ML20052H725

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1982.Narrative Summary of Operating Experience Encl
ML20052H725
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/07/1982
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20052H719 List:
References
NUDOCS 8205210371
Download: ML20052H725 (7)


Text

. _ . . - -- - -- -

.s OPERATING DATA REPORT DOCKET NO. 50-348 DATE 5/07/82 COMPLETED fly W.G. Hairston, III TELErilONE (205) 89dT-5156  ;

OPERA IING STATUS

1. Unit Name: Josenh M. Farlev - Unit 1 Notes 1) Cumulative data
2. Reporting Period: - April. 1982 since 12/01/77, date of 2652 commercial operation.
3. Licemed 1 hennal Power IMWt):
4. Nameplate Rating (Gims MWe): 860
5. Design Electrical Rating INet MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 844.6
7. Maximum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7iSince Last Report.Gise Reasom:
N/A 9 Power Leiel lo Which Re*tricted,if Anv (Net MWe)
N/A
10. Reasom For Restrictions,if Any: N/A

, t his Month Yr..to l' ate Cumulatise i1. ilours in Repmting Period 719 _ 2.879 _ _ _

38,687

12. Number Of Ilours Reactor Was Critical 708.8 1,378.1 22,359.9
13. Reactor Resene Shutdown liours 10.2 36.6 3,528.6
14. Ilours Generator On-Line 621.5 1.189.0 21,518.7 l 15. Unit Resene Shutdown flours 0 _ 0 0
16. Gross Therr. : Energy Generated (MWill 1.523.773 2.777.811 53.722.722 17 Grow Elect'rical Energy Generated (MWill 479u394 874.102 17.111.054 IS. Net Electrical Energy Generated (MWill 450.330 799.374 16.023.098
19. Unit Senice l' actor 86.4 41.3 55.6
20. Unit Asailability Factor 86.4 41.3 55,6
21. Unit Capacity Factor IUsing MDC Net) 77.9 34.6 51.5
22. Unit Capacity Factor (Using DER Net) 75.5 33.5 50.0
23. Unit Forced Outage Rate 13.6 58.3 21.7
24. Shutdowm Scheduled Oser Nest 6 Months IType. Date.and Duration of Each t: 1 N/A i
25. If Shut Down At End Of Report Period. litimated Date of Startup: N/A
26. Units in Test Statm (Prior to Commercial Operation): Forecast Achised INI TI A L C RITICAllIY 8/06/77 8/09/77 INill AL ELFC1RICITY 8/20/77 8/18/77 COMMERCIA L OPER A IlON 12/01/77 12/01/77 (9/77) 8205210371 820513 PDR ADOCK 05000348 R PDR
  • DOC)1TNO. 50-348

'- tjNIT J . M. F'rl*v-Unit 1 DAE 5/07/82 C05tPLETED BY W.G. Hairston, III

' TELEPl!ONE (205) 899-5156 510fG11 Anril -

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P05ER LEVEL (51\ietiet) (SIWE tiet) g, 799 37 10 2 RO1 -

13 253 3 768 19 ,_

375 4 708 ;g _

551 5 796 21 ' ' 793 6 806 22 799

-s 7 810 23 798 g 806 24 766 9 800 15 745 10 808 26 ___

778 13 810 27 783-12 807 23 787 ,

13 326 29 768 -

11 30 798

~0'

- IS 3l 16 .

CISIRUCI:ONS Cn this torm:t. list the svenge daily unit power !cvelin MWe Net for each d:y in the reporting month. Compute to

, the nearnt whule nr;2 wast.

g

~

(9/77) w ,-

e 4*

f ,

e e

(~ f .

Q (})

O UNITSilUTUOWNS ANDPOWER REDUCllONS DOCKET NO. 50-148 UNIT NAME J. M. Farlev Unit 1 DATE _ 5/07/82 ILEPORT &f 0NT11 hvf1 10R2 COMPLETED BY U c H,4 raton . III TELEI' HONE (205) 809-5156 w "E E

-, ,$E };; jY5 Lkensee E.r, gwt Cause & Corrective No. Date g gg .g g 5 Event u? o3 Action to H 5 550

$. j 6; g Report

  • _

$U Prescr.: Recurrence 5

003 820413 F 87.8 G 3 NA ED ZZZZZZ Reactor t rip. LOSP "B" Train due to inadvertent actuation of relays at the switchhouse during routine testing.

004 820417 F 9. 7 G 3 NA 01 Pump Reactor trip - turbine trip.

Inadvertent trip of the "A" feed pun:p while maintenance personnel working in the area.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled A-Equipment Failure (Explain)

Exhibit G. Instructiims 1-Hanual for Prepasation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheeis for Licensee C Refueling 3 Automatic Scram.

