Forwards IE Insp Rept 50-293/82-13 on 820412-16 & Notice of Violation
ML20053A677
Person / Time
Site: Pilgrim
Issue date: 05/11/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20053A678 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8205270113
Download: ML20053A677 (2)


See also: IR 05000293/1982013

Text

-

.

w

I

MAY 11 1982

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN:

Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection 50-293/82-13

This refers to the routine safety inspection conducted by Dr. P. K. Eapen of

this of fice on April 12-16, 1982 at the Pilgrim Nuclear Power Station and at

your Corporate offices of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Dr. Eapen with R. Machon and other

members of your staf f at the conclusion of the inspection, and to a subsequent

telephane call between Mr. R. Starostecki of this office and Mr. Harrington on

April 20, 1982 to discuss the Management Controls relative to design review

and verification.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

5.n not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This violation has

been categori: ed by severity level in accordance with the NRC Enforcement

policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9937) dated March 9, 1932.

You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1930, PL 96-511.

In accordance with 10 CFR P.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

The telephone notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe

necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

OFFICIAL RECORD CCPY

\\

820527 0 (Ib Q

d(

,

4

4

.

Boston Edison Company M/C Nuclear

2

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

,

Thomas T. Martin, Director

D' vision of Engineering and Technical

Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report Number 50-293/82-13

cc w/encls:

A. V. Morisi, Manager, Nuclear Operations Support

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bcc w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

T. C. Elsasser

[ / Qb

\\

R1:DETP

R1:oETP

R1:0ETP

Eapen/wb

Caphten

Ebnet ry

h[/

bFFICIALRECORDCOPY