Forwards IE Insp Rept 50-404/82-08 on 820413-16.No Noncompliance Noted
ML20053B234
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/29/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20053B235 List:
References
NUDOCS 8205280205
Download: ML20053B234 (2)


See also: IR 05000404/1982008

Text

m ffnv

.

'f

.

w

APR 2 9 1982

Virginia Electric and Power Company

ATTN:

Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Subject:

Report No. 50-404/82-08

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

thi s of fice on April 13-16, 1982, of activities authorized by NRC Construction

Permit No. CPPR-114 for the North Anna facility and to the discussion of our

findings held with Mr. F. K. Moore, Project Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad ta discuss

them with you.

Sincerely,

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

820 s 28 0 ssq

iGo/ ;);

.

..

.

Virginia Electric and Power Company

2

Enclosure:

Inspection Report No. 50-404/82-08

cc w/ encl:

P. G. Godwin, Director, Nuclear Security

J. H. Ferguson, Executive

Vice President

W. R. Cartwright, Station Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

Commonwealth of Virginia

!

l

!

RII

RII

?

s

RI'

RIIo

JRka[rris:ht

'

RII

,f h

Q\\V,

[4h

-

TECon on

ARHerdt

n endis

HCDance

3

4/TV82

4/({ /82

4/gt,/82

4f/82

44p/82

l

,

t

,