D-Regulatosy Restriction Event Repor (LER) FileINUREG-4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5 G Operational Error (Explain) 19/77) Il-Other (Explain) Exhibit I - Same Source

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1982 There were two (2) automatic shutdowns in the month of April.

The following safety-related maintenance was performed in the month of April:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced packing on #5 and #10 river water pumps.
3. Installed new pump assembly on IA Service Water Pump.
4. Unclogged Boron Injection Tank recircuiation pump discharge drain lines,
5. Replaced and rewired river water B train strainer auto blowdown valve.

t f

OPER ATING DATA REPORT DOCKET NO. 50-348 DATE 5/07/82 COMPLETED BY EG. Hairston, III TELErliONE (205) 89f-5156 OPERATING STATUS

^

1. Unit Name: _ Joseph M. Farley - I' nit 1 i ce 2/0 /7 dat
2. Reimrting Period: _Anr11. 1982 commercial operation.
3. Licenwd Thermal Power (MWt):

2652

4. Nameplate Rating (Gross MWe):

860

5. Design Electrical Rating (Net MWel:

829 -

6. Maximum Dependable Capacity (Gross MWe): 844.6
7. Maximum Dependabic Capacity (Net MWe) 803.6
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7)Since Last Report.Gise Reasons:

N/A

9. Power Lesel To which Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions.lf Any: N/A Thi. Month Yr.-to-Date Cumulatise 11, ilours In Reporting Period 719 2.879 38,687
12. Number Of flours Reactor Was Critical 708.8 1,378.1 22,359.9
13. Reactor Resene Shutdown Honrs 10.2 36.6 3,528.6
14. Hours Generator On-Line 621.5 1.189.0 21,518.7
15. Unit Resene Shutdown Hours 0 0 0
16. Grou Thermal Energy Generated (MWH p 1.523.773 2.777.811 53.722.722 17 Grow Electrical Energy Generated (MWH) 479t394 874.102 17.111.054
18. Net Electncal Energy Generated (MWH) 450.030 799.374 16.023,098._
19. Unit Senice Factor 86.4 41.3 55.6
20. Unit Availability Factor 86.4 41.3 55.6
21. Unit Capacity Factor IUsing MDC Net) 77.9 34.6 51.5
22. Unit Capacity Factor IUsing DER Net) 75.5 33.5 50.0
23. Unit Forced Outage Rate 13.5 58.3 21.7
24. Shutdowns Scheiluted Oser Nest 6 Months (Type.Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior io Commercial Operation): Forecast .

Achiesed

~

INITI A L CRITIC A LITY 8/06/_77 8/09/77 INill AL ELFClRICITY 8/20/_77 _B/18/77 h' COMM ERCI A L OPER A TION 12/01/_77 12/01/77 en/77:

DOCXIT fio. 50-348 UNIT J.M. Priev-Unit 1 DATE 5/07/82 COS!PLETED BY W.G. Hairston . III

' TELEPl!ONE (205) 899-5156 M0f(111 Antil ,_,

DAY AVERACE DAILY POWER LEVEL

  • DAY AVERACE DAILY POWER LEVEL (Mhe Net) (MWe Net) 799 g7 10 3,

. jg 253 2 _.

Ani 375 3 __ _

768 39 708 go 551 4

79.6 21 793 5

806 22 799 6

810 23 798

., 7 .

r '

g 806 24 766

' 745 9 800 25 808 26 778 10 g 810 27 783-807 ;3 787 12 ,

13 326 29 768 ,

30 798 14

. 15

~0~ 31 -

16  ;

INSTRUCIlONS On this fornot. list the svenge daily unit power levelin MWe Net for esch d:y in the reporting month. Compute to

, the neare t whole negswatt. .

(997)

Q

. t .

a -- wm W M _

w ---

w g --

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-MS UNIT N AME J. M. Farlev Unit 1 DATE 5/07/82 REPORT MONTH Anrf1 - 1982 COMPLETED BY u e n,4 rernn . try TELEPHONE (205) 899-5156 e.

w E c

,$ E Y5 l_icensee Eg {% Cause A Currective No. Date t(

3g  ;; 3s& Event s '2 o-1 Action to

$E 5 j ga y Report # $0 E

[U Prevent Recurrence 003 820413 F 87.8 G 3 NA ED ZZZZZZ Reactor trip. LOSP "B" Train due to inadvertent actuation of relays at the switchhouse during routine testing.

004 820417 F 9. 7 C 3 NA Of Pump Reactor trip - turbine trip.

Inadvertent trip of the "A" feed pump while maintenance personnel working in the area.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G . Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Ucensee C-Refueling 3-Automatic Scram. Event Report (1.ER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Exandnation F-Administrative 5 G-Operational Error (Explain)

Exhibit I .Same Source (9/77) ll Other (Empiain)

_-