Text
~
'%
.
,
y
p
y
r.,
c
~g
G
eg
.y
y
g
Ag
-
-
.
.
APR 261982.
Docket Hos. 50-508, 50-509
Washington Public Power Supply System
P. O. Box 1223
Elma, Washington 98541
,
)
Attention: Mr. R. S. Leddick
Program Director WNP-3/5
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Project
Nos. 3 and 5 (WNP-3/5)
This refers to the inspection conducted by Mr. W. G. Albert of this
office on March 1-31, 1982 of activities authorized by HRC Construction
Permit Nos. CPPR-154 and 155, and to the discussion of our findings held
with Mr. Leddick and other members of the Supply System staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative recors'.5, inter-
views with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless you
notify this office, by telephone, within ten days of the date of this
letter and submit written application to withhold infonnation contained
therein within thirty days of the date of this letter.
Such application
must be consistent with the requirements of 2.790(b)(1).
8205240298 820426
PDR ADOCK 05000508
l E= O I
"""
"m>
. Ry. , , ,
,
,,Q,,
', ,Q
, ,,q,gj ,,
,
,
, ,, , ,
"""^ 4 ..MBE W mn,.
,DO.DDS . ,,
,,BISM0P,,
\\ ,,
,
,,
,,
,,,,,,,, ,
o. 4 ,4/p/82
4/')V82
4/p82
. .....
.... .
.
. ... . .
. .
. ..
.
... .
NHC FORM 318 HO 808 NHCM O240
OFFICIAL RECORD COPY
' " ' *- 32"2 4
o'
.
.
Washington Public Power Supply System
-2-
APR 261982
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
Original signed by
T. U. Bishop for
T. W. Bishop, Chief
Reactor Construction Projects Branch
Enclosures:
A.
Appendix A - Hotice of Violation
B.
Inspecticn Report
Nos. 50-508/82-06
50-509/82-03
cc w/o enclosure B:
R. B. Glasscock, Quality Assurance
Director, UPPSS
D. E. Dobson, Project Manager, WPPSS
bcc: