Text
m ffnv
.
'f
.
w
APR 2 9 1982
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
Subject:
Report No. 50-404/82-08
This refers to the routine safety inspection conducted by Mr. J. R. Harris of
thi s of fice on April 13-16, 1982, of activities authorized by NRC Construction
Permit No. CPPR-114 for the North Anna facility and to the discussion of our
findings held with Mr. F. K. Moore, Project Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad ta discuss
them with you.
Sincerely,
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
See Page 2
820 s 28 0 ssq
iGo/ ;);
.
..
.
Virginia Electric and Power Company
2
Enclosure:
Inspection Report No. 50-404/82-08
cc w/ encl:
P. G. Godwin, Director, Nuclear Security
J. H. Ferguson, Executive
Vice President
W. R. Cartwright, Station Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
Commonwealth of Virginia
!
l
!
RII
RII
?
s
RI'
RIIo
JRka[rris:ht
'
RII
,f h
Q\\V,
[4h
-
TECon on
ARHerdt
n endis
HCDance
3
4/TV82
4/({ /82
4/gt,/82
4f/82
44p/82
l
,
t
,