Text
[
y
M 21 1932
Mississippi Power and Light Company
ATTN: Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report No. 50-416/82-29
This refers to the routine safety inspection conducted by Mr. A. H. Johnson of
this office on April 6-9, 1982, of activities authorized by NRC Construction
Permit No. CPPR-118 for the Grand Gulf facility and to the discussion of our
findings held with Mr. C. K. McCoy, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written applica-
tion to withhold information contained therein within thirty days of the date of
this letter. Such application must be consistent with the requirements of 10 CFR 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosure:
(See Page 2)
8205280
&
Tech)
k
-
,
.
.
p'c . , ,
".'
-
' "
Mississippi Power and
2
Light Company
Enclosure:
Inspection Report No. 50-416/82-29
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCcy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
i
RII
RII
RII ,7
RII
-
II
(f
(}V
f tcher
4'bf
AHJdrMson:aw
FJape
ARHerdt
RBu
JLony
l
04/R&82
04/ V82
04/ 0 /82
04ff82
04g82
/
i