g.

MaHing Address o

AlaDima Power Company 600 North 18th Street Post Othce Box 2641 Dirmingham. Alabama 35291 Telephone 205 7834081 F. L. Cta yton, Jr.

b i=7,'dl%%"l"'

Alabama Power tre wurten vrac system May 13, 1982 Docke t No. 50-348 Director, Of fice of Management Information and Program Control U.

S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M.

Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the April, 1982 Monthly Operating Report for Joseph M.

Farley Nuclear Plant, Unit 1, required by Section 6.9.1.6 of the Unit 1 Technical Specifications.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F.

L.

Clayto, Jr.

FLCJr/KWM:nac Enclosures

]{ lb y

xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies) i Director, RII (1 copy) l I

8205210366 820513 PDR ADOCK 05000348 R

PDR

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1982 There were two (2) automatic shutdowns in the month of April.

The following safety-related maintenance was performed in the month of April:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced packing on #5 and #10 river water pumps.
3. Installed new pump assembly on lA Service Water Pump.
4. Unclogged Boron Injection Tank recirculation purp discharge drain lines.
5. Replaced and rewired river water B train strainer auto blowdown valve.