ML20053A677
| ML20053A677 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/11/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20053A678 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8205270113 | |
| Download: ML20053A677 (2) | |
See also: IR 05000293/1982013
Text
-
.
w
I
MAY 11 1982
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN:
Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts
02199
Gentlemen:
Subject:
Inspection 50-293/82-13
This refers to the routine safety inspection conducted by Dr. P. K. Eapen of
this of fice on April 12-16, 1982 at the Pilgrim Nuclear Power Station and at
your Corporate offices of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Dr. Eapen with R. Machon and other
members of your staf f at the conclusion of the inspection, and to a subsequent
telephane call between Mr. R. Starostecki of this office and Mr. Harrington on
April 20, 1982 to discuss the Management Controls relative to design review
and verification.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
5.n not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This violation has
been categori: ed by severity level in accordance with the NRC Enforcement
policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9937) dated March 9, 1932.
You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1930, PL 96-511.
In accordance with 10 CFR P.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe
necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
OFFICIAL RECORD CCPY
\\
820527 0 (Ib Q
d(
,
4
4
.
Boston Edison Company M/C Nuclear
2
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed By:
,
Thomas T. Martin, Director
D' vision of Engineering and Technical
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-293/82-13
cc w/encls:
A. V. Morisi, Manager, Nuclear Operations Support
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
T. C. Elsasser
[ / Qb
\\
R1:DETP
R1:oETP
R1:0ETP
Eapen/wb
Caphten
Ebnet ry
h[/
bFFICIALRECORDCOPY