ML20052H947
| ML20052H947 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/06/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20052H948 | List: |
| References | |
| NUDOCS 8205240234 | |
| Download: ML20052H947 (2) | |
See also: IR 05000423/1982004
Text
r
.
.
N4Y06 g
Docket No. 50-423
Nc.theast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
~
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-423/82-04
This refers to the routine safety inspection conducted by Mr. J. Mattia of
this office on March 1-31, and April 1-9, 1982 at the Millstone Nuclear Power
Station, Unit 3, at Waterford, Connecticut of activities authorized by NRC
License No. CPPR-113 and to the discussions of our findings held by Mr. Mattia
with Mr. Toth and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
violations have been categorized by severity level in accordance with the NRC
Enforcement policy (10 CFR 2, Appendix C) published in the Federal Register
i
Notice (47 FR 9987) dated March 9, 1982. You are required to respond to this
'
letter and in preparing your response, you should follow the instructions in
Appendix A.
The responses directed by this letter and the accompanying Notice are not
,
subject to the clearance procedures of the Office of Management and Budget as
i
required by the Paperwork Reduction Act of 1980, PL 96-511,
i
l
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the requirements
of2.790(b)(1).
The telephone notification of your intent to request withholding,
+
,
!
0FFICIAL RECORD COPY
p, l
%
-
i
'
8205240234 820506
PDR ADOCK 05000423
G-
,
L
I
.
.
Northeast Nuclear Energy Company
2
MAY 0 6 1982
.
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at
(215) 337-5223.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Signed DF8'
'/
ichard W. Starostecki, D rector,
Division of Project and Resident
Programs
Enclosure: Appendix A, Notice of Violation
cc w/ enc 1:
K. W. Gray, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
J. F. Opeka, Vice President, Nuclear Operations
R. T. Laudenat, Manager, Generation Facilities Licensing
D. G. Diedrick, Manager of Quality Assurance
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Connecticut
NRC Resident Inspector
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
!
i
l
t
.
.
RI:DP
RI:DP
RI: PRP
l
Mattia/ gwc
Elsatser Brunner
4/28/82
A if $V
5/'9/'gv0FFICIAL RECORD COPY
'
l
,
i