APPENDIX A f0TICE OF VIOLATION j
Georgia Power Company Docket No. 50-321 Hatch Unit 1 License No. OPR-57 As a result of the inspection conducted on March 10-12, 1982, and in accordance with the Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified.
Technical Specification Section 6.8.1.f requires written procedures to be established, implemented and maintained covering the fire protection program implementation.
1.
Georgia Power Company Procedure HNP-555, Control of Ignition Sources, Section E.4 requires a " hot work permit" to be issued for each welding job at one location. During normal plant operation the permit shall be valid for one working shif t.
Contrary to the above, on March 12, 1982, with Unit 1 in operation, three welding permits were found in Unit I which were issued for more than one shift.
One permit in the reactor building and one in the cor trol building were issued on February 2 and h bruary 8,1982 for the duration of the jobs and one permit in the reactor building was issued on March 9,1982 to be effective for 11 days.
2.
Georgia Power Company Procedure HNP-559, Control of Transient Combust-ibles, Section F requires the Senior Regulatory Specialist at Hatch to review a :1 storage and proposed storage of combustible materials in safety related areas to determine if the storage will be acceptable, what additional fire protection features may be required and post an approved storage permit in the storage area.
Contrary to the above, on March 12, 1982, the Unit I reactor building HVAC equipment room contained an accumulation of combustible material consisting of contaminated filters, new filters, cardboard boxes, and miscellaneous debris which had not been reviewed by the Senior Regu-latory Specialist and a storage permit had not been issued.
This material had apparently been stored in this room for several months.
This is a Severity Level V Violation.
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps O2052803Ll4
Georgia Power Company 2
Docket No. 50-321 Hatch linit 1 License ho. DPR-57 which have been taken and the results achioved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.