Text
<;fC//OW
V.
=
!
-
,
.
APR 2 91982
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject:
Report Nos. 50-400/82-12 and 50-401/82-12
N
This refers to the routine safety inspection conducted by Mr. J. J. Lenahan of
this office on April 6-9,
1982, of activities authorized by NRC Construction
Permit Nos. CPPR-158 and CPPR-159 for the Shearon Harris facility and to the
discussion of our findings held with Mr. R. M. Parsons, Project General Manager,
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the-
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosure:
See Page 2
820 5 280 Sc73 q
TEolgf
.
.
i
.
Carolina Power and Light Company
2
liPR 2 91982
Enclosure:
Inspection Report Nos. 50-400/82-12
and 50-401/82-12
cc w/ encl:
R. Parsons, Site Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
JJ)Lenahan:ht
60y
rig / 'f
7m
RII
RI
RII
- JZ
RII
){
s
TECon on
ARHerdt c e
4'eue
CJulian
FJLonj
/
2
4/zr/82
4/g p/82
4/)%/82
v/
re
4:1}/82
4/ (82