ML20052J002

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/82-06 & 50-509/82-03 on 820301-31 & Notice of Violation
ML20052J002
Person / Time
Site: Satsop
Issue date: 04/26/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20052J003 List:
References
NUDOCS 8205240298
Download: ML20052J002 (2)


See also: IR 05000508/1982006

Text

~

'%

.

,

y

p

y

r.,

c

~g

G

eg

.y

y

g

Ag

-

-

.

.

APR 261982.

Docket Hos. 50-508, 50-509

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

,

)

Attention: Mr. R. S. Leddick

Program Director WNP-3/5

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Project

Nos. 3 and 5 (WNP-3/5)

This refers to the inspection conducted by Mr. W. G. Albert of this

office on March 1-31, 1982 of activities authorized by HRC Construction

Permit Nos. CPPR-154 and 155, and to the discussion of our findings held

with Mr. Leddick and other members of the Supply System staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative recors'.5, inter-

views with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold infonnation contained

therein within thirty days of the date of this letter.

Such application

must be consistent with the requirements of 2.790(b)(1).

8205240298 820426

PDR ADOCK 05000508

l E= O I

"""

"m>

. Ry. , , ,

,

,,Q,,

', ,Q

, ,,q,gj ,,

,

,

, ,, , ,

"""^ 4 ..MBE W mn,.

,DO.DDS . ,,

,,BISM0P,,

\\ ,,

,

,,

,,

,,,,,,,, ,

o. 4 ,4/p/82

4/')V82

4/p82

. .....

.... .

.

. ... . .

. .

. ..

.

... .

NHC FORM 318 HO 808 NHCM O240

OFFICIAL RECORD COPY

' " ' *- 32"2 4

o'

.

.

Washington Public Power Supply System

-2-

APR 261982

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

Original signed by

T. U. Bishop for

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosures:

A.

Appendix A - Hotice of Violation

B.

Inspecticn Report

Nos. 50-508/82-06

50-509/82-03

cc w/o enclosure B:

R. B. Glasscock, Quality Assurance

Director, UPPSS

D. E. Dobson, Project Manager, WPPSS

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

Engelken (w/ Encl A)

A. Johnson (w/ Enc 1 A)

Project Inspector

Resident Inspector

State of WA (Lewis)

,

+