ML20053A866
| ML20053A866 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/10/1982 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20053A867 | List: |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 NUDOCS 8205270371 | |
| Download: ML20053A866 (5) | |
See also: IR 05000416/1982003
Text
- ,
'.
,
,
YELLOW
l
MAR 1 " A82
Docket No. 50-416
Mississippi Power and Light Company
Attn: Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, Mississippi 39205
Gentler.cn:
Subject:
Emergency Preparedness Appraisal
To verify that licensees have attained an edequate state of onsite emergency
preparedness, the Office of Inspection and Enforcement is conducting special
appraisals of the emergency preparedness programs at each power reactor site.
These appraisals are being perfomed in lieu of certain routine inspections
normally conducted in the area of emergency preparedness. The objectives of the
appraisal at each facility are to evaluate the overall adequacy and effectiveness
of emergency preparedness and to identify areas of weakness that need to be
strengthened. We will use the findings from these appraisals as a basis not only
for requesting individual applicant and licensee action to correct deficiencies
and effect improvements, but also for effecting improvements in NRC requirements
and guidance.
During the period of January 5-8, 1982, the NRC conducted a special appraisal of
the emergency preparedness program at the Grand Gulf Nuclear Station. Areas
examined during this appraisal are described in the enclosed report (50-416/
82-03). Within these areas the appraisal team reviewed selected procedures and
representative records, inspected emergency facilities and equipment, and
interviewed personnel.
The findings of this emergency preparedness appraisal indicate that certain
deficiencies exist in your emergency preparedness program. These are addressed in
Appendix A, " Emergency Preparedness Deficiencies."
Further review of this emergency preparedness appraisal also indicates that there
are other areas that should be evaluated and considered for improvement in your
emergency preparedness program. These areas are discussed in Appendix B,
" Preparedness Improvement Items."
Several areas in your emergency preparedness program were not complete at the
time of this appraisal and, therefore, were not evaluated. These areas are
listed in Appendix C.
These will be examined upon complete implementation of the
areas invcived.
,8205270 T7/
TEolz/L
.
.
-
.
.
Mississippi Power and Light Company
2
This is to inform you that the incomplete areas identified in Appendix C and the
findings of Appendix A must be adequately addressed prior to issuance of an
operating license and will be examined during a follow-up appraisal.
Conse-
quently, no response to this letter is required.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this of fice, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this appraisal, we will be pleased to
discuss them with you.
Sincerely,
James P. O'Reilly
Regional Administrator
Enclosures:
1.
Appendix A, Emergency Preparedness
Deficiencies
2.
Appendix B, F eparedness Improvement
Items
3.
Appendix C, Preparedness Areas
Pending Applicant Completion
4.
Of fice of Inspection and Enforcement
Inspection Report No. 50-416/82-03
cc/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
b
RII)
Eds
RI
RII
R
I
RII
1
N
CRFcalland:ejw
b ardin
G enkins
R
sis
JPS hr
3/$ /82
3/$ /82
3/5'/82
3.
'82
3/ 3/82
e
.
.
,
,
APPENDIX A
EMERGENCY PREPAREDNESS DEFICIENCIES
Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station
Emergency Preparedness Program, conducted January 5-8, 1982, the following
deficiency was identified (Reference is to Section in OIE Report No. 50-416/82-03
and the related standard of 10 CFR 50.47):
Augmentation of Onsite Emergency Organization (Section 2.2; 50.47(b)(2)):
The onsite staff augmentation of the initial emergency response
capability does not meet the specific staffing recommendations
expressed in NUREG-0654, Table B-1, and an acceptable alternative
has not been provided.
.
r-
r
.
.
.
APPEN0IX B
PREPARE 0 NESS IMPROVEMENT ITEMS
Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station
Emergency Preparedness Program conducted January 5-8, 1982, the following items
should be considered for improvement.
(Reference is to Section in OIE Report
No. 50-416/82-03).
1.
Appointing an emergency planning coordinator at the site.
This individual
should have an input to routine coordinating events such as budget meetings,
plant safety review committee meetings, etc. (1.0)
2.
Revising EPP 10-S-01-12 to contain the stability classification based on
the standard deviation of wind direction fluctuations. (4.2.1.4)
l
e
,
-
_ - .
. =_-
-
-. - - -.
..
-
. . ,
,
,
APPENDIX C
PREPAREDNESS AREAS PENDING APPLICANT COMPLETION
Based on the results of the NRC's appraisal of the Grand Gulf Nuclear Station
Emergency PreparMness Program conducted January 5-8, 1982, the following areas
were, at the time of the appraisal, incomplete with respect to development or
implementation and, therefore, findings related to the adequacy of these areas
could not be made. (References are to Sections in OIE Report No. 50-416/82-03).
1.
Onsite Emergency Organization (2.1)
2.
Emergency Plan Training / Retraining Program established (3.1)
3.
Emergency Plan Training / Retraining Program implemented (3.2)
4.
Control Room (4.1.1.1)
5.
Technical Support Center (4.1.1.2)
6.
Operational Support Center (4.1.1.3)
7.
Interim Emergency Operations Facility (4.1.1.4)
8.
Post-accident primary coolant sampling and analysis (4.1.1.5)
9.
Post-accident containment air sampling and analysis (4.1.1.6)
10.
Post-accident gas and particulate effluent sampling and
analysis (4.1.1.7)
11.
Post-accident liquid effluent sampling and analysis (4.1.1.8)
12. Offsite laboratories (4.1.1.9)
13.
Assembly / reassembly areas (4.1.2.1)
14.
Medical treatment area (4.1.2.2)
15.
Decontamination facilities (4.1.2.3)
16.
Expanded support facility (4.1.3)
17.
Emergency news centers (4.1.4)
18.
Emergency kits and emergency survey instrumentation (4.2.1.1)
19. Area and process radiation monitors (4.2.1.2)
20.
Non-radiation process monitors (4.2.1.3)
21.
Respiratory protection (4.2.2.1)
!
22.
Protective clothing (4.2.2.2)
23.
Emergency communications equipment (4.2.3)
l
24.
Corrective action equipment (4.2.4)
25.
Reserves (4.2.5)
26.
Emergency transportation equipment (4.2.6)
27. Emergency procedures; general form and content (5.1)
28.
Emergency alarm and abnormal occurrence procedures (5.2)
29.
Implementing instructions (5.3)
l
.
30.
Implementing procedures (5.4)
31.
Supplementary procedures (5.5)
32.
Coordination with general public (6.2)
33.
Coordination with news media (6.3)
,
34.
Walk-through observations (7.2)
i
i
- - - -
.-
- - - - - .
.- _ .- -_
_
. _ .
_
.
. -
-