OPERATING DATA REPORT
.s DOCKET NO. 50-348 DATE 5/07/82 COMPLETED fly W.G. Hairston, III TELErilONE (205) 89dT-5156 OPERA IING STATUS Notes 1) Cumulative data
- 1. Unit Name: Josenh M. Farlev - Unit 1 since 12/01/77, date of
- 2. Reporting Period: - April. 1982 commercial operation.
- 3. Licemed 1 hennal Power IMWt):
2652
- 4. Nameplate Rating (Gims MWe):
860 829
- 5. Design Electrical Rating INet MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
844.6
- 7. Maximum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7iSince Last Report.Gise Reasom:
N/A 9 Power Leiel lo Which Re*tricted,if Anv (Net MWe):
N/A
- 10. Reasom For Restrictions,if Any: N/A t his Month Yr..to l' ate Cumulatise i1. ilours in Repmting Period 719
- 12. Number Of Ilours Reactor Was Critical 708.8 2.879 38,687 1,378.1 22,359.9
- 13. Reactor Resene Shutdown liours 10.2 36.6 3,528.6
- 14. Ilours Generator On-Line 621.5 1.189.0 21,518.7 l
- 15. Unit Resene Shutdown flours 0
0 0
- 16. Gross Therr. : Energy Generated (MWill 1.523.773 2.777.811 53.722.722 17 Grow Elect'rical Energy Generated (MWill 479 394 874.102 17.111.054 u
IS. Net Electrical Energy Generated (MWill 450.330 799.374 16.023.098
- 19. Unit Senice l' actor 86.4 41.3 55.6
- 20. Unit Asailability Factor 86.4 41.3 55,6
- 21. Unit Capacity Factor IUsing MDC Net) 77.9 34.6 51.5
- 22. Unit Capacity Factor (Using DER Net) 75.5 33.5 50.0
- 23. Unit Forced Outage Rate 13.6 58.3 21.7
- 24. Shutdowm Scheduled Oser Nest 6 Months IType. Date.and Duration of Each t:
1 N/A
- 25. If Shut Down At End Of Report Period. litimated Date of Startup:
N/A
- 26. Units in Test Statm (Prior to Commercial Operation):
Forecast Achised INI TI A L C RITICAllIY 8/06/77 8/09/77 INill AL ELFC1RICITY 8/20/77 8/18/77 COMMERCIA L OPER A IlON 12/01/77 12/01/77 (9/77) 8205210371 820513 PDR ADOCK 05000348 R
DOC)1TNO.
50-348 tjNIT J. M.
F'rl*v-Unit 1 DAE 5/07/82 C05tPLETED BY W.G. Hairston, III TELEPl!ONE (205) 899-5156 510fG11 Anril DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P05ER LEVEL (51\\ietiet)
(SIWE tiet) g, 799 37 10 13 253 2
RO1 375 3
768 19 551 4
708
- g 5
796 21 ' '
793 6
806 22 799 7
810 23 798
-s g
806 24 766 9
800 15 745 778 10 808 26 13 810 27 783-12 807 23 787 13 326 29 768 11 30 798 IS
~0' 3l 16,
CISIRUCI:ONS Cn this torm:t. list the svenge daily unit power !cvelin MWe Net for each d:y in the reporting month. Compute to
, the nearnt whule nr;2 wast.
%g
~
(9/77) w,-
4*
e f
e e
(~
(})
f Q
O UNITSilUTUOWNS ANDPOWER REDUCllONS DOCKET NO.
50-148 UNIT NAME J. M.
Farlev Unit 1 DATE _ 5/07/82 COMPLETED BY U c H,4 raton. III ILEPORT &f 0NT11 hvf1 10R2 TELEI' HONE (205) 809-5156 "E
E w
,$E
}
jY5 Lkensee E.r, gwt Cause & Corrective No.
Date g
gg
.g g 5 Event u?
o3 Action to H
5 j 6; g Report *
$U Prescr.: Recurrence 550 5
003 820413 F
87.8 G
3 NA ED ZZZZZZ Reactor t rip.
LOSP "B" Train due to inadvertent actuation of relays at the switchhouse during routine testing.
004 820417 F
- 9. 7 G
3 NA 01 Pump Reactor trip - turbine trip.
Inadvertent trip of the "A" feed pun:p while maintenance personnel working in the area.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructiims S: Scheduled A-Equipment Failure (Explain) 1-Hanual for Prepasation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheeis for Licensee C Refueling 3 Automatic Scram.
