Informs of Acceptability of Proposed Operating Program at 75% Power for Period of 30 Days.Immediate Notification Required in Event of Indication of Steam Generator Tube Behavior Contrary to 820428 Submittal
ML20053B023
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/20/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Parker W
DUKE POWER CO.
References
NUDOCS 8205270626
Download: ML20053B023 (1)


Text

N

%w

\\

DISTRIBUTION:

/

/

f Docket Nos.750 59/370 1

LB #4 r/f DEisenhut/RPurple 4

MAY 2 01982 EAdensam bcc: TERA Docket Nos: 50-369 RBirkel NRC PDR and 50-370 MDuncan Local PDR SHanauer NSIC RTedesco TIC Hr. William O. Parker, Jr.

ZRosztoczy ACRS (16)

Vice President - Steam Production RVollmer Duke Power Corpany JKramer D

P.O. Bux 2178 RMattson a

4 422 South Church Street RHartfield, MPA

c, OIE A

g

Dear Mr. Parker:

{w 2/Sgg {9 r.

Subject:

Continued Operation of Unit 1, May - July 1982 r

(McGuire Nuclear Station Units 1 and 2)

Q,,

  1. ~,

g' By letter dated April 1,1982, we informed you that operation of McGuire utilizing the Model D stean generators, on an interim basis at 50% power was acceptable until a demonstrable technical basis is provided to support interim operation at power levels greater than 50%.

Your letters dated April 28 and April 30, 1982, described and discussed a pro-posed operating program for a period extending to July 1982 including short term operation at 75% power. As a result of our review of the information provided, we conclude and find acceptable your McGuire 1 operating program for a period extending from May to July 4,1982, including operation at 75% power for a 3

maximum of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> (30 days).

We require that the staff be imediately notified in the event there is any indication of steam generator tube behavior contrary to the information which was provided in your April 28, 1982, submittal. Subsequent to the approved period of operation ending on July 4,1982, and as indicated in your request, an eddy current test, shall be perforned on the first three rows of tubes in each steam generatorgand the results reported to NRR. A summary of the results of our review is presented in the enclosure.

'/

-t Sincerely,

y. +;W " ^_,,

je 'Q#

j

,l g,

i pe p h t#

Ro ert L. Tedesco, Assistant Director for Licensing f

Division of Licensing

Enclosure:

As stated ADICSE AgSf

L 8205270Gploa rwy,-.

ouGas I

arMa tY W #61rt-s/9/82

\\

5/R/82

..DL.:LB..f4.D...LA.:Dg.J.C

[#.4....gg..

..A Q$[f[.,.

. 0R.% y ornce>

..p suaune >..R B,i r,k,e,]ih,mc,,,MD,un,c,an,,,,,,,,,,,,,E,,,,,,,s,a,m Et M$.

RBosnak.g

..W ohns1on...

...T.1..a].ita.

om>. 5/13/#,2,,,,,,,,,,,5 /,],,*,l/#2,,,,,,,,,,,,,5,/,p,{,g,2,,,,

,,,5,4q,,,,,,,,,,,,.. 51gg,8,2,.

.5G,y,82,,,

5/3/,82,,,,

0FFIClAL RECDRD COPY usom i.u-a ea NRC FORM 318 (10-80) NRCM 0240

, _ _