Forwards IE Emergency Preparedness Appraisal Rept 50-416/82-03 on 820105-08 & Notice of Deficiencies.List of Emergency Preparedness Deficiencies & Improvement Items Encl
ML20053A866
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/10/1982
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20053A867 List:
References
RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8205270371
Download: ML20053A866 (5)


See also: IR 05000416/1982003

Text

,

'.

,

,

YELLOW

l

MAR 1 " A82

Docket No. 50-416

Mississippi Power and Light Company

Attn: Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, Mississippi 39205

Gentler.cn:

Subject:

Emergency Preparedness Appraisal

To verify that licensees have attained an edequate state of onsite emergency

preparedness, the Office of Inspection and Enforcement is conducting special

appraisals of the emergency preparedness programs at each power reactor site.

These appraisals are being perfomed in lieu of certain routine inspections

normally conducted in the area of emergency preparedness. The objectives of the

appraisal at each facility are to evaluate the overall adequacy and effectiveness

of emergency preparedness and to identify areas of weakness that need to be

strengthened. We will use the findings from these appraisals as a basis not only

for requesting individual applicant and licensee action to correct deficiencies

and effect improvements, but also for effecting improvements in NRC requirements

and guidance.

During the period of January 5-8, 1982, the NRC conducted a special appraisal of

the emergency preparedness program at the Grand Gulf Nuclear Station. Areas

examined during this appraisal are described in the enclosed report (50-416/

82-03). Within these areas the appraisal team reviewed selected procedures and

representative records, inspected emergency facilities and equipment, and

interviewed personnel.

The findings of this emergency preparedness appraisal indicate that certain

deficiencies exist in your emergency preparedness program. These are addressed in

Appendix A, " Emergency Preparedness Deficiencies."

Further review of this emergency preparedness appraisal also indicates that there

are other areas that should be evaluated and considered for improvement in your

emergency preparedness program. These areas are discussed in Appendix B,

" Preparedness Improvement Items."

Several areas in your emergency preparedness program were not complete at the

time of this appraisal and, therefore, were not evaluated. These areas are

listed in Appendix C.

These will be examined upon complete implementation of the

areas invcived.

,8205270 T7/

TEolz/L

.

.

-

.

.

Mississippi Power and Light Company

2

This is to inform you that the incomplete areas identified in Appendix C and the

findings of Appendix A must be adequately addressed prior to issuance of an

operating license and will be examined during a follow-up appraisal.

Conse-

quently, no response to this letter is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this of fice, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this appraisal, we will be pleased to

discuss them with you.

Sincerely,

James P. O'Reilly

Regional Administrator

Enclosures:

1.

Appendix A, Emergency Preparedness

Deficiencies

2.

Appendix B, F eparedness Improvement

Items

3.

Appendix C, Preparedness Areas

Pending Applicant Completion

4.

Of fice of Inspection and Enforcement

Inspection Report No. 50-416/82-03

cc/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

b

RII)

Eds

RI

RII

R

I

RII

1

N

CRFcalland:ejw

b ardin

G enkins

R

sis

JPS hr

3/$ /82

3/$ /82

3/5'/82

3.

'82

3/ 3/82

e

.

.

,

,

APPENDIX A

EMERGENCY PREPAREDNESS DEFICIENCIES

Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station

Emergency Preparedness Program, conducted January 5-8, 1982, the following

deficiency was identified (Reference is to Section in OIE Report No. 50-416/82-03

and the related standard of 10 CFR 50.47):

Augmentation of Onsite Emergency Organization (Section 2.2; 50.47(b)(2)):

The onsite staff augmentation of the initial emergency response

capability does not meet the specific staffing recommendations

expressed in NUREG-0654, Table B-1, and an acceptable alternative

has not been provided.

.

r-

r

.

.

.

APPEN0IX B

PREPARE 0 NESS IMPROVEMENT ITEMS

Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station

Emergency Preparedness Program conducted January 5-8, 1982, the following items

should be considered for improvement.

(Reference is to Section in OIE Report

No. 50-416/82-03).

1.

Appointing an emergency planning coordinator at the site.

This individual

should have an input to routine coordinating events such as budget meetings,

plant safety review committee meetings, etc. (1.0)

2.

Revising EPP 10-S-01-12 to contain the stability classification based on

the standard deviation of wind direction fluctuations. (4.2.1.4)

l

e

,

-

_ - .

. =_-

-

-. - - -.

..

-

. . ,

,

,

APPENDIX C

PREPAREDNESS AREAS PENDING APPLICANT COMPLETION

Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station

Emergency PreparMness Program conducted January 5-8, 1982, the following areas

were, at the time of the appraisal, incomplete with respect to development or

implementation and, therefore, findings related to the adequacy of these areas

could not be made. (References are to Sections in OIE Report No. 50-416/82-03).

1.

Onsite Emergency Organization (2.1)

2.

Emergency Plan Training / Retraining Program established (3.1)

3.

Emergency Plan Training / Retraining Program implemented (3.2)

4.

Control Room (4.1.1.1)

5.

Technical Support Center (4.1.1.2)

6.

Operational Support Center (4.1.1.3)

7.

Interim Emergency Operations Facility (4.1.1.4)

8.

Post-accident primary coolant sampling and analysis (4.1.1.5)

9.

Post-accident containment air sampling and analysis (4.1.1.6)

10.

Post-accident gas and particulate effluent sampling and

analysis (4.1.1.7)

11.

Post-accident liquid effluent sampling and analysis (4.1.1.8)

12. Offsite laboratories (4.1.1.9)

13.

Assembly / reassembly areas (4.1.2.1)

14.

Medical treatment area (4.1.2.2)

15.

Decontamination facilities (4.1.2.3)

16.

Expanded support facility (4.1.3)

17.

Emergency news centers (4.1.4)

18.

Emergency kits and emergency survey instrumentation (4.2.1.1)

19. Area and process radiation monitors (4.2.1.2)

20.

Non-radiation process monitors (4.2.1.3)

21.

Respiratory protection (4.2.2.1)

!

22.

Protective clothing (4.2.2.2)

23.

Emergency communications equipment (4.2.3)

l

24.

Corrective action equipment (4.2.4)

25.

Reserves (4.2.5)

26.

Emergency transportation equipment (4.2.6)

27. Emergency procedures; general form and content (5.1)

28.

Emergency alarm and abnormal occurrence procedures (5.2)

29.

Implementing instructions (5.3)

l

.

30.

Implementing procedures (5.4)

31.

Supplementary procedures (5.5)

32.

Coordination with general public (6.2)

33.

Coordination with news media (6.3)

,

34.

Walk-through observations (7.2)