ML20053B154

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/82-13 & 50-401/82-13 on 820320-0420.No Noncompliance Noted
ML20053B154
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/30/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20053B155 List:
References
NUDOCS 8205280123
Download: ML20053B154 (2)


See also: IR 05000400/1982013

Text

- . . _

-

__

.

.

-

_-

_-

.

  • o

',

APh 2 0 G32

k! Ld

6

Carolina Power and Light Company

ATTil: Mr. J. A. Jones, Senior Executive

.

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, fiC 27602

Gentlemen:

Subject:

Report flos. 50-400/82-13 and 50-401/82-13

This refers to the routine safety inspection conducted by Mr. G. F. Itaxwell of

this office on 11 arch 20 - April 20,1982, of activitics authorized by fiRC

Construction Pemit tios. CPPR-158 and CPPR-159 for the Shearon Harris facility

and to the discussion of our findings held with !!r. R.11. Parsons, Project

General flanager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective exa;ninations of procedures and representative records, interviews with

i

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the fiRC's Public Document Room unlest you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

F. J. Long, Acting Chief

Reactor Project Branch 1

D1 vision of Project and

Resident Programs

l

'

Enclosure:

Inspection Report tios. 50-400/82-13

and 50-401/82-13

cc w/ enc 1:

R. ft. Parsons, Project General Manager

8205280jgg

L

_.

__.

.. .

-

.

-

N#h

.

'O

,

.

Carolina Power & Light Company

2

ApH 3 0 1982

bcc w/ encl:

flRC Resident Inspector

Document flanagement Branch

State of florth Carolina

1

i

.

f

Ch ian

__

rger

F aqg

!

GitaxWe

dt

4/M/82

4/30/82

4/30/82

4/g/82

l