Forwards IE Insp Rept 50-333/82-08 on 820401-30 & Notice of Violation
ML20053A756
Person / Time
Site: FitzPatrick 
Issue date: 05/14/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20053A757 List:
References
NUDOCS 8205270252
Download: ML20053A756 (3)


See also: IR 05000333/1982008

Text

I

.

.

W 1 4 Ga2

i

Docket No. 50-333

l

l

Pouer Authority of the State of !!cw York

Jares A. FitzPatrick !;uclear Pcter Plant

'

ATTi;: !!r. Corbin A. 'icticill, Jr.

l

Resident l'anager

P. O. Box 41

Lycoming,fiew York

13093

Gentlenen:

Subject:

Inspection 50-333/82-08

__

-

This refers to the routine, safety inspection conducted by ?!r. J. Linville of

l

this office on April 1-30, 1982, at the J. A. Fit: Patrick I4uelear Power Plant,

Scriba, ficu York of activities authorized by !;RC License lio. CPR-59 and to the

discussions of our findinas held by Mr. Linville with yourself and ether members

l

!

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

l

l

Report which is enclosed with this letter.

Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

,

I

Our inspector also verified the steps you had taken to correct violations A and

C brought to your attention in a letter dated May 16, 1980 and violation C brought

to your attention in a letter dated liovember 6, 1931. We have no further questions

regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with HRC requirements as set forth in the

flotice of Violation, enclosed hercuith as Appendix A.

This violation has been

categorized by severity level in accordance vith the f!RC Enforcement policy,

(10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987)

dated March 9, 1932. You are required to respond to this letter and in preparing

r

l

your response, you should follow the instructions in Appendix A.

!

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of !!anagement and Budget as required by

l

!l

the Papentork Reduction Act of 1980, PL 95-511.

H{L

[,

RI:DPRP:JCL

RI:DPRP:LTD

RI:DPRP:hBK

RI:DPRP:EJB y-

f;q%L

y[qk

f

!

JWA

JWA

05/06/82

05/06/82

b

l

0FFICIAL RECORD COPY

f

820 s n o gs

-

q

Q

-

-

..

-

..

-

.

W

.

4

Te'cr Authority of the State

2

t/Ay I 4 1982

of 11cu York

The item in the Sotice of Violation enclosed with this letter was identified

during previous inspections of your licensed activities on January 26-30, 1961,

and was documented in the enclosure to our letter dated l' arch 25, 1931. Your

letters to this office dated April 20,1981, May 29,1981, Septer.ber 30, 1981,

and January 13, 1932 stated that a r.eans for controlling as-built drawings

Fron our April 1-30, 1932 inspection it appears that

veuld be irclemented.

the stated corrective actions were not inplem nted since this iter has recurred.

Pecurrent and uncorrccted violations are civen additional weight in the consid-

creticn and selection of appropriate enfercenent action.

Therefore, in your

response to this letter, vou should give particular attention to those actions

taken or planned to cnsure that identified violations will be ccr pletely

corrected and will not recur.

In accordance with 10 CFR 2.790(a), a copy of this letter and the encicsures

will be placed in the I;RC Public Doctnant Poon unless you notify this office,

by telephone, within ten days of the date of this letter and subnit uritten

application to withhold information contained therein within thirty days of

the date of this letter. Such application Eust be consistent with the

requirenents of 2.790(b)(1). The telephone notification of your intent to

renuest withholding, or any reruest for an extension of the 10 day period

' hich vou believe necessary, should be rade to the Suncrvisor, Files, " ail

and "ecords, l'S4C Degion I, at (215) 337-E223.

Your coveration with us in this ratter is e reciatnd.

Sincerely,

N. A M

ichard II. Starostecki, Director,

Division of Project and Resident

Programs

Enclosures:

l

1.

Aprendix A, i;otice of Violation

2.

i:oC Region I Inspection Report

Number 53-333/82-03

cc u/ encl:

L. ". SinClair, President and Chief 0-eratino Of ficer

reneration

J. P. Cayne, Senior Vice President-Suclaar

A. ;;1ausmann, Vice Presidcat-Ouality Tssurcnce

. C. Cesarove, Quality Assurance Superintendent

J. F. Davis, Chairuan, Safety Review Comittee

C. ". Pratt, Assistant General Counsel

P

OFFICIAL RECORD COPY

w-

E.

-

.

4

Porer f.uthority of the State

3

MAy

1~,*

U34

-,

of ticu Yor);

Public Docuntnt Poon (K;R)

local Public Docunent P.oom (LPDR)

!;uclear Safety Inform. tion Center (NSIC)

i;RC T,esident Inspector

State of flew York

bcc w/ encl:

Region I Doclet Room (with concurrences)

Chief, Operational Support Section (w/o encis)

,

i

i

i

i

i

R DPRP:JCL

R DPRP:LTD

RI

P:HBK

RI:DPR[/f(

EJB A

$d b

f[/<

l

05/06/82

05/06/82

l

0FFICIAL RECORD COM

a

f

i