ML20053B370
| ML20053B370 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/30/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20053B360 | List: |
| References | |
| NUDOCS 8205280342 | |
| Download: ML20053B370 (2) | |
See also: IR 05000321/1982010
Text
_ _ _
_ ___ _ ___ _ _ ____- _ -_ - _ _ _ _ _ _ _ _ _ .
_____
_ _ - _ _ _
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l
,
.
,
c
!
4
i
i
i
NAR 3 01982
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
l
Atlanta, GA 30302
.
Gentlemen:
'
1
l
Subject:
Report Nos. 50-321/82-10 and 50-366/82-10
This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr.,
of this office on March 10-12, 1982, of activities authorized by NRC Operating
License No. DPR-57 and License No. NPF-5 for the Hatch facility. Our preliminary
,
!
findings were discussed with Mr. T. V. Green, Assistant Plant Manager, at the-
conclusion of the inspection.
Areas examined during this inspection included the plant's fire protection
program. Within these areas, the inspection consisted of selective examinations
!
of procedures and representative records, interviews with personnel, and
i
observations by the inspector.
!
During the inspection, it was found that certain activities under your license
!
appear to violate NRC requirements.
These items and references to pertinent
!'
requirements are listed in the Notice of Violation enclosed herewith as
l
Appendix A.
Elements to be included in your response are delineated in
'
i
Appendix A.
!
l
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures 'will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
,
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
820528 M
. . _ . . - . -
...
..
- .
.
. . - -
_
. _ - -
. _ .
.-
_
,
.
.
,
.
a
Georgia Power Company
2
MAR 3 0 582
~
,
i
Should you have any questions concerning this letter, we will be glad to discuss
i
them with you.
t
Sincerely,
m/
!
F. J. Long, Acting Chief
j
Reactor Projects Branch 2
i
Division of Project and
i
Resident Programs
4
Enclosures:
1.
Appendix A, Notice of Violation
j
2.
Inspection Report Nos. 50-321/82-10
i
and 50-366/82-10
,
cc w/ enc 1:
i
J. T. Beckham, Vice President and
)
General Manager-Nuclear Generation
t
i
M. Manry, Plant Manager
j
C. E. Belflower, Site QA Supervisor
!
bcc w/ enc 1:
NRC Resident Inspector
'
.
Hugh S. Jordan, Executive Secretary
'
Document Management Branch
State of Georgia
t
!
'
,
I
!
!
!,
!
RII Y
RII
RII
RII
RII
,
WHM/@ller:ht
00h
\\ld
W
TEConlon
ARHerdt
VBrbwnlee
FJLong
!
i
3/J/82
3J(/82
3/p'/82
3/y\\/82
3#f/82
i
i
t
- . .
- _ - - -
. . - . -
.
- _ - -
-
- - - - - -
- - - - .
---
-
---