Event Repor (LER) FileINUREG-D-Regulatosy Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5
G Operational Error (Explain)
Exhibit I - Same Source 19/77)
Il-Other (Explain)
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS APRIL, 1982 There were two (2) automatic shutdowns in the month of April.
The following safety-related maintenance was performed in the month of April:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced packing on #5 and #10 river water pumps.
- 3. Installed new pump assembly on IA Service Water Pump.
- 4. Unclogged Boron Injection Tank recircuiation pump discharge drain lines,
- 5. Replaced and rewired river water B train strainer auto blowdown valve.
t f
~,,~
OPER ATING DATA REPORT DOCKET NO. 50-348 DATE 5/07/82 COMPLETED BY EG. Hairston, III TELErliONE (205) 89f-5156 OPERATING STATUS
- 1. Unit Name: _ Joseph M. Farley - I' nit 1
^
i ce 2/0 /7 dat
- 2. Reimrting Period:
_Anr11. 1982 commercial operation.
2652
- 3. Licenwd Thermal Power (MWt):
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWel:
844.6
- 6. Maximum Dependable Capacity (Gross MWe):
803.6
- 7. Maximum Dependabic Capacity (Net MWe)
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Gise Reasons:
N/A
- 9. Power Lesel To which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A Thi. Month Yr.-to-Date Cumulatise 719 2.879 38,687 11, ilours In Reporting Period
- 12. Number Of flours Reactor Was Critical 708.8 1,378.1 22,359.9
- 13. Reactor Resene Shutdown Honrs 10.2 36.6 3,528.6
- 14. Hours Generator On-Line 621.5 1.189.0 21,518.7
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Grou Thermal Energy Generated (MWH p 1.523.773 2.777.811 53.722.722 17 Grow Electrical Energy Generated (MWH) 479 394 874.102 17.111.054 t
- 18. Net Electncal Energy Generated (MWH) 450.030 799.374 16.023,098._
- 19. Unit Senice Factor 86.4 41.3 55.6 86.4 41.3 55.6
- 20. Unit Availability Factor 77.9 34.6 51.5
- 21. Unit Capacity Factor IUsing MDC Net)
- 22. Unit Capacity Factor IUsing DER Net) 75.5 33.5 50.0 13.5 58.3 21.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheiluted Oser Nest 6 Months (Type.Date,and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior io Commercial Operation):
Forecast Achiesed
~
INITI A L CRITIC A LITY 8/06/_77 8/09/77 h'
INill AL ELFClRICITY 8/20/_77
_B/18/77 COMM ERCI A L OPER A TION 12/01/_77 12/01/77 en/77:
DOCXIT fio.
50-348 UNIT J.M. Priev-Unit 1 DATE 5/07/82 COS!PLETED BY W.G. Hairston. III TELEPl!ONE (205) 899-5156 M0f(111 Antil DAY AVERACE DAILY POWER LEVEL
- DAY AVERACE DAILY POWER LEVEL (Mhe Net)
(MWe Net) 10 799 g7 3,
253 jg 2
Ani 375 3
768 39 551 4
708 go 5
79.6 21 793 799 6
806 22 798 r
7 810 23 g
806 24 766 9
800 25 745 778 10 808 26 783-g 810 27 12 807
- 3 787 13 326 29 768 14 30 798
~0~
31 15 16 INSTRUCIlONS On this fornot. list the svenge daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to
, the neare t whole negswatt.
(997)
Q
. t M
a wm W
w w
g
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-MS UNIT N AME J. M.
Farlev Unit 1 DATE 5/07/82 COMPLETED BY u e n,4 rernn. try REPORT MONTH Anrf1 - 1982 TELEPHONE (205) 899-5156 e.
E w
c
,$ E Y5 l_icensee Eg
{%
Cause A Currective t(
3g 3s&
Event s '2 o-1 Action to No.
Date
$E 5
j ga y Report #
[U
$0 Prevent Recurrence E
003 820413 F
87.8 G
3 NA ED ZZZZZZ Reactor trip.
LOSP "B" Train due to inadvertent actuation of relays at the switchhouse during routine testing.
004 820417 F
- 9. 7 C
3 NA Of Pump Reactor trip - turbine trip.
Inadvertent trip of the "A" feed pump while maintenance personnel working in the area.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Ucensee C-Refueling 3-Automatic Scram.
Event Report (1.ER) File (NUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Exandnation F-Administrative 5
G-Operational Error (Explain)
Exhibit I.Same Source (9/77) ll Other (Empiain)
-