Text
'
';
%.
'O b* U
_
~,
APR 3 01982
.
Mississippi Power and Light Company
ATTN: P;
N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject:
Report No. 50-416/82-31
This refers to the routine safety inspection conducted by Mr. M. D. Hunt of this
office on April 13-15, 1982, of activities author zed by NRC Construction Permit
i
No. CPPR-118 for the Grand Gulf facility and to the discussion of our findings
held with Mr. C. K. McCoy, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
- thin the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this ihspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days-of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
F. J. Long, Acting Chief
,
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosure:
See Page 2
l o" O
8z0 5 280
,a
~1~ Eol s)
____
_ _________ __ ___ ___________ _______ ___________________ __________________________ __________
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
',
.
Mississippi Power and Light Company
2
Apg 3p ggj
Enclosure:
Inspection Report No. 50-416/82-31
cc w/ enc 1:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
l
I
,
i
1
l
RII
RII
RII
RII
RI
.
l
MM
-
'
MDHur t:ht
FJap
ARHerdt
RC tcher
FJLong
,
/82
4g
1
4/d/82
4/fl'82
4A//82
1