ML20052H947

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/82-04 on 820301-31 & 0401-09 & Notice of Violation
ML20052H947
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/06/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20052H948 List:
References
NUDOCS 8205240234
Download: ML20052H947 (2)


See also: IR 05000423/1982004

Text

r

.

.

N4Y06 g

Docket No. 50-423

Nc.theast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

~

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-423/82-04

This refers to the routine safety inspection conducted by Mr. J. Mattia of

this office on March 1-31, and April 1-9, 1982 at the Millstone Nuclear Power

Station, Unit 3, at Waterford, Connecticut of activities authorized by NRC

License No. CPPR-113 and to the discussions of our findings held by Mr. Mattia

with Mr. Toth and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These

violations have been categorized by severity level in accordance with the NRC

Enforcement policy (10 CFR 2, Appendix C) published in the Federal Register

i

Notice (47 FR 9987) dated March 9, 1982. You are required to respond to this

'

letter and in preparing your response, you should follow the instructions in

Appendix A.

The responses directed by this letter and the accompanying Notice are not

,

subject to the clearance procedures of the Office of Management and Budget as

i

required by the Paperwork Reduction Act of 1980, PL 96-511,

i

l

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of2.790(b)(1).

The telephone notification of your intent to request withholding,

+

,

!

0FFICIAL RECORD COPY

p, l

%

-

i

'

8205240234 820506

PDR ADOCK 05000423

G-

PDR

,

L

I

.

.

Northeast Nuclear Energy Company

2

MAY 0 6 1982

.

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed DF8'

'/

ichard W. Starostecki, D rector,

Division of Project and Resident

Programs

Enclosure: Appendix A, Notice of Violation

cc w/ enc 1:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

NRC Resident Inspector

bcc w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

!

i

l

t

.

.

RI:DP

RI:DP

RI: PRP

l

Mattia/ gwc

Elsatser Brunner

4/28/82

A if $V

5/'9/'gv0FFICIAL RECORD COPY

'

l

,

i