ML20053A850

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-335/82-03 on 820216-19 & Notice of Violation
ML20053A850
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/26/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20053A842 List:
References
NUDOCS 8205270352
Download: ML20053A850 (2)


See also: IR 05000335/1982003

Text

.

._

-

.-

.

_-_ .

-.- .-

-

_ - -

- .

_

-.

- - - _ _

_

-

. .

.

.

f

!

l

4

I

MAR 2 61982

i

!

Florida Power and Light Company

'

ATTN:

Dr. R. E. Uhrig, Vice President

l

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

i

Gentlemen:

I

Subject:

Report No. 50-335/82-03

i

This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,

P. E. Fredrickson, and P. H. Skinner of this office on February 16-19, 1982, of

!

activities authorized by NRC Operating License No. DPR-67 for the St. Lucie

i

facility. Our preliminary findings we*e discussed with Mr. C. M. Wethy, Plant

!

Manager, at the conclusion of the inspection.

i

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selectiva examinations of procedures and representative records, . interviews with

personnel, and observations by the inspectors.

4

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

'.

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

}

Appendix A.

We have examined actions you have taken with regard to previously identified

I

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

j

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

i

2.790(b)(1).

i

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

,

i

l

<

.

,8205270 3 @

i

-

- - - - - . - - - -

- - . .

.

.-

---

,

,

Florida Power and Light Company

2

M 2 61982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-335/82-03

cc w/ encl:

C. M. Wethy, Plant Manager

N. Weems, Assistant QA

Construction Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florida

RII

RII

RII

RII -

RI

p//Y

lfdf./W

h

L

(ABABe,/82

lisle:ht

CMUpright

ARHerdt

KLa

is

FJ cyg

3pj,

3f[/82

3/ji/82

3/pp'82

3fb/82

.-

-

.