APPENDIX A NOTICE OF VIOLATION Georgia Power Company Docket No. 50-321 Ha tch 1 License No. DPR-57 As a result of the inspection conducted on llarch 2-20, 1982, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.

Technical Specification 6.8.1 requires that procedures controllba the operation of safety-related systems be implemented.

Plant Procedure HNP-1-1117, RHR Service Water, Data Package 1, requires that the motor cooling water shutoff valves be locked open and the status of the valves be double verified.

Contrary to the above, on liarch 1,1932, the motor cooling water inlet valve for "A" Residual Heat Removal (RHR) Service Water Pump was found by the inspector not locked open as required by the HNP-1-1117 procedure (The valve was later detennined to be open).

This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affinnation.

Date:

0 g20527