ML20053B367

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/82-11,50-401/82-11, 50-402/82-02 & 50-403/82-01 on 820413-16.No Noncompliance Noted
ML20053B367
Person / Time
Site: Harris  
Issue date: 05/06/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20053B368 List:
References
NUDOCS 8205280338
Download: ML20053B367 (2)


See also: IR 05000400/1982011

Text

-

,-

[

'

MAY - 61982

Carolina Power and Light Company

ATTN:

Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Of ficer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject:

Report Nos. 50-400/82-11, 50-401/82-11, 50-402/82-02 and 50-403/82-01

-

<

This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of

this office on April 13-16, 1982, of activities authorized by NRC Construction

Permi t Nos. CPPR-158, CPPR-159, CPPR-160 and CPPR-161 for the Shearon Harris

facility and to the discussion of our findings held with Mr. R. M. Parsons,

Project General Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold informatio:, contained thereir. within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

8205280338 @

TEo(3

  • /

E

D

.

.

.

~

Carolina Power and Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 1

'

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-400/S2-11,

50-401/82-11, 50-402/82-02 and 50-403/82-01

cc w/ encl:

R. M. Parsons, Project General Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of North Carolina

.

.

g

.

g

h

', JAR erdt

C

FJ Long

WPKleinsorge:ht

J Coley

5/G /82

5/G /S2

k 5/f/S2

5/E /82

5/ 2./82