computerized control of maintenance planning by work request number has been instituted, and a daily printout of all planned maintenance is given to the Shift Supervisor on duty.

- The Operation's Planning Coordinator has been given the responsibility of ensuring the NSSOD is notified of any changes or additions to the printout.

We feel that this daily update of maintenance already in progress, and maintenance to be performed, will enhance our management controls systems to ensure that violations of this type will not recur.

Should there be further questions, please contact us.

Very truly yours, (UBd6 /T rP T. C. Lutkehaus i

Nuclear Plant Manager l

l l

l A<

i DaMd G. Mardis l

Acting Manager, 1

Nuclear Licensing i

l EWF/ mig l

l

i l

STATE OF FLORIDA COUNTY OF PINELLAS D. G. Mardis states that he is the Acting Manager, Nuclear Licensing, of Florida Power Corporation; that he is authorized on the part of said t

j company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

E$

]

D. G. Mardis' Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 30th day of April,1982.

i i

\\

ftMf(

b

  1. 1 $

I N6tarf Public Notary Public, State of Florida at Large, My Commission Expires: May 29,1984 i

~ _.,. -. _.... _, _ _ _., -. -....

m

-